Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per EPG, delayed revision to EPG 4143.3.3)
m (EPG 903.6.22)
(48 intermediate revisions by the same user not shown)
Line 14: Line 14:
  
  
 +
{|style="padding: 0.3em; border:2px solid #696969; color: #000; text-align:center; font-size: 100%; background:#f5f5f5" width="1030px" align="center"
 +
|-
 +
|'''<Big>Our mission is to provide a world-class transportation system that is safe, innovative, reliable<br/>and dedicated to a prosperous Missouri.'''
 +
|}
 +
 +
 +
{|style="padding: 0.3em; border:1px solid #696969; color: #000; text-align:center; font-size: 100%; background:#A9A9A9" width="1000px" align="center"
 +
|-
 +
!<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 +
|}
 +
{|style="padding: 0.3em; border:1px solid #696969; color: #000; text-align:left; font-size: 100%; background:#F8F8FF" width="1000px" align="center"
 +
|-
 +
|MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>
 +
Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments.  These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/mt/default.aspx Maintenance], [http://sp/sites/tp/Pages/default.aspx Planning], [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way] and [http://sharepoint/systemdelivery/tr/Pages/default.aspx Traffic] guidance.
 +
|}
  
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
{| cellspacing="3"  
 
{| cellspacing="3"  
|- valign="top" width="100%"
+
| valign="top" width="100%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
|style="border: 1px solid #696969; color: #000; background-color: #A9A9A9"|<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 
| valign="top" width="60%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
 
 
|-
 
|-
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
+
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
+
'''[[903.6 Warning Signs#903.6.22 Low Clearance Sign (W12-2 and W12-2a) (MUTCD Section 2C.27)|EPG 903.6.22 Low Clearance Sign]]'''
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised.  Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry. 
 
 
 
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Traffic] and [http://sharepoint/systemdelivery/mt/default.aspx Maintenance] manuals. 
 
  
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.  
+
7/12/19: Guidance has been clarified and generally re-written.
  
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
+
'''[[:Category:101 Standard Forms#Storm Water Database Quick Reference Guides (QRGs)|EPG Storm Water Database Quick Reference Guides (QRGs)]]
'''[[751.22 P/S Concrete I Girders#751.22.3.13 Intermediate Diaphragms|EPG 751.22.3.13 Intermediate Diaphragms]]'''
 
  
1/11/19:  Guidance about the spacing of steel intermediate diaphragms for PSI girders was revised to include NU girders.  
+
7/11/19: The storm water QRGs have been updated and collected under their own heading in EPG 101 Standard Forms. New storm water QRGs have also been added.
  
'''[[751.50 Standard Detailing Notes#(A3.5.1) Use when uncoated steel|Standard Detailing Note A3.5.1]]'''
+
'''[http://epg.modot.org/index.php/141.2_Missouri_Transportation_Finance_Corporation_(MTFC)_Loans#141.2.11_Terms_of_Loans EPG 141.2.11 Terms of Loans]'''
  
1/11/19: A new note for uncoated steel coming in contact with galvanized piles is now available.
+
7/10/19: Guidance has been updated to reflect the changes the MTFC board recently approved.
  
'''[[127.25 Maintenance Environmental Policies#127.25.2 Hazardous Material Spills|EPG 127.25.2 Hazardous Material Spills]]'''
+
'''[[236.16 Outdoor Advertising#236.16.12.1 Digital Upgrade Request|EPG 236.16.12.1 Digital Upgrade Request]]'''
  
1/10/19: Guidance has been updated to current practice.
+
6/25/19: Guidance has been expanded about how MoDOT personnel may handle upgrade requests.
  
'''[[:Category:903 Highway Signing#Guidance for Using Sign Management System (SMS)|Guidance for Using Sign Management System]] and [[903.3 Post-Mounted Signing#903.3.16 Ordering Signs|EPG 903.3.16 Ordering Signs]]'''
+
'''[[751.22 P/S Concrete I Girders#Pretensioned anchorage zones|Pretensioned Anchorage Zones]]'''
  
1/9/19: Guidance has been updated to current practices. New guidance for the use of the Sign Management System is now available. 
+
6/21/19: Terminology about the prestress force at transfer was clarified to better match AASHTO code.
  
'''[[236.3 Administration#The District Right of Way Manager|EPG 236.3.7 Right of Way Clearance Certification]]'''
+
'''[[127.13 Noise|EPG 127.13 Noise]]'''
  
1/8/19: Added guidance for the RW clearance process for projects programmed in the STIP with RW funding but that do not require RW to construct the project.  
+
6/21/19: Several updates including the clarification of [[127.13 Noise#Noise Screening Analysis Procedure|screening methodology]]. Also clarified that all benefitted receptors are to be included in the benefit cost reasonableness calculation and noise abatement voting.  
  
'''[[:Category:121 Project Planning, Prioritization and STIP Commitments|EPG 121 Project Planning, Prioritization and STIP Commitments]]'''
+
'''[[127.25 Maintenance Environmental Policies#127.25.1.7 Disposal of Animal Carcasses|EPG 127.25.1.7 Disposal of Animal Carcasses]]'''
  
1/4/19: Guidance has been updated to current practice. EPG 121.2 The Planning Process and EPG 121.5 Prioritization Factors were both re-written and re-titled as [[121.2 The Planning Framework for Transportation Decision-Making|EPG 121.2 The Planning Framework for Transportation Decision-Making]] and [[121.5 Asset Management|EPG 121.5 Asset Management]], respectively.
+
6/14/19: Updated guidance to match current practice, which has been coordinated with MO Dept. of Conservation.
  
'''[[910.4 ITS Achitecture#Project ITS Architecture Documentations Requirements|EPG 910.4 ITS Achitecture]]
+
'''[[750.7 Non-Hydraulic Considerations#750.7.3 Environmental Requirements|EPG 750.7.3 Environmental Requirements]]'''
  
1/3/19: New guidance on completing a systems engineering analysis on all ITS projects is now available.
+
6/14/19: Expanded guidance, especially in the new [[750.7 Non-Hydraulic Considerations#750.7.3.1 Stream Classifications|EPG 750.7.3.1 Stream Classifications]], clarified our process to meet the Corps' requirements for their "Regional Condition".  
  
'''Weathering Steel'''
+
'''[[236.7 Negotiation#236.7.2.9 Negotiation Procedures|EPG 236.7.2.9 Negotiation Procedures]] and [[236.7 Negotiation#236.7.7.3 Taxpayer Identification Numbers|EPG 236.7.7.3 Taxpayer Identification Numbers]]'''
  
12/28/18: Guidance for the use of weathering steel has been added to [[751.1 Preliminary Design#Weathering steel may be used|EPG 751.1.2.9 Girder Type Selection]].
+
6/4/19: Guidance has been updated to reflect that the IRS Form W-9 is no longer needed.
  
'''[[:Category:235 Preliminary Plans#The district completes an electronic|EPG 235.6 Approval of Preliminary Plan]]'''
+
'''[[751.50 Standard Detailing Notes#(E2.26)|Standard Detailing Note]]'''
  
12/28/18: The district now completes an RES at each project development milestone, or at least at the Location/Conceptual state and final design.  
+
5/31/19: The commentary for Note E2.26 was clarified.  In the note itself, additional options were provided for piling minimum nominal axial compressive resistance.
  
'''The “DBE Termination, Substitution or Additional Request” Form'''
+
'''[[:Category:130 Value Engineering|EPG 130 Value Engineering]]'''
  
12/18/18: Guidance in [[:Category:108 Prosecution and Progress#2. For DBE requests,|EPG 108.1.1 Review and Approval of a Subcontract Request]] and [[:Category:108 Prosecution and Progress#Once a project is awarded,|EPG 108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting]] was clarified on the use of this form when a prime contractor proposes to terminate, substitute or add an additional DBE.
+
5/28/19: New guidance is now available for [[:Category:130 Value Engineering#130.3 Post-Award Value Engineering (PAVE)|Post-Award Value Engineering (PAVE)]] workshops, processes and project selections.
  
'''[[127.1 Request for Environmental Services|EPG 127.1 Request for Environmental Services]]'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#Fig. 616.6.87.1 Rumble Strip Placement in Flagging Operations|Figs. 616.6.87.1 Rumble Strip Placement in Flagging and 616.6.87.2 Rumble Strip Placement on a Divided Highway]]'''
  
12/12/18: Guidance regarding submittals of a final RES and the requirement of only 1 RES for some projects has been updated.
+
5/28/19: The spacing between the long-term rumble strips was increased to "10 to 12 feet" for a greater area of effectiveness.
  
'''TMA Light Bar'''
+
'''Median Crossover on a Divided Highway, TA-39'''
  
12/11/18: Guidance in [[:Category:612 Impact Attenuators#612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting|EPG 612.1.2 MoDOT Protective Vehicle/TMA Marking and Lighting]] and [[616.27 Fleet Lighting#616.27.1.1 Fleet Lighting Levels|EPG 616.27.1.1 Fleet Lighting Levels, Level 5]] has been updated to state that the Light Bar may be used and the Emergency Alert lights should be used on the Rear Advanced Warning Truck for striping and sweeping operations.  TA-35 MT and TA-35a-d MT were also updated.  
+
5/28/19: In [[616.8 Typical Applications (MUTCD 6H)#Listing of Typical Applications for Design and Construction and Materials|EPG 616.8 Typical Applications]], TA-39 for Design and Construction was revised to require Directional Indicator Barricades for tapers. The concrete barrier has been removed on sheet 2. Instead of the concrete barrier, an approved, temporary and crashworthy device can be used.
  
'''[[media:104.7 EngFac SFY 16 to 18.pdf|Engineering Factors Report]]'''
+
'''[[media:Fig 237.6.docx|Costs for Non-Contractual Items]]'''
  
12/10/18: The latest version of the Engineering Factors Report, providing SFY 2016 to SFY 2018 info, is now presented in [[104.7 Estimates|EPG 104.7 Estimates]].  
+
5/21/19: The most recent costs for non-contractual items is now presented in [[237.6 Estimates|EPG 237.6 Estimates]].
  
'''[[413.6 Scrub Seal Treatment|EPG 413.6 Scrub Seal Treatment]]'''
+
'''Pile Design'''
  
12/10/18: Scrub seal treatment guidance is now available.
+
5/17/19: Guidance for pile design procedure was clarified in several articles including [[:Category:702 Load-Bearing Piles|EPG 702 Load-Bearing Piles]], [[751.1 Preliminary Design#751.1.2.23 Types of Piling|EPG 751.1.2.23 Types of Piling]], [[751.3 Structural Steel Design Properties|EPG 751.3 Structural Steel Design Properties]] and [[751.36 Driven Piles|EPG 751.36 Driven Piles]].
  
'''AASHTOWare Project Quick Reference Guides'''
+
'''[[237.14 Electronic Design Data Delivery#237.14.2.9 Proposed 3D Top Surface Linear Features|EPG 237.14.2.9 Proposed 3D Top Surface Linear Features]]'''
  
12/10/18: [http://epg.modot.org/index.php/Category:101_Standard_Forms#AASHTOWare_Project_Quick_Reference_Guides_.28QRGs.29 AASHTOWare Project Quick Reference Guides] are now available in EPG 101 Standard Forms.  
+
5/10/19: This new guidance is for districts to be able to provide consultants with needed technical information.
  
'''[[127.9 Floodplain Management and the Regulatory Floodway#127.9.2 Process|EPG 127.9.2 Process]]'''
+
'''[[236.3 Administration#236.3.5 Right of Way Expenditures|EPG 236.3.5 Right of Way Expenditures]] and [[236.7 Negotiation#236.7.7 1099 Reporting of Acquisitions|EPG 236.7.7 1099 Reporting of Acquisitions]]'''
  
12/4/18: Guidance to adhere to CFR 650.111 was added to the bottom of EPG 127.9.2.
+
4/30/19: Guidance has been updated to current practice.
  
'''[[127.15 Reevaluation of National Environmental Policy Act (NEPA) Documents#127.15.3 Document Age|EPG 127.15.3 Document Age]]'''
+
'''[[236.16 Outdoor Advertising#236.16.18.1 Informal Hearing|EPG 236.16.18.1 Informal Hearing]]'''
  
11/30/18: Re-evaluations are required for all NEPA approvals that are more than 3 years old.
+
4/24/19: The membership constituting the ODA Informal Hearing Review Committee was updated.
  
'''NEPA Glossary'''
+
'''[[751.22 P/S Concrete I Girders#Calculation of camber (upward)|EPG 751.22.2.5 Deformations]]'''
  
11/29/18: A new [[127.14 National Environmental Policy Act (NEPA) Classification and Documents#127.14.5 NEPA Glossary|glossary of NEPA terms]] is now available in EPG 127.14 National Environmental Policy Act (NEPA) Classification and Documents.
+
4/22/19: Guidance was clarified, particularly in "calculation of camber (upward)","calculations of deflections (downward)" and "creep coefficient".
  
'''[[236.16 Outdoor Advertising#236.16.15 Vegetation Removal|EPG 236.16.15 Vegetation Removal]]'''
+
'''[[106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators|EPG 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators]]'''
  
11/28/18: Guidance was updated, particularly in [[236.16 Outdoor Advertising#236.16.15.6 Endangered Species Act|EPG 236.16.15.6 Endangered Species Act]] and [[236.16 Outdoor Advertising#236.16.15.8 Mowing and Brush Hogging|EPG 236.16.15.8 Mowing and Brush Hogging]], to be in line with the Endangered Species Act
+
4/11/19: This new Test Method is now available.
  
'''[[141.1 Cost Share Program|EPG 141.1 Cost Share Program]]'''
+
'''[[106.3.2.89 TM-89 Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)|EPG 106.3.2.89 TM-89, Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)]]'''
  
11/20/18: Guidance in EPG 141.1 Cost Share Program has been updated as approved by the Commission. The revisions will impact the program statewide.
+
4/10/18: This new Test Method is now available.  
  
'''[[236.4 Description Writing and Titles#Permanent Sidewalk Easement Clause|Permanent Sidewalk Easement Clause]]'''
+
'''[[236.13 Designing Right of Way Plans#236.13.13 Plan Submittal and Filing|EPG 236.13.13 Plan Submittal and Filing]]'''
  
11/19/18: In [[#236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions|EPG 236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions]], a permanent sidewalk easement clause is now available for districts' use.
+
4/5/19: Guidance now permits an Asst. District Engineer to approve Right of Way plans.
  
'''[[:Category:105 Control of Work#Among subjects to be discussed|EPG 105.9.12 Preconstruction Conference]]'''
+
'''[http://epg.modot.org/index.php/Category:101_Standard_Forms#Construction_and_Materials AC Index Price Adjustment]'''
  
11/15:18: Subjects to be discussed at this conference now include review of the process to request any DBE termination, substitution or addition.
+
3/27/19: The five AC Index Price Adjustment spreadsheets have been updated.
  
'''[[237.9 Submission of Plans and Supporting Documents#237.9.3.1 Schedule for Submittal|EPG 237.9.3.1 Schedule for Submittal]]'''
+
'''Steel Girder Galvanizing Procedure'''
  
11/7/18: Guidance has been added about a required e-mail for re-let or moved projects.
+
3/27/19: Guidance was added in [[751.50 Standard Detailing Notes#(A4a1.8.1) Place|EPG 751.50 Standard Detailing Notes for Nonweathering Steel Structures]] and [[751.14 Steel Superstructure #Galvanized nonweathering structural|EPG 751.14.5.8 Protective Coating Requirements]] to clarify steel girder galvanizing procedure.
  
'''[[:Category:604 Miscellaneous Drainage#Concrete Headwalls, Drop Inlets And Manholes (Sec 604.10)|EPG 604, Construction Requirements (Sec 604.10.3)]]'''
+
'''[[:Category:403 Asphaltic Concrete Pavement#Rice Test|Superpave Rice Testing Frequency]]'''
  
10/30/18: When approached with alternative products on a job as part of a change order or VE, this new guidance states that the RE should initially determine suitability and also consult the Field Office and New Products Coordinator to ensure value, uniformity and tracking.
+
3/21/19: Guidance about the frequency for rice dry-back testing when sample results are very consistent was corrected to one every fourth sublot.

Revision as of 09:02, 12 July 2019

EPG 2013b.jpg


Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


Our mission is to provide a world-class transportation system that is safe, innovative, reliable
and dedicated to a prosperous Missouri.


WELCOME
MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.

Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Maintenance, Planning, Right of Way and Traffic guidance.

RECENT POLICY CHANGES IN THE EPG

EPG 903.6.22 Low Clearance Sign

7/12/19: Guidance has been clarified and generally re-written.

EPG Storm Water Database Quick Reference Guides (QRGs)

7/11/19: The storm water QRGs have been updated and collected under their own heading in EPG 101 Standard Forms. New storm water QRGs have also been added.

EPG 141.2.11 Terms of Loans

7/10/19: Guidance has been updated to reflect the changes the MTFC board recently approved.

EPG 236.16.12.1 Digital Upgrade Request

6/25/19: Guidance has been expanded about how MoDOT personnel may handle upgrade requests.

Pretensioned Anchorage Zones

6/21/19: Terminology about the prestress force at transfer was clarified to better match AASHTO code.

EPG 127.13 Noise

6/21/19: Several updates including the clarification of screening methodology. Also clarified that all benefitted receptors are to be included in the benefit cost reasonableness calculation and noise abatement voting.

EPG 127.25.1.7 Disposal of Animal Carcasses

6/14/19: Updated guidance to match current practice, which has been coordinated with MO Dept. of Conservation.

EPG 750.7.3 Environmental Requirements

6/14/19: Expanded guidance, especially in the new EPG 750.7.3.1 Stream Classifications, clarified our process to meet the Corps' requirements for their "Regional Condition".

EPG 236.7.2.9 Negotiation Procedures and EPG 236.7.7.3 Taxpayer Identification Numbers

6/4/19: Guidance has been updated to reflect that the IRS Form W-9 is no longer needed.

Standard Detailing Note

5/31/19: The commentary for Note E2.26 was clarified. In the note itself, additional options were provided for piling minimum nominal axial compressive resistance.

EPG 130 Value Engineering

5/28/19: New guidance is now available for Post-Award Value Engineering (PAVE) workshops, processes and project selections.

Figs. 616.6.87.1 Rumble Strip Placement in Flagging and 616.6.87.2 Rumble Strip Placement on a Divided Highway

5/28/19: The spacing between the long-term rumble strips was increased to "10 to 12 feet" for a greater area of effectiveness.

Median Crossover on a Divided Highway, TA-39

5/28/19: In EPG 616.8 Typical Applications, TA-39 for Design and Construction was revised to require Directional Indicator Barricades for tapers. The concrete barrier has been removed on sheet 2. Instead of the concrete barrier, an approved, temporary and crashworthy device can be used.

Costs for Non-Contractual Items

5/21/19: The most recent costs for non-contractual items is now presented in EPG 237.6 Estimates.

Pile Design

5/17/19: Guidance for pile design procedure was clarified in several articles including EPG 702 Load-Bearing Piles, EPG 751.1.2.23 Types of Piling, EPG 751.3 Structural Steel Design Properties and EPG 751.36 Driven Piles.

EPG 237.14.2.9 Proposed 3D Top Surface Linear Features

5/10/19: This new guidance is for districts to be able to provide consultants with needed technical information.

EPG 236.3.5 Right of Way Expenditures and EPG 236.7.7 1099 Reporting of Acquisitions

4/30/19: Guidance has been updated to current practice.

EPG 236.16.18.1 Informal Hearing

4/24/19: The membership constituting the ODA Informal Hearing Review Committee was updated.

EPG 751.22.2.5 Deformations

4/22/19: Guidance was clarified, particularly in "calculation of camber (upward)","calculations of deflections (downward)" and "creep coefficient".

EPG 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators

4/11/19: This new Test Method is now available.

EPG 106.3.2.89 TM-89, Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)

4/10/18: This new Test Method is now available.

EPG 236.13.13 Plan Submittal and Filing

4/5/19: Guidance now permits an Asst. District Engineer to approve Right of Way plans.

AC Index Price Adjustment

3/27/19: The five AC Index Price Adjustment spreadsheets have been updated.

Steel Girder Galvanizing Procedure

3/27/19: Guidance was added in EPG 751.50 Standard Detailing Notes for Nonweathering Steel Structures and EPG 751.14.5.8 Protective Coating Requirements to clarify steel girder galvanizing procedure.

Superpave Rice Testing Frequency

3/21/19: Guidance about the frequency for rice dry-back testing when sample results are very consistent was corrected to one every fourth sublot.