Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 903.2.26)
m (New AWP MA Sample Record Acceptance By Certification QRG)
(23 intermediate revisions by the same user not shown)
Line 35: Line 35:
 
|-
 
|-
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
'''[[903.2 Extent of Signing#Fig. 903.2.26.1 Examples|Figs. 903.2.26.1 and 903.2.26.2]]'''
+
'''New QRG'''  
  
8/22/19: These figures, which provide examples of heights and lateral locations of signs for typical installations as well as locations for STOP and YIELD signs at intersections, have been updated to more strictly reflect MUTCD guidance.
+
11/14/19: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_Sample_Record_Acceptance_By_Certification.docx AWP MA Sample Record Acceptance By Certification] QRG is now available.  
  
'''[[903.10 General Service Signs#Standard. A qualified licensed|EPG 903.10.7 HOSPITAL Signs]]'''
+
'''[[:Category:105 Control of Work#The DWR shall be created|EPG 105.9.3 Daily Work Reports]]'''
  
8/13/19: Guidance about veterans’ hospital emergency rooms qualifying for hospital signing was clarified.
+
11/6/19: Guidance has been added for when Daily Work Reports in AASHTOWARE may be suspended.
  
'''[[:Category:107 Legal Relations and Responsibility to the Public#107.13 Insurance Requirements|EPG 107.13 Insurance Requirements]]'''
+
'''[[236.5 Property Management#236.5.28.3 Compensation for Changes in Access|EPG 236.5.28.3 Compensation for Changes in Access]] and [[236.6 Appraisal and Appraisal Review#After the appraiser has been made aware|EPG 236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals]]'''
  
8/13/19: Guidance about MoDOT insurance requirements for road and bridge contracts was expanded and brought into compliance with the latest statutes.
+
10/28/19: Guidance has been clarified to better reflect current practices.
  
'''[[:Category:108 Prosecution and Progress#108.7.1.1 Assessment of Liquidated Damages and Exceptions|EPG 108.7.1.1 Assessment of Liquidated Damages and Exceptions]]'''
+
'''AASHTOWare'''
  
8/9/19: Guidance has been rewritten for greater clarity and to remove archaic information. Also, a refresher course for the REs, ''[http://sp/sites/CM/FormServerTemplates/Liquidated_Damages_Guidance.pdf Guidance for Assessment of Liquidated Damages]'', is now presented.
+
10/25/19: Guidance in [[:Category:105 Control of Work#105.9 Authority and Duties of Resident Engineer (Sec 105.9)|EPG 105.9 Authority and Duties of Resident Engineer]] and [[:Category:105 Control of Work#105.9.3 Daily Work Reports|EPG 105.9.3 Daily Work Reports]] now allows for the expanded opportunities of the AWP.
  
'''[[:Category:123 Federal-Aid Highway Program#123.1.1 FHWA Oversight - National Highway System|EPG 123.1.1 FHWA Oversight - National Highway System]]'''
+
'''Drilled Shafts'''
  
8/9/19: Information for Projects of Division Interest (PoDI) has been updated for PY20.
+
10/23/19: Guidance in [[751.37 Drilled Shafts#751.37.1.6 Drilled Shaft General Detail Considerations|EPG 751.37.1.6 Drilled Shaft General Detail Considerations]] was expanded and clarified.
  
'''[[:Category:134 Engineering Professional Services#The PM/CA uploads a copy|Consultant Contract Administration]]'''
+
'''[[121.7 Program Estimates#The programming estimate must address|EPG 121.7 Program Estimates]]'''
  
7/31/19: Guidance for the invoicing process has been updated.
+
10/21/19: District estimate documentation requirements must address the total project cost and include estimated costs for, at a minimum, PE, CE, Construction, RW, Utilities, and Bridge.  Program estimate documentation and supporting documentation must be stored in e-Projects.
  
'''[[751.1 Preliminary Design#Required Pile Length|EPG 751.1.2.21 Substructure Type]]'''
+
'''Estimating Guidance Updates'''
  
7/31/19: Guidance pertaining to galvanizing requirements for scour area has been clarified.
+
10/21/19: Estimating guidance in [[104.7 Scoping Estimates|EPG 104.7 Scoping Estimates]] and [[121.7 Program Estimates|EPG 121.7 Program Estimates]] was updated with optional spreadsheets to assist the districts with their scoping and estimating processes.  The [[media:121.7 Project Scoping Form.xlsx|Project Scoping Form]] and [[media:104.7 Resurfacing.xlsx|Resurfacing Per Mile Scoping Form]] are now available.
  
'''[[236.8 Relocation Assistance Program|EPG 236.8 Relocation Assistance Program]]'''
+
'''[[media:616.8.10d MT.pdf|TA-10d, Lane Closure on Two-Lane Highways with Edgelines Using Portable Signal Flagging Device]] and [[media:616.8.10e MT.pdf|Lane Closure on Two-Lane Highways without Edgelines Using Portable Signal Flagging Device]]'''  
  
7/30/19: Guidance was updated to match the MAP-21 and federal guidelines.  
+
10/21/19: These TAs have been updated in [[616.8 Typical Applications (MUTCD 6H)#Listing of Typical Applications for Maintenance|EPG 616.8.1 Listing of Typical Applications for Maintenance]] to show that two Portable Signal Flagging Devices are always required.
  
'''[[media:616.8.10g MT 2019.pdf|Fig. 616.8.10g (TA-10g MT) Side Roads Entering Work Zones]]'''
+
'''[[:Category:618 Mobilization#Additional Mobilization for Seeding|Additional Mobilization for Seeding]]'''
  
7/25/19: Guidance in [[616.19 Quality Standards for Temporary Traffic Control Devices#Picture 10 shows|EPG 616.19.2.9.2 Flagging Operations]] and [[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a) (MUTCD 6F.58)|EPG 616.6.58 PILOT CAR FOLLOW ME and PILOT CAR IN USE WAIT & FOLLOW]] was updated along with Fig. 616.8.10g (TA-10g MT) Side Roads Entering Work Zones to present current pilot car signage usage.  
+
10/17/19: Guidance for all jobs that contain the Additional Mobilization for Seeding pay item is now available.
  
'''[[121.5 Asset Management#Major Bridges are funded|EPG 121.5.4 Funding Assets]]'''
+
'''[[:Category:505 Bridge Deck Concrete Wearing Surface#505.1.4 Polyester Polymer Concrete (PPC)|EPG 505.1.4 Polyester Polymer Concrete (PPC)]]'''
  
7/24/19: New guidance identifies what is eligible for Major Bridge Asset Management funds.  
+
10/2/19: New guidance is now available for Polyester Polymer Concrete Overlay.
  
'''[[:Category:941 Permits and Access Requests#941.4 Request to Perform Grading or Construct Geometric Improvements within Interstate Right of Way|EPG 941.4 Request to Perform Grading or Construct Geometric Improvements within Interstate Right of Way]]'''
+
'''[[:Category:109 Measurement and Payment#109.12.5 Change Order Time Extension for Extreme Events|EPG 109.12.5 Change Order Time Extension for Extreme Events]]'''
  
7/23/19: Policy was updated to match the current FHWA agreement and clarify the procedure.  
+
9/26/19: This new guidance describes the latitude the State Construction and Materials Engineer has to grant time extensions for extreme events.
  
'''[[606.1 Guardrail#606.1.3.2 End Terminals, Crash Cushions and Anchors|EPG 606.1.3.2 End Terminals, Crash Cushions and Anchors]]'''
+
'''[[136.3 Federal Aid Basics#136.3.8.4 Bridge Engineering Assistance Program (BEAP)|EPG 136.3.8.4 Bridge Engineering Assistance Program (BEAP)]]'''
  
7/22/19: Expanded guidance about end terminal grading for both new roadway construction and for existing roadbeds.
+
9/18/19: Guidance has been updated to conform with the new BEAP contract.
  
'''[[806.1 Erosion Control Measures#806.1.7.2 Construction Considerations|EPG 806.1.7.2 Construction Considerations]]'''
+
'''Abbreviations used by Design'''
  
7/22/19: Simplified guidance by removing guidance that was sufficiently covered in specifications.
+
9/5/19: [[media:237 Design Abbreviations.docx|Design Abbreviations]] are now presented in [[:Category:237 Contract Plans#Design Abbreviations|EPG 237 Contract Plans]].
  
'''[[LPA:136.3 Federal Aid Basics#136.3.8 Programs|EPG 136.3.8 Programs]]'''
+
'''Bridge Contract Plans'''
  
7/22/19: Deleted guidance for LPA programs that are no longer in use. Also, guidance was updated to accommodate revisions in the FAST Act.
+
9/4/19: The guidance in EPG 237.13.3 Bridge Contract Plans was moved to [[751.5 Structural Detailing Guidelines#751.5.1.4 Contract Plan File Name Convention|EPG 751.5.1.4 Contract Plan File Name Convention]]. The guidance in EPG 751.1.4 was re-titled and moved to [[751.5 Structural Detailing Guidelines#751.5.1.7 Contract Addendums and Construction Changes|EPG 751.5.1.7 Contract Addendums and Construction Changes]].  
  
'''[[751.1 Preliminary Design#Required Pile Length|EPG 751.1.2.21 Substructure Type]]'''
+
'''Estimate Policies'''
  
7/19/19: Guidance has been updated to refer 50-ft. lengths of galvanized pile.
+
8/30/19: Estimate guidance was clarified to reflect current practice.  Updated titles include [[103.1 Bid Opening and Award Process#103.1.8 Final Engineer's Estimate|EPG 103.1.8 Final Engineer's Estimate]], [[104.7 Scoping Estimates|EPG 104.7 Scoping Estimates]] and [[237.6 Project Estimates|EPG 237.6 Project Estimates]]. [[121.7 Program Estimates|EPG 121.7 Program Estimates]] is a new article compiled of clarified guidance from other articles.
  
'''[[903.6 Warning Signs#903.6.22 Low Clearance Sign (W12-2 and W12-2a) (MUTCD Section 2C.27)|EPG 903.6.22 Low Clearance Sign]]'''
+
'''[[127.9 Floodplain Management|EPG 127.9 Floodplain Management]] and [[748.8 Development in Floodplains|EPG 748.8 Development in Floodplains]]'''
  
7/12/19: Guidance has been clarified and generally re-written.
+
8/29/19: Guidance for determining the need for a Floodplain Development Permit was widely clarified. EPG 127.9 was re-titled "Floodplain Management" and EPG 748.8 re-titled "Development in Floodplains".
  
'''[[:Category:101 Standard Forms#Storm Water Database Quick Reference Guides (QRGs)|EPG Storm Water Database Quick Reference Guides (QRGs)]]
+
'''[[147.3 Job Order Contracting (JOC)#Final Change Order.|EPG 147.3.9 Change Order Approvals]]'''
  
7/11/19: The storm water QRGs have been updated and collected under their own heading in EPG 101 Standard Forms.  New storm water QRGs have also been added.
+
8/29/19: A sentence to be used that explains the reason for the final change order has been added to the guidance.
  
'''[http://epg.modot.org/index.php/141.2_Missouri_Transportation_Finance_Corporation_(MTFC)_Loans#141.2.11_Terms_of_Loans EPG 141.2.11 Terms of Loans]'''
+
'''[[:Category:134 Engineering Professional Services#134.5.3 Consultant Contract Close-Out|EPG 134.5.3 Consultant Contract Close-Out]]'''
  
7/10/19: Guidance has been updated to reflect the changes the MTFC board recently approved.
+
8/28/19: External Civil Rights has been added to the list of divisions that consultants must notify that the last invoice is the final invoice.
  
'''[[236.16 Outdoor Advertising#236.16.12.1 Digital Upgrade Request|EPG 236.16.12.1 Digital Upgrade Request]]'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a) (MUTCD 6F.58)|EPG 616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a)]]'''
  
6/25/19: Guidance has been expanded about how MoDOT personnel may handle upgrade requests.
+
8/27/19: Guidance has been provided for the two sizes of the GO20-4a sign.
  
'''[[751.22 P/S Concrete I Girders#Pretensioned anchorage zones|Pretensioned Anchorage Zones]]'''
+
'''[[media:616.8.38a DECM.pdf|TA-38a, Two Interior Lane Closure on a Freeway]]'''
  
6/21/19: Terminology about the prestress force at transfer was clarified to better match AASHTO code.
+
8/26/19: TA-38a is now available in the [[616.8 Typical Applications (MUTCD 6H)#Listing of Typical Applications for Design and Construction and Materials|Listing of Typical Applications for Design and Construction and Materials]].
  
'''[[127.13 Noise|EPG 127.13 Noise]]'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#The “Advance Warning Rail System” (AWRS)|EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs]]'''
  
6/21/19: Several updates including the clarification of [[127.13 Noise#Noise Screening Analysis Procedure|screening methodology]]. Also clarified that all benefitted receptors are to be included in the benefit cost reasonableness calculation and noise abatement voting.  
+
8/26/19: The ROAD CLOSED AHEAD (WO20-3) sign was identified as also requiring the installation of AWRS and flags in long-term situations for both road work and full closures.  
  
'''[[127.25 Maintenance Environmental Policies#127.25.1.7 Disposal of Animal Carcasses|EPG 127.25.1.7 Disposal of Animal Carcasses]]'''
+
'''[[903.2 Extent of Signing#Fig. 903.2.26.1 Examples|Figs. 903.2.26.1 and 903.2.26.2]]'''
  
6/14/19: Updated guidance to match current practice, which has been coordinated with MO Dept. of Conservation.
+
8/22/19: These figures, which provide examples of heights and lateral locations of signs for typical installations as well as locations for STOP and YIELD signs at intersections, have been updated to more strictly reflect MUTCD guidance.
  
'''[[750.7 Non-Hydraulic Considerations#750.7.3 Environmental Requirements|EPG 750.7.3 Environmental Requirements]]'''
+
'''[[903.10 General Service Signs#Standard. A qualified licensed|EPG 903.10.7 HOSPITAL Signs]]'''
  
6/14/19: Expanded guidance, especially in the new [[750.7 Non-Hydraulic Considerations#750.7.3.1 Stream Classifications|EPG 750.7.3.1 Stream Classifications]], clarified our process to meet the Corps' requirements for their "Regional Condition".  
+
8/13/19: Guidance about veterans’ hospital emergency rooms qualifying for hospital signing was clarified.
  
'''[[236.7 Negotiation#236.7.2.9 Negotiation Procedures|EPG 236.7.2.9 Negotiation Procedures]] and [[236.7 Negotiation#236.7.7.3 Taxpayer Identification Numbers|EPG 236.7.7.3 Taxpayer Identification Numbers]]'''
+
'''[[:Category:107 Legal Relations and Responsibility to the Public#107.13 Insurance Requirements|EPG 107.13 Insurance Requirements]]'''
  
6/4/19: Guidance has been updated to reflect that the IRS Form W-9 is no longer needed.
+
8/13/19: Guidance about MoDOT insurance requirements for road and bridge contracts was expanded and brought into compliance with the latest statutes.
  
'''[[751.50 Standard Detailing Notes#(E2.26)|Standard Detailing Note]]'''
+
'''[[:Category:108 Prosecution and Progress#108.7.1.1 Assessment of Liquidated Damages and Exceptions|EPG 108.7.1.1 Assessment of Liquidated Damages and Exceptions]]'''
  
5/31/19: The commentary for Note E2.26 was clarified.  In the note itself, additional options were provided for piling minimum nominal axial compressive resistance.
+
8/9/19: Guidance has been rewritten for greater clarity and to remove archaic information. Also, a refresher course for the REs, ''[http://sp/sites/CM/FormServerTemplates/Liquidated_Damages_Guidance.pdf Guidance for Assessment of Liquidated Damages]'', is now presented.

Revision as of 14:09, 14 November 2019

EPG 2013b.jpg


Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


Our mission is to provide a world-class transportation system that is safe, innovative, reliable
and dedicated to a prosperous Missouri.


WELCOME
MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.

Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.

RECENT POLICY CHANGES IN THE EPG

New QRG

11/14/19: The new AWP MA Sample Record Acceptance By Certification QRG is now available.

EPG 105.9.3 Daily Work Reports

11/6/19: Guidance has been added for when Daily Work Reports in AASHTOWARE may be suspended.

EPG 236.5.28.3 Compensation for Changes in Access and EPG 236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals

10/28/19: Guidance has been clarified to better reflect current practices.

AASHTOWare

10/25/19: Guidance in EPG 105.9 Authority and Duties of Resident Engineer and EPG 105.9.3 Daily Work Reports now allows for the expanded opportunities of the AWP.

Drilled Shafts

10/23/19: Guidance in EPG 751.37.1.6 Drilled Shaft General Detail Considerations was expanded and clarified.

EPG 121.7 Program Estimates

10/21/19: District estimate documentation requirements must address the total project cost and include estimated costs for, at a minimum, PE, CE, Construction, RW, Utilities, and Bridge. Program estimate documentation and supporting documentation must be stored in e-Projects.

Estimating Guidance Updates

10/21/19: Estimating guidance in EPG 104.7 Scoping Estimates and EPG 121.7 Program Estimates was updated with optional spreadsheets to assist the districts with their scoping and estimating processes. The Project Scoping Form and Resurfacing Per Mile Scoping Form are now available.

TA-10d, Lane Closure on Two-Lane Highways with Edgelines Using Portable Signal Flagging Device and Lane Closure on Two-Lane Highways without Edgelines Using Portable Signal Flagging Device

10/21/19: These TAs have been updated in EPG 616.8.1 Listing of Typical Applications for Maintenance to show that two Portable Signal Flagging Devices are always required.

Additional Mobilization for Seeding

10/17/19: Guidance for all jobs that contain the Additional Mobilization for Seeding pay item is now available.

EPG 505.1.4 Polyester Polymer Concrete (PPC)

10/2/19: New guidance is now available for Polyester Polymer Concrete Overlay.

EPG 109.12.5 Change Order Time Extension for Extreme Events

9/26/19: This new guidance describes the latitude the State Construction and Materials Engineer has to grant time extensions for extreme events.

EPG 136.3.8.4 Bridge Engineering Assistance Program (BEAP)

9/18/19: Guidance has been updated to conform with the new BEAP contract.

Abbreviations used by Design

9/5/19: Design Abbreviations are now presented in EPG 237 Contract Plans.

Bridge Contract Plans

9/4/19: The guidance in EPG 237.13.3 Bridge Contract Plans was moved to EPG 751.5.1.4 Contract Plan File Name Convention. The guidance in EPG 751.1.4 was re-titled and moved to EPG 751.5.1.7 Contract Addendums and Construction Changes.

Estimate Policies

8/30/19: Estimate guidance was clarified to reflect current practice. Updated titles include EPG 103.1.8 Final Engineer's Estimate, EPG 104.7 Scoping Estimates and EPG 237.6 Project Estimates. EPG 121.7 Program Estimates is a new article compiled of clarified guidance from other articles.

EPG 127.9 Floodplain Management and EPG 748.8 Development in Floodplains

8/29/19: Guidance for determining the need for a Floodplain Development Permit was widely clarified. EPG 127.9 was re-titled "Floodplain Management" and EPG 748.8 re-titled "Development in Floodplains".

EPG 147.3.9 Change Order Approvals

8/29/19: A sentence to be used that explains the reason for the final change order has been added to the guidance.

EPG 134.5.3 Consultant Contract Close-Out

8/28/19: External Civil Rights has been added to the list of divisions that consultants must notify that the last invoice is the final invoice.

EPG 616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a)

8/27/19: Guidance has been provided for the two sizes of the GO20-4a sign.

TA-38a, Two Interior Lane Closure on a Freeway

8/26/19: TA-38a is now available in the Listing of Typical Applications for Design and Construction and Materials.

EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs

8/26/19: The ROAD CLOSED AHEAD (WO20-3) sign was identified as also requiring the installation of AWRS and flags in long-term situations for both road work and full closures.

Figs. 903.2.26.1 and 903.2.26.2

8/22/19: These figures, which provide examples of heights and lateral locations of signs for typical installations as well as locations for STOP and YIELD signs at intersections, have been updated to more strictly reflect MUTCD guidance.

EPG 903.10.7 HOSPITAL Signs

8/13/19: Guidance about veterans’ hospital emergency rooms qualifying for hospital signing was clarified.

EPG 107.13 Insurance Requirements

8/13/19: Guidance about MoDOT insurance requirements for road and bridge contracts was expanded and brought into compliance with the latest statutes.

EPG 108.7.1.1 Assessment of Liquidated Damages and Exceptions

8/9/19: Guidance has been rewritten for greater clarity and to remove archaic information. Also, a refresher course for the REs, Guidance for Assessment of Liquidated Damages, is now presented.