Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 616.6.2.2)
m (New AWP MA Sample Record Acceptance By Certification QRG)
(22 intermediate revisions by the same user not shown)
Line 35: Line 35:
 
|-
 
|-
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#The “Advance Warning Rail System” (AWRS)|EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs]]'''
+
'''New QRG'''  
  
8/26/19: The ROAD CLOSED AHEAD (WO20-3) sign was identified as also requiring the installation of AWRS and flags in long-term situations for both road work and full closures.  
+
11/14/19: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_Sample_Record_Acceptance_By_Certification.docx AWP MA Sample Record Acceptance By Certification] QRG is now available.  
  
'''[[903.2 Extent of Signing#Fig. 903.2.26.1 Examples|Figs. 903.2.26.1 and 903.2.26.2]]'''
+
'''[[:Category:105 Control of Work#The DWR shall be created|EPG 105.9.3 Daily Work Reports]]'''
  
8/22/19: These figures, which provide examples of heights and lateral locations of signs for typical installations as well as locations for STOP and YIELD signs at intersections, have been updated to more strictly reflect MUTCD guidance.
+
11/6/19: Guidance has been added for when Daily Work Reports in AASHTOWARE may be suspended.
  
'''[[903.10 General Service Signs#Standard. A qualified licensed|EPG 903.10.7 HOSPITAL Signs]]'''
+
'''[[236.5 Property Management#236.5.28.3 Compensation for Changes in Access|EPG 236.5.28.3 Compensation for Changes in Access]] and [[236.6 Appraisal and Appraisal Review#After the appraiser has been made aware|EPG 236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals]]'''
  
8/13/19: Guidance about veterans’ hospital emergency rooms qualifying for hospital signing was clarified.
+
10/28/19: Guidance has been clarified to better reflect current practices.
  
'''[[:Category:107 Legal Relations and Responsibility to the Public#107.13 Insurance Requirements|EPG 107.13 Insurance Requirements]]'''
+
'''AASHTOWare'''
  
8/13/19: Guidance about MoDOT insurance requirements for road and bridge contracts was expanded and brought into compliance with the latest statutes.
+
10/25/19: Guidance in [[:Category:105 Control of Work#105.9 Authority and Duties of Resident Engineer (Sec 105.9)|EPG 105.9 Authority and Duties of Resident Engineer]] and [[:Category:105 Control of Work#105.9.3 Daily Work Reports|EPG 105.9.3 Daily Work Reports]] now allows for the expanded opportunities of the AWP.
  
'''[[:Category:108 Prosecution and Progress#108.7.1.1 Assessment of Liquidated Damages and Exceptions|EPG 108.7.1.1 Assessment of Liquidated Damages and Exceptions]]'''
+
'''Drilled Shafts'''
  
8/9/19: Guidance has been rewritten for greater clarity and to remove archaic information. Also, a refresher course for the REs, ''[http://sp/sites/CM/FormServerTemplates/Liquidated_Damages_Guidance.pdf Guidance for Assessment of Liquidated Damages]'', is now presented.
+
10/23/19: Guidance in [[751.37 Drilled Shafts#751.37.1.6 Drilled Shaft General Detail Considerations|EPG 751.37.1.6 Drilled Shaft General Detail Considerations]] was expanded and clarified.
  
'''[[:Category:123 Federal-Aid Highway Program#123.1.1 FHWA Oversight - National Highway System|EPG 123.1.1 FHWA Oversight - National Highway System]]'''
+
'''[[121.7 Program Estimates#The programming estimate must address|EPG 121.7 Program Estimates]]'''
  
8/9/19: Information for Projects of Division Interest (PoDI) has been updated for PY20.
+
10/21/19: District estimate documentation requirements must address the total project cost and include estimated costs for, at a minimum, PE, CE, Construction, RW, Utilities, and Bridge.  Program estimate documentation and supporting documentation must be stored in e-Projects.
  
'''[[:Category:134 Engineering Professional Services#The PM/CA uploads a copy|Consultant Contract Administration]]'''
+
'''Estimating Guidance Updates'''
  
7/31/19: Guidance for the invoicing process has been updated.
+
10/21/19: Estimating guidance in [[104.7 Scoping Estimates|EPG 104.7 Scoping Estimates]] and [[121.7 Program Estimates|EPG 121.7 Program Estimates]] was updated with optional spreadsheets to assist the districts with their scoping and estimating processes.  The [[media:121.7 Project Scoping Form.xlsx|Project Scoping Form]] and [[media:104.7 Resurfacing.xlsx|Resurfacing Per Mile Scoping Form]] are now available.
  
'''[[751.1 Preliminary Design#Required Pile Length|EPG 751.1.2.21 Substructure Type]]'''
+
'''[[media:616.8.10d MT.pdf|TA-10d, Lane Closure on Two-Lane Highways with Edgelines Using Portable Signal Flagging Device]] and [[media:616.8.10e MT.pdf|Lane Closure on Two-Lane Highways without Edgelines Using Portable Signal Flagging Device]]'''  
  
7/31/19: Guidance pertaining to galvanizing requirements for scour area has been clarified.
+
10/21/19: These TAs have been updated in [[616.8 Typical Applications (MUTCD 6H)#Listing of Typical Applications for Maintenance|EPG 616.8.1 Listing of Typical Applications for Maintenance]] to show that two Portable Signal Flagging Devices are always required.
  
'''[[236.8 Relocation Assistance Program|EPG 236.8 Relocation Assistance Program]]'''
+
'''[[:Category:618 Mobilization#Additional Mobilization for Seeding|Additional Mobilization for Seeding]]'''
  
7/30/19: Guidance was updated to match the MAP-21 and federal guidelines.  
+
10/17/19: Guidance for all jobs that contain the Additional Mobilization for Seeding pay item is now available.
  
'''[[media:616.8.10g MT 2019.pdf|Fig. 616.8.10g (TA-10g MT) Side Roads Entering Work Zones]]'''
+
'''[[:Category:505 Bridge Deck Concrete Wearing Surface#505.1.4 Polyester Polymer Concrete (PPC)|EPG 505.1.4 Polyester Polymer Concrete (PPC)]]'''
  
7/25/19: Guidance in [[616.19 Quality Standards for Temporary Traffic Control Devices#Picture 10 shows|EPG 616.19.2.9.2 Flagging Operations]] and [[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a) (MUTCD 6F.58)|EPG 616.6.58 PILOT CAR FOLLOW ME and PILOT CAR IN USE WAIT & FOLLOW]] was updated along with Fig. 616.8.10g (TA-10g MT) Side Roads Entering Work Zones to present current pilot car signage usage.  
+
10/2/19: New guidance is now available for Polyester Polymer Concrete Overlay.
  
'''[[121.5 Asset Management#Major Bridges are funded|EPG 121.5.4 Funding Assets]]'''
+
'''[[:Category:109 Measurement and Payment#109.12.5 Change Order Time Extension for Extreme Events|EPG 109.12.5 Change Order Time Extension for Extreme Events]]'''
  
7/24/19: New guidance identifies what is eligible for Major Bridge Asset Management funds.  
+
9/26/19: This new guidance describes the latitude the State Construction and Materials Engineer has to grant time extensions for extreme events.
  
'''[[:Category:941 Permits and Access Requests#941.4 Request to Perform Grading or Construct Geometric Improvements within Interstate Right of Way|EPG 941.4 Request to Perform Grading or Construct Geometric Improvements within Interstate Right of Way]]'''
+
'''[[136.3 Federal Aid Basics#136.3.8.4 Bridge Engineering Assistance Program (BEAP)|EPG 136.3.8.4 Bridge Engineering Assistance Program (BEAP)]]'''
  
7/23/19: Policy was updated to match the current FHWA agreement and clarify the procedure.  
+
9/18/19: Guidance has been updated to conform with the new BEAP contract.
  
'''[[606.1 Guardrail#606.1.3.2 End Terminals, Crash Cushions and Anchors|EPG 606.1.3.2 End Terminals, Crash Cushions and Anchors]]'''
+
'''Abbreviations used by Design'''
  
7/22/19: Expanded guidance about end terminal grading for both new roadway construction and for existing roadbeds.
+
9/5/19: [[media:237 Design Abbreviations.docx|Design Abbreviations]] are now presented in [[:Category:237 Contract Plans#Design Abbreviations|EPG 237 Contract Plans]].
  
'''[[806.1 Erosion Control Measures#806.1.7.2 Construction Considerations|EPG 806.1.7.2 Construction Considerations]]'''
+
'''Bridge Contract Plans'''
  
7/22/19: Simplified guidance by removing guidance that was sufficiently covered in specifications.
+
9/4/19: The guidance in EPG 237.13.3 Bridge Contract Plans was moved to [[751.5 Structural Detailing Guidelines#751.5.1.4 Contract Plan File Name Convention|EPG 751.5.1.4 Contract Plan File Name Convention]]. The guidance in EPG 751.1.4 was re-titled and moved to [[751.5 Structural Detailing Guidelines#751.5.1.7 Contract Addendums and Construction Changes|EPG 751.5.1.7 Contract Addendums and Construction Changes]].  
  
'''[[LPA:136.3 Federal Aid Basics#136.3.8 Programs|EPG 136.3.8 Programs]]'''
+
'''Estimate Policies'''
  
7/22/19: Deleted guidance for LPA programs that are no longer in useAlso, guidance was updated to accommodate revisions in the FAST Act.
+
8/30/19: Estimate guidance was clarified to reflect current practiceUpdated titles include [[103.1 Bid Opening and Award Process#103.1.8 Final Engineer's Estimate|EPG 103.1.8 Final Engineer's Estimate]], [[104.7 Scoping Estimates|EPG 104.7 Scoping Estimates]] and [[237.6 Project Estimates|EPG 237.6 Project Estimates]]. [[121.7 Program Estimates|EPG 121.7 Program Estimates]] is a new article compiled of clarified guidance from other articles.
  
'''[[751.1 Preliminary Design#Required Pile Length|EPG 751.1.2.21 Substructure Type]]'''
+
'''[[127.9 Floodplain Management|EPG 127.9 Floodplain Management]] and [[748.8 Development in Floodplains|EPG 748.8 Development in Floodplains]]'''
  
7/19/19: Guidance has been updated to refer 50-ft. lengths of galvanized pile.
+
8/29/19: Guidance for determining the need for a Floodplain Development Permit was widely clarified. EPG 127.9 was re-titled "Floodplain Management" and EPG 748.8 re-titled "Development in Floodplains".
  
'''[[903.6 Warning Signs#903.6.22 Low Clearance Sign (W12-2 and W12-2a) (MUTCD Section 2C.27)|EPG 903.6.22 Low Clearance Sign]]'''
+
'''[[147.3 Job Order Contracting (JOC)#Final Change Order.|EPG 147.3.9 Change Order Approvals]]'''
  
7/12/19: Guidance has been clarified and generally re-written.
+
8/29/19: A sentence to be used that explains the reason for the final change order has been added to the guidance.
  
'''[[:Category:101 Standard Forms#Storm Water Database Quick Reference Guides (QRGs)|EPG Storm Water Database Quick Reference Guides (QRGs)]]
+
'''[[:Category:134 Engineering Professional Services#134.5.3 Consultant Contract Close-Out|EPG 134.5.3 Consultant Contract Close-Out]]'''
  
7/11/19: The storm water QRGs have been updated and collected under their own heading in EPG 101 Standard Forms.  New storm water QRGs have also been added.
+
8/28/19: External Civil Rights has been added to the list of divisions that consultants must notify that the last invoice is the final invoice.
  
'''[http://epg.modot.org/index.php/141.2_Missouri_Transportation_Finance_Corporation_(MTFC)_Loans#141.2.11_Terms_of_Loans EPG 141.2.11 Terms of Loans]'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a) (MUTCD 6F.58)|EPG 616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a)]]'''
  
7/10/19: Guidance has been updated to reflect the changes the MTFC board recently approved.
+
8/27/19: Guidance has been provided for the two sizes of the GO20-4a sign.
  
'''[[236.16 Outdoor Advertising#236.16.12.1 Digital Upgrade Request|EPG 236.16.12.1 Digital Upgrade Request]]'''
+
'''[[media:616.8.38a DECM.pdf|TA-38a, Two Interior Lane Closure on a Freeway]]'''
  
6/25/19: Guidance has been expanded about how MoDOT personnel may handle upgrade requests.
+
8/26/19: TA-38a is now available in the [[616.8 Typical Applications (MUTCD 6H)#Listing of Typical Applications for Design and Construction and Materials|Listing of Typical Applications for Design and Construction and Materials]].
  
'''[[751.22 P/S Concrete I Girders#Pretensioned anchorage zones|Pretensioned Anchorage Zones]]'''
+
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#The “Advance Warning Rail System” (AWRS)|EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs]]'''
  
6/21/19: Terminology about the prestress force at transfer was clarified to better match AASHTO code.
+
8/26/19: The ROAD CLOSED AHEAD (WO20-3) sign was identified as also requiring the installation of AWRS and flags in long-term situations for both road work and full closures.  
  
'''[[127.13 Noise|EPG 127.13 Noise]]'''
+
'''[[903.2 Extent of Signing#Fig. 903.2.26.1 Examples|Figs. 903.2.26.1 and 903.2.26.2]]'''
  
6/21/19: Several updates including the clarification of [[127.13 Noise#Noise Screening Analysis Procedure|screening methodology]]. Also clarified that all benefitted receptors are to be included in the benefit cost reasonableness calculation and noise abatement voting.  
+
8/22/19: These figures, which provide examples of heights and lateral locations of signs for typical installations as well as locations for STOP and YIELD signs at intersections, have been updated to more strictly reflect MUTCD guidance.
  
'''[[127.25 Maintenance Environmental Policies#127.25.1.7 Disposal of Animal Carcasses|EPG 127.25.1.7 Disposal of Animal Carcasses]]'''
+
'''[[903.10 General Service Signs#Standard. A qualified licensed|EPG 903.10.7 HOSPITAL Signs]]'''
  
6/14/19: Updated guidance to match current practice, which has been coordinated with MO Dept. of Conservation.
+
8/13/19: Guidance about veterans’ hospital emergency rooms qualifying for hospital signing was clarified.
  
'''[[750.7 Non-Hydraulic Considerations#750.7.3 Environmental Requirements|EPG 750.7.3 Environmental Requirements]]'''
+
'''[[:Category:107 Legal Relations and Responsibility to the Public#107.13 Insurance Requirements|EPG 107.13 Insurance Requirements]]'''
  
6/14/19: Expanded guidance, especially in the new [[750.7 Non-Hydraulic Considerations#750.7.3.1 Stream Classifications|EPG 750.7.3.1 Stream Classifications]], clarified our process to meet the Corps' requirements for their "Regional Condition".  
+
8/13/19: Guidance about MoDOT insurance requirements for road and bridge contracts was expanded and brought into compliance with the latest statutes.
  
'''[[236.7 Negotiation#236.7.2.9 Negotiation Procedures|EPG 236.7.2.9 Negotiation Procedures]] and [[236.7 Negotiation#236.7.7.3 Taxpayer Identification Numbers|EPG 236.7.7.3 Taxpayer Identification Numbers]]'''
+
'''[[:Category:108 Prosecution and Progress#108.7.1.1 Assessment of Liquidated Damages and Exceptions|EPG 108.7.1.1 Assessment of Liquidated Damages and Exceptions]]'''
  
6/4/19: Guidance has been updated to reflect that the IRS Form W-9 is no longer needed.
+
8/9/19: Guidance has been rewritten for greater clarity and to remove archaic information. Also, a refresher course for the REs, ''[http://sp/sites/CM/FormServerTemplates/Liquidated_Damages_Guidance.pdf Guidance for Assessment of Liquidated Damages]'', is now presented.

Revision as of 14:09, 14 November 2019

EPG 2013b.jpg


Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


Our mission is to provide a world-class transportation system that is safe, innovative, reliable
and dedicated to a prosperous Missouri.


WELCOME
MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.

Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.

RECENT POLICY CHANGES IN THE EPG

New QRG

11/14/19: The new AWP MA Sample Record Acceptance By Certification QRG is now available.

EPG 105.9.3 Daily Work Reports

11/6/19: Guidance has been added for when Daily Work Reports in AASHTOWARE may be suspended.

EPG 236.5.28.3 Compensation for Changes in Access and EPG 236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals

10/28/19: Guidance has been clarified to better reflect current practices.

AASHTOWare

10/25/19: Guidance in EPG 105.9 Authority and Duties of Resident Engineer and EPG 105.9.3 Daily Work Reports now allows for the expanded opportunities of the AWP.

Drilled Shafts

10/23/19: Guidance in EPG 751.37.1.6 Drilled Shaft General Detail Considerations was expanded and clarified.

EPG 121.7 Program Estimates

10/21/19: District estimate documentation requirements must address the total project cost and include estimated costs for, at a minimum, PE, CE, Construction, RW, Utilities, and Bridge. Program estimate documentation and supporting documentation must be stored in e-Projects.

Estimating Guidance Updates

10/21/19: Estimating guidance in EPG 104.7 Scoping Estimates and EPG 121.7 Program Estimates was updated with optional spreadsheets to assist the districts with their scoping and estimating processes. The Project Scoping Form and Resurfacing Per Mile Scoping Form are now available.

TA-10d, Lane Closure on Two-Lane Highways with Edgelines Using Portable Signal Flagging Device and Lane Closure on Two-Lane Highways without Edgelines Using Portable Signal Flagging Device

10/21/19: These TAs have been updated in EPG 616.8.1 Listing of Typical Applications for Maintenance to show that two Portable Signal Flagging Devices are always required.

Additional Mobilization for Seeding

10/17/19: Guidance for all jobs that contain the Additional Mobilization for Seeding pay item is now available.

EPG 505.1.4 Polyester Polymer Concrete (PPC)

10/2/19: New guidance is now available for Polyester Polymer Concrete Overlay.

EPG 109.12.5 Change Order Time Extension for Extreme Events

9/26/19: This new guidance describes the latitude the State Construction and Materials Engineer has to grant time extensions for extreme events.

EPG 136.3.8.4 Bridge Engineering Assistance Program (BEAP)

9/18/19: Guidance has been updated to conform with the new BEAP contract.

Abbreviations used by Design

9/5/19: Design Abbreviations are now presented in EPG 237 Contract Plans.

Bridge Contract Plans

9/4/19: The guidance in EPG 237.13.3 Bridge Contract Plans was moved to EPG 751.5.1.4 Contract Plan File Name Convention. The guidance in EPG 751.1.4 was re-titled and moved to EPG 751.5.1.7 Contract Addendums and Construction Changes.

Estimate Policies

8/30/19: Estimate guidance was clarified to reflect current practice. Updated titles include EPG 103.1.8 Final Engineer's Estimate, EPG 104.7 Scoping Estimates and EPG 237.6 Project Estimates. EPG 121.7 Program Estimates is a new article compiled of clarified guidance from other articles.

EPG 127.9 Floodplain Management and EPG 748.8 Development in Floodplains

8/29/19: Guidance for determining the need for a Floodplain Development Permit was widely clarified. EPG 127.9 was re-titled "Floodplain Management" and EPG 748.8 re-titled "Development in Floodplains".

EPG 147.3.9 Change Order Approvals

8/29/19: A sentence to be used that explains the reason for the final change order has been added to the guidance.

EPG 134.5.3 Consultant Contract Close-Out

8/28/19: External Civil Rights has been added to the list of divisions that consultants must notify that the last invoice is the final invoice.

EPG 616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a)

8/27/19: Guidance has been provided for the two sizes of the GO20-4a sign.

TA-38a, Two Interior Lane Closure on a Freeway

8/26/19: TA-38a is now available in the Listing of Typical Applications for Design and Construction and Materials.

EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs

8/26/19: The ROAD CLOSED AHEAD (WO20-3) sign was identified as also requiring the installation of AWRS and flags in long-term situations for both road work and full closures.

Figs. 903.2.26.1 and 903.2.26.2

8/22/19: These figures, which provide examples of heights and lateral locations of signs for typical installations as well as locations for STOP and YIELD signs at intersections, have been updated to more strictly reflect MUTCD guidance.

EPG 903.10.7 HOSPITAL Signs

8/13/19: Guidance about veterans’ hospital emergency rooms qualifying for hospital signing was clarified.

EPG 107.13 Insurance Requirements

8/13/19: Guidance about MoDOT insurance requirements for road and bridge contracts was expanded and brought into compliance with the latest statutes.

EPG 108.7.1.1 Assessment of Liquidated Damages and Exceptions

8/9/19: Guidance has been rewritten for greater clarity and to remove archaic information. Also, a refresher course for the REs, Guidance for Assessment of Liquidated Damages, is now presented.