Revision history of "Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing (FAST)"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 12:54, 12 June 2015Smithk (Talk | contribs)m . . (6,693 bytes) (+1,779). . (Per LPA and AM, updated to current practice)
  • (cur | prev) 11:56, 1 April 2014Smithk (Talk | contribs)m . . (4,914 bytes) (+59). . (Per CM and LPA, slightly revised the concrete testing frequencies for PCC Pavement to permit more frequent testing for smaller projects. Also slightly expanded the description of Concrete Masonry.)
  • (cur | prev) 07:22, 22 April 2010Smithk (Talk | contribs)m . . (4,855 bytes) (+4,855). . (Per Physical Laboratory, this re-titled older information has been brought back into the EPG. Was once known as the LPA's "Fig 11-10")