User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:16, 15 February 2017 diff hist -199 751.8 LRFD Concrete Box Culverts →751.8.1.1 Material Properties: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:11, 15 February 2017 diff hist +2,007 751.5 Structural Detailing Guidelines →751.5.9.2 Reinforcing Steel: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 11:49, 15 February 2017 diff hist -64 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8.3.1 Preventive Maintenance
- 11:47, 15 February 2017 diff hist +1,079 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8.3 Signal Maintenance: Per TS, updated signal related preventive maintenance & inspection processes.
- 11:29, 15 February 2017 diff hist -1,459 902.4 Signal Installations and Equipment Per TS, updated signal related preventive maintenance & inspection processes. Cycle of controller & cabinet replacement lengthened from 15 years to 20; LED signal indications replacement extended
- 11:11, 15 February 2017 diff hist 0 N File:127.29.8 map 2017.jpg current
- 11:11, 15 February 2017 diff hist +4,039 127.29 Stormwater Per Env'l, new permit language and corresponding requirements. Also adds to the public involvement process as required to allow input on new permits.
- 10:59, 15 February 2017 diff hist +15 m 127.25 Maintenance Environmental Policies updated link
- 10:44, 15 February 2017 diff hist +733 Category:129 Public Involvement Per Env'l, new public involvement process as required to allow input on new stormwater permits.
- 10:21, 15 February 2017 diff hist 0 N File:616.6.51.3.jpg current
- 10:21, 15 February 2017 diff hist +1,098 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Project Signs: Per TS, implement Work Zone No Phone Zone Signs
- 09:35, 14 February 2017 diff hist +518 m Category:134 Engineering Professional Services updated links
- 16:04, 10 February 2017 diff hist -2 m Main Page
- 11:39, 10 February 2017 diff hist +25 m Main Page EPG 751.10.4
- 11:36, 10 February 2017 diff hist +332 m 751.50 Standard Detailing Notes →H4. Conduit System: Per BR, added H4.11 and H4.12 (renumbereing previous H4.11 as H4.13) to clarify deflection fitting and expansion fitting requirements.
- 11:27, 10 February 2017 diff hist 0 m 751.10 General Superstructure →751.10.4 Conduit Systems
- 11:22, 10 February 2017 diff hist 0 N File:751.10.4 Multiple Conduits.jpg current
- 11:22, 10 February 2017 diff hist 0 N File:751.10.4 Section through Safety Barrier Curb 2017.jpg current
- 11:21, 10 February 2017 diff hist 0 N File:751.10.4 Safety Barrier Curb over Slab 2017.jpg current
- 11:20, 10 February 2017 diff hist 0 N File:751.10.4 Junction Box in Safety Barrier Section BB.jpg current
- 11:20, 10 February 2017 diff hist 0 N File:751.10.4 Junction Box in Safety Barrier 2017.jpg current
- 11:19, 10 February 2017 diff hist 0 N File:751.10.4 Junction Box in Wing Section 2017.jpg current
- 11:19, 10 February 2017 diff hist 0 N File:751.10.4 Junction Box in Wing 2017.jpg current
- 11:18, 10 February 2017 diff hist 0 N File:751.10.4 Safety Barrier Curb Detail B.jpg current
- 11:18, 10 February 2017 diff hist 0 N File:751.10.4 Safety Barrier Curb Detail A.jpg current
- 11:17, 10 February 2017 diff hist 0 N File:751.10.4 Safety Barrier Curb 2017.jpg current
- 11:16, 10 February 2017 diff hist 0 N File:751.10.4 Junction Box.jpg current
- 11:16, 10 February 2017 diff hist 0 m 751.10 General Superstructure →751.10.4 Conduit Systems
- 11:14, 10 February 2017 diff hist 0 N File:751.10.4 Part Section Suspended Conduit Detail A.jpg current
- 11:13, 10 February 2017 diff hist 0 N File:751.10.4 Part Section Suspended Conduit.jpg current
- 11:12, 10 February 2017 diff hist 0 N File:751.10.4 Multiple Conduits in Deepened Slab 2017.jpg current
- 11:12, 10 February 2017 diff hist 0 N File:751.10.4 Multiple Conduits in Safety Barrier 2017.jpg current
- 11:10, 10 February 2017 diff hist 0 N File:751.10.4 Single Conduit in safety barrier curb.jpg current
- 11:10, 10 February 2017 diff hist 0 N File:751.10.4 Single Conduit in slab.jpg current
- 11:09, 10 February 2017 diff hist +3,377 m 751.10 General Superstructure →751.10.4 Conduit Systems: Per BR, clarified deflection fitting and expansion fitting requirements. Updated figures.
- 15:21, 9 February 2017 diff hist -440 m Main Page EPG 751.40.2.3
- 13:52, 9 February 2017 diff hist -1 m 751.40 LFD Widening and Repair →751.40.2.3.1 Formed and Unformed Repair Areas
- 13:49, 9 February 2017 diff hist 0 N File:751.40.2.3.1.2.jpg current
- 13:47, 9 February 2017 diff hist 0 N File:751.40.2.3.1.1.jpg current
- 13:47, 9 February 2017 diff hist +148 m 751.40 LFD Widening and Repair →751.40.2.3 Substructure Repair: Per BR, clarified formed and unformed repair areas
- 15:18, 8 February 2017 diff hist +82 m Category:134 Engineering Professional Services updated link to SharePoint
- 09:41, 8 February 2017 diff hist +123 m Category:134 Engineering Professional Services
- 09:30, 8 February 2017 diff hist -19 m Category:101 Standard Forms →Design Forms: updated links to SharePoint
- 09:27, 8 February 2017 diff hist +374 m Category:134 Engineering Professional Services updated links to SharePoint
- 14:43, 7 February 2017 diff hist 0 N File:Main Page 2 February 7, 2017.jpg current
- 14:42, 7 February 2017 diff hist 0 N File:Main Page February 7, 2017.jpg current
- 14:41, 7 February 2017 diff hist +638 m Main Page
- 09:08, 7 February 2017 diff hist +156 751.50 Standard Detailing Notes →G3. Vertical Drain at End Bent: Per BR, increased the drainage behind end bents to improve performance and reduce future maintenance.
- 14:33, 6 February 2017 diff hist -14 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Three-Strand Guard Cable Material →1040.2 Procedure: Per CM, updated links
- 13:41, 6 February 2017 diff hist 0 m Main Page 40,000,000 hits, as of 2/3/17