User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:13, 27 February 2017 diff hist +517 m Category talk:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches current
- 14:55, 24 February 2017 diff hist -121 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51 Project Signs: Per TS, further clarification to the revision from earlier this month
- 14:37, 24 February 2017 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.1 Types of Devices (MUTCD 6F.01)
- 14:05, 23 February 2017 diff hist -121 m Main Page EPG 821
- 13:40, 23 February 2017 diff hist 0 N File:821.25 krenite.jpg current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Vastlan General Information.doc current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Perspective General Information 2017.docx current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Plateau General Information 2017.doc current
- 13:39, 23 February 2017 diff hist 0 N File:821.25 Outrider General Information 2017.doc current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Milestone General Information 2017.docx current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Method.docx current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Krenite S General Information 2017.doc current
- 13:38, 23 February 2017 diff hist 0 N File:821.25 Escort XP General Information 2017.doc current
- 13:37, 23 February 2017 diff hist 0 N File:821.25 2,4-D General Information 2017.doc current
- 13:37, 23 February 2017 diff hist 0 N File:821.25 Total Vegetative Control Custom Mix.doc current
- 13:37, 23 February 2017 diff hist 0 N File:821.25 Basal Bark General Information 2017.doc current
- 13:36, 23 February 2017 diff hist 0 N File:821.25 Aquatic Glyphosate General Information 2017.doc current
- 13:36, 23 February 2017 diff hist +918 m 821.25 Products Per MT, new products with the new 2017 bid have replaced old products current
- 13:23, 23 February 2017 diff hist -196 m 821.23 Additives and Adjuvants Per MT, new products with the new 2017 bid have replaced old products current
- 11:36, 23 February 2017 diff hist -1 m 821.22 Weed Control in Landscaped Areas current
- 11:36, 23 February 2017 diff hist -709 m 821.22 Weed Control in Landscaped Areas Per MT, new products with the new 2017 bid have replaced old products
- 11:21, 23 February 2017 diff hist +57 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Logo Signs) on Construction Projects: Per TS and CM, updated LOGO tel number contact
- 10:43, 23 February 2017 diff hist +23 m 821.20 Woody Plant Control Per MT, new products with the new 2017 bid have replaced old products current
- 10:39, 23 February 2017 diff hist -11 m 821.19 Problem Weeds Per MT, new products with the new 2017 bid have replaced old products current
- 10:25, 23 February 2017 diff hist +452 m 821.18 Noxious Weeds Per MT, new products with the new 2017 bid have replaced old products
- 10:17, 23 February 2017 diff hist +253 m 821.17 Plant Growth Regulators (PGRs) Per MT, new products with the new 2017 bid have replaced old products current
- 10:06, 23 February 2017 diff hist -570 m 821.16 Total Vegetation Control Treatment Per MT, new products with the new 2017 bid have replaced old products current
- 09:48, 23 February 2017 diff hist -125 m 821.14 Herbicide Spills Incident Reporting →Table 821.14.1: Per MT, new products with the new 2017 bid have replaced old products current
- 09:46, 23 February 2017 diff hist +8 m 821.12 Mixing and Handling Guidelines Per MT, new products with the new 2017 bid have replaced old products current
- 09:45, 23 February 2017 diff hist -79 m 821.11 Calibration Per MT, new products with the new 2017 bid have replaced old products current
- 09:30, 23 February 2017 diff hist -1 m 821.10 Equipment and Application Methods Per MT, new products with the new 2017 bid have replaced old products current
- 09:30, 23 February 2017 diff hist +57 m 821.9 Labels and Safety Data Sheets (SDS) Per MT, new products with the new 2017 bid have replaced old products
- 09:27, 23 February 2017 diff hist 0 m 821.9 Labels and Safety Data Sheets (SDS) 821.9 Labels and Material Safety Data Sheets (MSDS) moved to 821.9 Labels and Safety Data Sheets (SDS): MSDS is now SDS...no more "Material"
- 09:27, 23 February 2017 diff hist +55 N 821.9 Labels and Material Safety Data Sheets (MSDS) 821.9 Labels and Material Safety Data Sheets (MSDS) moved to 821.9 Labels and Safety Data Sheets (SDS): MSDS is now SDS...no more "Material" current
- 09:26, 23 February 2017 diff hist -1 m 821.6 Inventory Control and Storage Per MT, new products with the new 2017 bid have replaced old products current
- 09:25, 23 February 2017 diff hist -1 m 821.5 Storage Facilities Per MT, new products with the new 2017 bid have replaced old products current
- 09:24, 23 February 2017 diff hist +163 m 821.4 Pesticides and the Environment Per MT, new products with the new 2017 bid have replaced old products current
- 09:22, 23 February 2017 diff hist +19 m 821.2 Safety Per MT, new products with the new 2017 bid have replaced old products current
- 09:19, 23 February 2017 diff hist -76 m Category:821 Herbicides and Roadsides Per MT, new products with the new 2017 bid have replaced old products
- 10:33, 22 February 2017 diff hist 0 m Where to Find Construction and Materials Functions current
- 10:29, 22 February 2017 diff hist -277 m Category:610 Masonry Construction Laboratory Testing Guidelines EPG 610 Masonry Construction Lab Testing Guidelines was virtually unchanged from its original Aug 2007 form. It had about 7385 hits. current
- 10:22, 22 February 2017 diff hist +93 m Category:600 INCIDENTAL CONSTRUCTION Per DE, moved EPG 610 to EPG 647. Now that there is a Sec 610, moved this info to make room for potential EPG info related to the new Sec 610.
- 10:21, 22 February 2017 diff hist +860 Nm Category:647 Masonry Construction Laboratory Testing Guidelines Per DE, moved EPG 610 to EPG 647. Now that there is a Sec 610, moved this info to make room for potential EPG info related to the new Sec 610.
- 16:09, 21 February 2017 diff hist -310 m Main Page EPG 104.7
- 16:04, 21 February 2017 diff hist 0 N File:Fig 104.7 2017.doc
- 16:03, 21 February 2017 diff hist 0 m 104.7 Scoping Estimates Per Estimating and Bidding, updated Cost Estimate Guide for rural preliminary design
- 14:46, 21 February 2017 diff hist +1 m Main Page
- 13:27, 21 February 2017 diff hist -64 m 236.13 Designing Right of Way Plans updated links
- 13:24, 21 February 2017 diff hist +11 m Category:101 Standard Forms updated link
- 13:22, 21 February 2017 diff hist -118 m 238.2 Land Surveying updated links