User contributions
Jump to navigation
Jump to search
- 12:50, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report a.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report a.pdf current
- 12:49, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 13 to 15.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 13 to 15.pdf current
- 12:38, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 12 to 14.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 12 to 14.pdf current
- 12:36, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 11 to 13.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 11 to 13.pdf current
- 12:31, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 10 to 12.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 10 to 12.pdf current
- 12:29, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 09 to 12.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 09 to 12.pdf current
- 12:27, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 08 to 10.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 08 to 10.pdf current
- 11:26, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 07 to 09.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 07 to 09.pdf current
- 11:25, 23 July 2018 diff hist 0 File:104.7 Engineering Factors Report 06 to 08.pdf EPGsysop uploaded a new version of File:104.7 Engineering Factors Report 06 to 08.pdf current
- 11:24, 23 July 2018 diff hist 0 File:104.2 Project Scoping Process.pdf EPGsysop uploaded a new version of File:104.2 Project Scoping Process.pdf
- 11:21, 23 July 2018 diff hist 0 File:102.2 CPQ.pdf EPGsysop uploaded a new version of File:102.2 CPQ.pdf current
- 11:21, 23 July 2018 diff hist 0 File:101 Request for Transfer of Inpsected Materials.pdf EPGsysop uploaded a new version of File:101 Request for Transfer of Inpsected Materials.pdf current
- 11:20, 23 July 2018 diff hist 0 File:101 Producer Supplier List.pdf EPGsysop uploaded a new version of File:101 Producer Supplier List.pdf current
- 11:19, 23 July 2018 diff hist 0 File:101 No Rise Certificate 2017.pdf EPGsysop uploaded a new version of File:101 No Rise Certificate 2017.pdf current
- 11:16, 23 July 2018 diff hist 0 File:101 No Rise Certificate 2015.pdf EPGsysop uploaded a new version of File:101 No Rise Certificate 2015.pdf current
- 11:03, 23 July 2018 diff hist 0 File:101 Maintenance - Commuter Lot Survey.pdf EPGsysop uploaded a new version of File:101 Maintenance - Commuter Lot Survey.pdf
- 11:01, 23 July 2018 diff hist 0 File:101 Maintenance - blankinspreport.pdf EPGsysop uploaded a new version of File:101 Maintenance - blankinspreport.pdf
- 10:58, 23 July 2018 diff hist 0 File:101 Land Disturbance Inspection QRG.pdf EPGsysop uploaded a new version of File:101 Land Disturbance Inspection QRG.pdf current
- 10:57, 23 July 2018 diff hist 0 File:101 Land Disturbance Initial Setup QRG.pdf EPGsysop uploaded a new version of File:101 Land Disturbance Initial Setup QRG.pdf current
- 10:38, 23 July 2018 diff hist 0 File:101 Land Disturbance Deficiency QRG.pdf EPGsysop uploaded a new version of File:101 Land Disturbance Deficiency QRG.pdf
- 08:07, 23 July 2018 diff hist +4 m Category:753 Bridge Inspection Rating Per BR, updated contact info
- 07:38, 23 July 2018 diff hist 0 File:101 Floodplain Development Permit Application Oct 2015.pdf EPGsysop uploaded a new version of File:101 Floodplain Development Permit Application Oct 2015.pdf current
- 07:38, 23 July 2018 diff hist 0 File:101 Floodplain Development Permit Application 2015.pdf EPGsysop uploaded a new version of File:101 Floodplain Development Permit Application 2015.pdf current
- 07:37, 23 July 2018 diff hist 0 File:101 Floodplain Development Permit Application.pdf EPGsysop uploaded a new version of File:101 Floodplain Development Permit Application.pdf current
- 07:36, 23 July 2018 diff hist 0 File:101 Affidavit for Compliance with Prevailing Wage.pdf EPGsysop uploaded a new version of File:101 Affidavit for Compliance with Prevailing Wage.pdf current
- 08:56, 19 July 2018 diff hist -5,741 Help Article
- 08:54, 19 July 2018 diff hist -5,067 Main Page
- 13:52, 29 June 2018 diff hist +93 m Main Page EPG 618
- 13:51, 29 June 2018 diff hist +4,418 m Category:618 Mobilization Per CM, new guidance clarifies how REs should always have been administering payment for Mobilization according to the current spec
- 15:15, 28 June 2018 diff hist 0 m Main Page
- 15:00, 28 June 2018 diff hist 0 N File:402 CLC Contractor June 2018.pdf
- 15:00, 28 June 2018 diff hist +5 m Category:402 Bituminous Surface Leveling minor correction
- 14:29, 28 June 2018 diff hist 0 N File:Main Page June 28, 2018.jpg current
- 14:29, 28 June 2018 diff hist +417 m Main Page
- 13:03, 28 June 2018 diff hist +68 m Main Page EPG 236.7.5.4
- 12:30, 28 June 2018 diff hist +1,184 m 236.7 Negotiation →236.7.5.4 Acquisition from State of Missouri Agencies: Per RW, clarified when we acquire property from the State of MO, specifically, the Univ. of MO and Dept. of Conservation
- 15:08, 27 June 2018 diff hist +81 m 238.2 Land Surveying →238.2.17 Professional Land Surveyor Review: Per RW, further clarified guidance
- 10:10, 27 June 2018 diff hist 0 m 751.1 Preliminary Design Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 10:09, 27 June 2018 diff hist 0 m 320.4 Procedure for Final Sounding Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 10:09, 27 June 2018 diff hist 0 m 320.3 Drilling Operations Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 10:08, 27 June 2018 diff hist 0 N File:751.1.2.20 Request Jun 2018.xlsx current
- 10:07, 27 June 2018 diff hist 0 m Category:101 Standard Forms →Bridge: Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 14:27, 26 June 2018 diff hist +121 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2.6 Civil Geometry Report: Per CADD, updated reference to document used to produce the Civil Geometry Report. The archaic "MoDOTCivilGeometry Report" was replaced.
- 10:25, 26 June 2018 diff hist -121 m Main Page EPG 238.2.17
- 08:32, 26 June 2018 diff hist +162 m 238.2 Land Surveying Per RW, clarified EPG 238.2.17 with current business practices. Updated Exhibit A - legal descriptions-survey approval and Form 238.2.18.2 Plat Review Checklist.
- 13:17, 22 June 2018 diff hist +1 m Main Page
- 09:28, 22 June 2018 diff hist -5 m Category:134 Engineering Professional Services →134.1.1 Federal Law: updated broken CFR 172.3 link
- 10:28, 21 June 2018 diff hist 0 N File:127.25.2.1 Hazardous June 2018.docx current
- 10:27, 21 June 2018 diff hist +5 m 127.25 Maintenance Environmental Policies Per Env'l, updated "Hazardous Materials Response Plan" document
- 08:58, 21 June 2018 diff hist -3 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, updated " checklist of the jobsite posters" link
- 08:43, 21 June 2018 diff hist +12 m Category:101 Standard Forms →Construction and Materials: Per CM, retitled all of the On-Call spreadsheets to begin with JOC. Updated their links. Added new Microsurfacing JOC.
- 12:42, 19 June 2018 diff hist -6 m 606.1 Guardrail →606.1.3.5.1 Closures of Existing Streets and Roads: Per TS, with the help of the WZQC, EPG 606.1.3.5 had minor clarifications to reflect the current practices at MoDOT.
- 12:40, 19 June 2018 diff hist 0 N File:616.8.8a MT 2018.pdf current
- 12:39, 19 June 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H)
- 12:37, 19 June 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, with the help of the WZQC, EPG 606.1.3.5 had minor clarifications to reflect the current practices at MoDOT. A reference to EPG 606.1.3.5 was added to TA-8a.
- 11:14, 15 June 2018 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added On-Call Lighting Repair Job Order
- 09:16, 15 June 2018 diff hist +22 m 236.7 Negotiation →236.7.6.3 Acquisition Procedure: updated link
- 09:15, 15 June 2018 diff hist -54 m 236.4 Description Writing and Titles →236.4.4.8 Obtaining Title Insurance: Per RW, clarified EPG 236.4.4.8 Obtaining Title Insurance with guidance reflecting current title commitment business practices.
- 08:21, 15 June 2018 diff hist -2 m Main Page
- 08:13, 14 June 2018 diff hist +47 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, added pay item
- 15:10, 13 June 2018 diff hist +98 m Category:751 LRFD Bridge Design Guidelines Per BR, guidance about specs for designing retaining walls to long-established current standards
- 09:17, 13 June 2018 diff hist +81 m Category:751 LRFD Bridge Design Guidelines Per BR, updated link to report
- 13:22, 11 June 2018 diff hist +197 m Category:321 Geotechnical Engineering Per Geotech, updated some FHWA reference documents
- 09:52, 11 June 2018 diff hist -62 m 127.28 Planning and Environmental Linkages (PEL) and the National Environmental Policy Act (NEPA) Per TP, updated Long-Range Plan link
- 09:49, 11 June 2018 diff hist -14 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, updated Long-Range Plan links
- 12:13, 7 June 2018 diff hist 0 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.3 Quantity Sheet Procedure (Column Headings): corrected link
- 11:27, 7 June 2018 diff hist +266 m 616.22 Advanced Work Zone Training Per WZQC, updated training link
- 11:25, 7 June 2018 diff hist +107 m 616.21 Work Zone Technician Training Per WZQC, updated training link
- 14:27, 6 June 2018 diff hist +2 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 14:27, 6 June 2018 diff hist +4 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 14:26, 6 June 2018 diff hist +2 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 14:25, 6 June 2018 diff hist 0 N File:D-12 June 6 2018.pdf current
- 14:25, 6 June 2018 diff hist +4 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 07:47, 6 June 2018 diff hist 0 m Main Page
- 13:57, 5 June 2018 diff hist +5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 13:57, 5 June 2018 diff hist +10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 13:56, 5 June 2018 diff hist +5 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 13:55, 5 June 2018 diff hist 0 N File:D-12 June 2018.pdf current
- 13:55, 5 June 2018 diff hist +10 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 13:31, 5 June 2018 diff hist -5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, updated D-12
- 13:30, 5 June 2018 diff hist -10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, updated D-12
- 13:28, 5 June 2018 diff hist -5 m Category:101 Standard Forms Per Bidding and Est'g, updated D-12
- 13:27, 5 June 2018 diff hist 0 N File:D-12 2018.pdf current
- 13:27, 5 June 2018 diff hist -2 m 237.9 Submission of Plans and Supporting Documents
- 13:26, 5 June 2018 diff hist -8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated D-12
- 10:41, 5 June 2018 diff hist -239 m Main Page EPG 751.11.2.1
- 10:33, 5 June 2018 diff hist +428 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.
- 15:17, 1 June 2018 diff hist +4 m Main Page
- 11:21, 1 June 2018 diff hist +1 m 751.50 Standard Detailing Notes →B3a. Bridges
- 10:47, 1 June 2018 diff hist +2 Main Page
- 10:46, 1 June 2018 diff hist -409 m Main Page EPG 751.50
- 10:43, 1 June 2018 diff hist +28 m 751.50 Standard Detailing Notes Per BR, updated Note B3.2
- 12:20, 31 May 2018 diff hist +7 m Main Page
- 12:06, 31 May 2018 diff hist -534 m Category:109 Measurement and Payment →109.7.1 Payment Estimates: Per CM, the Electronics Documentation Choice Request Form is now obsolete since all projects have the eConstruction JSP, which disallows the use of paper submittals.
- 09:43, 31 May 2018 diff hist -145 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, removed redundant #10 (was same as #9b) and renumbered following points
- 12:11, 30 May 2018 diff hist 0 m Category:109 Measurement and Payment →109.13 Prompt Payment to Subcontractors and Suppliers (for Sec 109.13): Per CM and ECR, pay period corrected to 15 days per Sec 109.13 and State Statue 34.057
- 10:47, 30 May 2018 diff hist 0 m 903.14 Memorial Signs →903.15.2 Memorial Highway and Bridge Program (M18-1, M18-2) (MUTCD Section 2M.10): Per TS, updated contact number
- 10:22, 30 May 2018 diff hist 0 N File:616.26 2018.jpg current
- 10:21, 30 May 2018 diff hist 0 m 616.26 Work Zone User Training current
- 10:17, 30 May 2018 diff hist +287 m 616.26 Work Zone User Training Per TS, updated links to training manuals
- 12:56, 25 May 2018 diff hist +14 m 413.1 Micro-Surfacing
- 12:31, 24 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 11:21, 24 May 2018 diff hist -66 m Main Page EPG 751.10.3.1
- 10:32, 24 May 2018 diff hist +4 m Category:625 Slab Stabilization Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:409 Seal Coat Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:402 Bituminous Surface Leveling Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:30, 24 May 2018 diff hist +4 m Category:401 Bituminous Base and Pavement Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:29, 24 May 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx
- 10:29, 24 May 2018 diff hist +4 m Category:403 Asphaltic Concrete Pavement
- 10:16, 24 May 2018 diff hist +409 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 10:09, 24 May 2018 diff hist -237 617.2 Construction Inspection Guidelines for Sec 617 Per CM and EPS, eliminated the specified 4 ft distance required between traffic barrier and stored material. Associated with request #842 (5/17/18)
- 09:55, 24 May 2018 diff hist +522 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, stated the allowed slab drain color coatings
- 15:04, 23 May 2018 diff hist +15 m Main Page
- 15:03, 23 May 2018 diff hist 0 N File:Main Page May 23, 2018.jpg current
- 15:02, 23 May 2018 diff hist -182 m Main Page
- 14:53, 22 May 2018 diff hist +1 m Main Page
- 11:14, 22 May 2018 diff hist +247 m Main Page EPG 106.12.1.1
- 11:12, 22 May 2018 diff hist -93 m 106.12 Pre-Acceptance Lists (PAL) →3) PAL Material Arrival Confirmation: Per CM, clarified Pre-Acceptance Identification Tag guidance to allow for identifying PAL material shipped to MoDOT projects.
- 10:45, 21 May 2018 diff hist 0 N File:121 Planning Framework 2018.docx current
- 10:45, 21 May 2018 diff hist +5 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, minor clarifications to "The Planning Framework for Transportation Decision Making"
- 13:50, 18 May 2018 diff hist 0 m Main Page
- 13:27, 18 May 2018 diff hist 0 N File:Main Page May 18, 2018.jpg current
- 13:26, 18 May 2018 diff hist +329 m Main Page
- 09:56, 18 May 2018 diff hist -10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, delayed correcting the sign number GO22-1 for Wet Paint Signs until later this year.
- 09:52, 18 May 2018 diff hist 0 N File:616.8.35a DECM 2018.pdf current
- 09:52, 18 May 2018 diff hist 0 N File:616.8.17a DECM 2018.pdf current
- 09:51, 18 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 15:44, 17 May 2018 diff hist +1 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM, updated contact name
- 15:23, 17 May 2018 diff hist +1 m Main Page
- 14:55, 17 May 2018 diff hist +35 m Main Page
- 14:54, 17 May 2018 diff hist +51 m 617.2 Construction Inspection Guidelines for Sec 617
- 14:51, 17 May 2018 diff hist +303 m Main Page EPG 616.19.2.5, EPG 617.2, EPG 806.7
- 14:47, 17 May 2018 diff hist 0 N File:806 Zone 3.jpg current
- 14:46, 17 May 2018 diff hist 0 N File:806 Zone 2.jpg current
- 14:46, 17 May 2018 diff hist 0 N File:806 Zone 1.jpg current
- 14:45, 17 May 2018 diff hist 0 N File:806 design guidance map.jpg current
- 14:43, 17 May 2018 diff hist +2,557 Category:806 Pollution, Erosion and Sediment Control →Temporary Erosion Control Blankets (Sec. 806.90): Per Env'l, the types of erosion control blankets were increased and guidance now includes a matrix for choosing blanket types
- 14:39, 17 May 2018 diff hist +3 750.6 Erosion Control and Energy Dissipation →750.6.3.4 Erosion Control Blankets and Turf Reinforcement Mats: Per Env'l, the types of erosion control blankets were increased
- 14:23, 17 May 2018 diff hist -730 617.2 Construction Inspection Guidelines for Sec 617 Per EPS, clarified guidance for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.
- 14:19, 17 May 2018 diff hist +11 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.5 Temporary Traffic Barriers: Per EPS, clarified guidance for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.
- 13:10, 14 May 2018 diff hist -34 m Main Page EPG 153.8
- 13:02, 14 May 2018 diff hist +21 m 153.9 Design
- 08:49, 14 May 2018 diff hist +882 m 153.9 Design Per DE, modified the reviewer column for DE43, DE44, DE46-49
- 12:05, 11 May 2018 diff hist -267 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, removed the associated numbers from the posters
- 12:03, 11 May 2018 diff hist +15 m Main Page
- 11:23, 11 May 2018 diff hist 0 N File:236.16 Vegetation Permit 2018.pdf current
- 11:23, 11 May 2018 diff hist 0 N File:236.16 Reject Vegetation Cover 2018.pdf current
- 11:22, 11 May 2018 diff hist -252 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated two correspondence forms
- 11:05, 11 May 2018 diff hist -2 m Main Page
- 10:41, 11 May 2018 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 10:39, 11 May 2018 diff hist +268 m Main Page EPG 110.2
- 10:30, 11 May 2018 diff hist +406 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, added three Federal Aid Projects posters
- 14:56, 10 May 2018 diff hist +22 m 751.14 Steel Superstructure →751.14.5.9 Weathering Steel
- 14:54, 10 May 2018 diff hist 0 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements
- 08:07, 10 May 2018 diff hist 0 N File:101 Floodplain Development Permit Application May 2018.pdf current
- 08:07, 10 May 2018 diff hist +4 m Category:101 Standard Forms Per BR, minor correction to Floodplain Development Permit Application
- 13:24, 9 May 2018 diff hist -1 m Category:110 State and Federal Wage Rates and Other Requirements
- 13:23, 9 May 2018 diff hist -1,251 m Main Page EPG 110.3.4
- 12:29, 9 May 2018 diff hist +920 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM, new guidance about the DOL's PW-2 form agreed to by DOL
- 08:48, 9 May 2018 diff hist -34 m Main Page EPG 231.4
- 08:46, 9 May 2018 diff hist +421 m 231.4 Shoulder Width →231.4.1 Introduction: Per DE, revised guidance about guardrail placement from the edge of the shoulder to bring guidance in line with Std Plan 606.00.
- 12:38, 7 May 2018 diff hist 0 m Main Page
- 11:16, 7 May 2018 diff hist 0 N File:Main Page May 7, 2018.jpg current
- 11:16, 7 May 2018 diff hist -35 m Main Page
- 08:17, 4 May 2018 diff hist +7 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.5 Electronic Information for Bidder’s Automation: Per Bidding and Contracts, minor correction
- 07:25, 4 May 2018 diff hist 0 N File:910 TSMO.pdf current
- 07:24, 4 May 2018 diff hist +43 m Category:910 Intelligent Transportation Systems Per TS, added TSM&O info
- 15:22, 3 May 2018 diff hist -1 m 751.1 Preliminary Design →751.1.3.9 Environmental Considerations: Asbestos, Lead and Recoating
- 13:36, 3 May 2018 diff hist +34 m Main Page
- 13:33, 3 May 2018 diff hist 0 N File:Main Page Apr 3, 2018.gif current
- 13:33, 3 May 2018 diff hist 0 N File:Main Page May 3a, 2018.jpg current
- 13:33, 3 May 2018 diff hist 0 N File:Main Page May 3b, 2018.jpg current
- 13:32, 3 May 2018 diff hist +752 m Main Page
- 10:51, 3 May 2018 diff hist +179 m Main Page EPG 751.1.3.9
- 10:30, 3 May 2018 diff hist +2,950 m 751.1 Preliminary Design Per BR, new bridge preliminary design guidance for how to assess asbestos and lead considerations for structure removal, rehabs and recoatings and how to address these considerations on Bridge Memo
- 11:16, 2 May 2018 diff hist -355 m Main Page EPG 237.14.3.6
- 07:33, 2 May 2018 diff hist +810 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.6 Electronic Design Data for MoDOT Construction: Per CADD, clarified guidance
- 12:06, 1 May 2018 diff hist +152 m 238.3 Route Surveying →238.3.36.3.3 Field Notebooks: Per BR, corrected error
- 11:17, 1 May 2018 diff hist -1 m Main Page
- 09:21, 1 May 2018 diff hist +150 m Category:747 Bridge Reports and Layouts
- 13:45, 30 April 2018 diff hist 0 m 751.36 Driven Piles →751.36.3 Design Procedure: Per BR, minor correction
- 13:39, 30 April 2018 diff hist -238 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated links
- 09:10, 30 April 2018 diff hist +346 m Main Page EPG 236.16
- 09:04, 30 April 2018 diff hist -2,351 m 236.16 Outdoor Advertising Per Outdoor Advertising, several revisions due to Administrative Rule Revisions
- 08:30, 30 April 2018 diff hist -7 m Category:747 Bridge Reports and Layouts →747.2.2.4 GEO Files for Stream Crossings: Per CADD, minor updates
- 11:24, 27 April 2018 diff hist -149 Main Page
- 11:19, 27 April 2018 diff hist 0 N File:Main Page Apr 27, 2018.jpg current
- 11:18, 27 April 2018 diff hist -116 m Main Page
- 10:29, 27 April 2018 diff hist +99 m 102.2 Contractor Performance Rating System →102.2.7 Performance Discussion: Per CM, guidance for when certified mail is necessary for the Contractor Performance Rating replaced older guidance.
- 13:34, 26 April 2018 diff hist -643 m Main Page
- 15:19, 25 April 2018 diff hist 0 N File:751.12.2.3 Non-integral 1 2018.jpg current
- 15:19, 25 April 2018 diff hist 0 N File:751.12.2.3 Integral 1 2018.jpg current
- 15:18, 25 April 2018 diff hist +10 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.3 End Bent Reinforcement: Per BR, corrected dimensions for K5-K8 bars placed in end bent wings and extending into bridge barrier.
- 14:30, 25 April 2018 diff hist -688 m Main Page EPG 751.50
- 14:27, 25 April 2018 diff hist +410 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, new std detailing note about deviations in galvanized pile penetration
- 08:40, 25 April 2018 diff hist -263 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.9 Lane Reduction Transition Markings (MUTCD Section 3B.09): Per TS, deleted Fig. 620.2.9.3 since Fig. 620.2.9.1 already covers Fig. 620.2.9.3's critical concepts.
- 08:27, 24 April 2018 diff hist +9 m Category:403 Asphaltic Concrete Pavement →403.1.18 Quality Assurance (Sec 403.18)
- 15:20, 23 April 2018 diff hist +1 m Main Page
- 09:12, 23 April 2018 diff hist +9 Category:1091 Lighting Equipment
- 09:11, 23 April 2018 diff hist -9 Category:1091 Lighting Equipment
- 09:09, 23 April 2018 diff hist 0 Category:1091 Lighting Equipment
- 11:08, 20 April 2018 diff hist +38 m Category:130 Value Engineering →130.2 Value Engineering Change Proposals: Per EPS, updated link
- 14:52, 16 April 2018 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 12:51, 16 April 2018 diff hist -936 m Main Page EPG 903.4.6
- 12:48, 16 April 2018 diff hist +70 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses
- 12:24, 16 April 2018 diff hist +257 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses: Per BR and TS, corrected verbiage that has caused complexities. MoDOT may be the designer and if not, others will submit signed & sealed dwgs.
- 10:24, 16 April 2018 diff hist +412 m Category:235 Preliminary Plans →235.8.2 FAA’s Notice Criteria Tool: Per Bidding and Contract, additional guidance for core teams on appropriately considering the max equipment height for construction projects involving airports
- 13:59, 13 April 2018 diff hist -10 m Main Page EPG 751.50
- 12:34, 13 April 2018 diff hist +2,646 751.50 Standard Detailing Notes Per BR, new clarifying note D1.5; archaic option in D1.21 replaced with current option; new H9.29 for 2 thrie beam std dwgs
- 07:45, 13 April 2018 diff hist 0 m 949.2 Speed Limit Guidelines →949.2.3 Additional Guidelines for Establishing Speed Limits: Per TS, minor clarification
- 12:56, 11 April 2018 diff hist -566 m Main Page EPG 751.8
- 12:51, 11 April 2018 diff hist 0 N File:751.8.3.4.jpg current
- 12:50, 11 April 2018 diff hist +1,473 m 751.8 LRFD Concrete Box Culverts Per BR, added guidance for culvert wing walls on rock.
- 08:01, 11 April 2018 diff hist +60 m 127.25 Maintenance Environmental Policies
- 07:57, 11 April 2018 diff hist -192 m 127.25 Maintenance Environmental Policies Per Env'l, updated several links
- 12:53, 10 April 2018 diff hist +10 m Main Page EPG 110.1
- 11:28, 10 April 2018 diff hist +715 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.10.1
- 11:17, 10 April 2018 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5)
- 11:16, 10 April 2018 diff hist -5 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5)
- 11:15, 10 April 2018 diff hist +269 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5): Per FHWA and DE, updated guidance about including the correct wage rate order from the Dept. of Labor on both MoDOT and LPA projects
- 11:11, 10 April 2018 diff hist +437 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per FHWA and DE, updated guidance about including the correct wage rate order from the Dept. of Labor on both MoDOT and LPA projects.
- 09:30, 10 April 2018 diff hist -2 m 751.6 General Quantities →751.6.1 Index of Quantities
- 09:06, 10 April 2018 diff hist +189 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, added Open Cell Foam Joint System pay items
- 13:05, 9 April 2018 diff hist -193 m Main Page EPG 127.29.7
- 13:01, 9 April 2018 diff hist +695 127.29 Stormwater →127.29.7 MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment: Per Env'l, added guidance per permit agreement with MDNR.
- 14:36, 6 April 2018 diff hist 0 N File:Main Page Apr 6c, 2018.jpg current
- 14:36, 6 April 2018 diff hist 0 N File:Main Page Apr 6b, 2018.gif current
- 14:36, 6 April 2018 diff hist 0 Main Page
- 14:35, 6 April 2018 diff hist 0 N File:Main Page Apr 6a, 2018.jpg current
- 14:35, 6 April 2018 diff hist 0 N File:Main Page Apr 6, 2018.jpg current
- 14:34, 6 April 2018 diff hist +739 m Main Page
- 12:28, 6 April 2018 diff hist +16 m 320.4 Procedure for Final Sounding Per BR, updated Request for Final Soundings for Structures Form
- 12:27, 6 April 2018 diff hist +8 m 320.3 Drilling Operations Per BR, updated Request for Final Soundings for Structures Form
- 12:25, 6 April 2018 diff hist 0 N File:751.1.2.19 Guidance 2018.xlsx
- 12:24, 6 April 2018 diff hist -2 m 751.1 Preliminary Design Per BR, updated Request for Final Soundings for Structures Form and Guidance for Request for Final Soundings of Structures
- 12:21, 6 April 2018 diff hist 0 N File:751.1.2.20 Request Apr 2018.xlsx current
- 12:20, 6 April 2018 diff hist +4 m Category:101 Standard Forms Per BR, updated Request for Final Soundings for Structures Form
- 13:29, 5 April 2018 diff hist -93 m Main Page EPG 110.2
- 13:26, 5 April 2018 diff hist +1 Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, revised the bulletin board inspection rate from every two months to every three months.
- 09:37, 5 April 2018 diff hist +101 m Main Page EPG 749.5
- 09:07, 5 April 2018 diff hist +2,610 Category:749 Hydrologic Analysis Per BR, revised Time of Concentration equation guidance by providing optional combination of Kirby-Hathaway & Kirpich equations and adding the optional low slope factor presented in the new research.
- 15:26, 4 April 2018 diff hist +7 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 15:19, 4 April 2018 diff hist +53 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms: Per CADD, minor revisions to glossary terms
- 15:10, 4 April 2018 diff hist +12 m Category:747 Bridge Reports and Layouts Per BR, Bridge Survey Report further edited
- 15:09, 4 April 2018 diff hist +6 m 238.3 Route Surveying
- 15:08, 4 April 2018 diff hist +6 m Category:101 Standard Forms
- 15:07, 4 April 2018 diff hist 0 N File:747 Bridge Survey Report April 2018.docx current
- 15:07, 4 April 2018 diff hist +6 m Main Page
- 14:34, 4 April 2018 diff hist -311 m Main Page Bridge Survey Report
- 14:29, 4 April 2018 diff hist -41 m Category:101 Standard Forms →Bridge: Per BR, updated Bridge Survey Report