User contributions
Jump to navigation
Jump to search
- 13:43, 7 April 2017 diff hist -6 m 321.1 Design of Earth Slopes
- 13:41, 7 April 2017 diff hist -6 m 616.9 Control of Traffic Through Traffic Incident Management Areas (MUTCD 6I)
- 13:39, 7 April 2017 diff hist -6 m 902.10 Traffic Control Signals for Freeway Entrance Ramps (MUTCD Chapter 4I) →902.10.2 Design of Freeway Entrance Ramp Control Signals (MUTCD Section 4I.02)
- 12:33, 7 April 2017 diff hist -151 m 606.2 Guard Cable →606.2.5 Maintenance and Repair: Per MT, EPG 120 Interstate Maintenance Expectations was recommended to be removed from the EPG with no replacement.
- 12:31, 7 April 2017 diff hist -74 m Category:171 Maintenance Policy and Operations Per MT, MT is removing references to maintaining clear zones and is, instead, using policy in EPG 822 for all RW areas. RDS(E10) deleted.
- 12:29, 7 April 2017 diff hist -245 m 171.6 Roadsides →171.6.4 Vegetation Management: Per MT, MT is removing references to maintaining clear zones and is, instead, using policy in EPG 822 for all RW areas. RDS(E10) deleted.
- 09:08, 7 April 2017 diff hist -618 m 750.2 Culverts Per BR, revised to correlate with 4/9/2015 EPG 750.7.3 Corps of Engineers Regional Condition affecting culvert design revision
- 15:06, 6 April 2017 diff hist -47 m Main Page EPG 751.50
- 14:53, 6 April 2017 diff hist +844 m 751.50 Standard Detailing Notes →H7. Slab Drains: Per BR, correlated slab drain notes with all the slab drain standard drawings.
- 12:56, 6 April 2017 diff hist +482 m 153.5 Bridge Per BR and Commission, added BR19 info
- 13:19, 5 April 2017 diff hist -37 m 902.16 The Mobility Plan – Effective Arterial Management removed archaic link
- 12:58, 5 April 2017 diff hist +17 m 153.13 Highway Safety Per HS and Commission, provided guidance for HS05
- 12:43, 5 April 2017 diff hist -78 m Category:100 GENERAL Per MT, EPG 120 Interstate Maintenance Expectations was recommended to be removed from the EPG with no replacement.
- 12:39, 5 April 2017 diff hist -2,656 m 120.9 Uninterrupted Traffic Flow current
- 12:38, 5 April 2017 diff hist -2,072 m 120.8 Welcome Centers current
- 12:37, 5 April 2017 diff hist -3,124 m 120.7 Drainage Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:37, 5 April 2017 diff hist -5,084 m 120.6 Roadsides Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:36, 5 April 2017 diff hist -4,803 m 120.5 Roadside Features Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:36, 5 April 2017 diff hist -6,308 m 120.4 Traffic Control Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:35, 5 April 2017 diff hist -4,394 m 120.3 Bridges Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:35, 5 April 2017 diff hist -2,903 m 120.2 Shoulders Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:34, 5 April 2017 diff hist -4,355 m 120.1 Pavements Replacing page with '{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="280px" align="center" |- |'''This article ha...' current
- 12:34, 5 April 2017 diff hist -10,311 m Category:120 Interstate Maintenance Expectations Per MT, EPG 120 was recommended to be removed from the EPG with no replacement. current
- 09:10, 5 April 2017 diff hist -640 m Main Page EPG 127.4
- 08:24, 5 April 2017 diff hist +72 m 127.4 Wetlands and Streams →127.4.1.1 Overview
- 08:19, 5 April 2017 diff hist +901 m 127.4 Wetlands and Streams →127.4.1.1 Overview: Per BR, added guidance for determination of stream classification.
- 09:52, 4 April 2017 diff hist +468 m 153.7 Construction and Materials Per CM and Commission, provided guidance for CM02 and CM14
- 08:45, 4 April 2017 diff hist +98 m 153.22 Transportation Planning Per TP and Commission, provided guidance for TP04
- 13:33, 3 April 2017 diff hist +48 m 237.5 Special Provisions →237.5.1 Job Special Provisions: updated link
- 13:32, 3 April 2017 diff hist -11 m 237.5 Special Provisions updated JSP link
- 12:53, 3 April 2017 diff hist +1 m Main Page
- 11:47, 30 March 2017 diff hist -53 m Category:101 Standard Forms →Checklist: Per LPA and CM, updated D-12 link
- 11:46, 30 March 2017 diff hist 0 N File:D-12 Form.docx current
- 11:45, 30 March 2017 diff hist -106 m 237.9 Submission of Plans and Supporting Documents Per LPA and CM, updated D-12 link
- 14:59, 29 March 2017 diff hist -13 m Category:747 Bridge Reports and Layouts Per BR, updated link
- 11:05, 29 March 2017 diff hist 0 m Main Page
- 10:45, 29 March 2017 diff hist -2 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 10:43, 29 March 2017 diff hist -544 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, updated A1.3
- 10:36, 29 March 2017 diff hist 0 m 751.36 Driven Piles →751.36.2 Steel Pile
- 10:35, 29 March 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2.1 Sway Bracing
- 08:41, 29 March 2017 diff hist +418 m Main Page Figs. 616.6.87.1 and .2
- 08:39, 29 March 2017 diff hist -351 m 153.5 Bridge Per Commission, removed unused BR14
- 08:29, 29 March 2017 diff hist 0 N File:Fig 616.6.87.2 2017.jpg current
- 08:29, 29 March 2017 diff hist +10 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per CM, revised two location notes and the color of the rumbles in the legend to aid designers in completing temporary traffic control plans.
- 08:27, 29 March 2017 diff hist 0 N File:Fig 616.6.87.1 2017.jpg current
- 08:25, 29 March 2017 diff hist 0 N File:Fig 616.6.87.1 2017.pdf
- 15:38, 28 March 2017 diff hist +216 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 15:36, 28 March 2017 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.9.3
- 15:35, 28 March 2017 diff hist 0 N File:136.9.3 2017.docx
- 15:35, 28 March 2017 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, amended Fig 136.3.9 to reflect changes made to EPG on Wage Rate. Deleted State Only Prevailing wage option in section 9.
- 12:32, 28 March 2017 diff hist -8 m 153.23 Utility updated links
- 12:25, 28 March 2017 diff hist +53 m 153.23 Utility updated links
- 12:18, 28 March 2017 diff hist -13 m 153.19 Multimodal Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan, Jenni Jones and Comm Secr, updated tables to relfect current contract listings
- 14:29, 27 March 2017 diff hist 0 N File:153.8 DE07 Instr 2017.pdf current
- 14:29, 27 March 2017 diff hist +5 m 153.9 Design
- 14:29, 27 March 2017 diff hist 0 N File:153.10 FS08 Instr 2017.pdf current
- 14:28, 27 March 2017 diff hist +5 m 153.11 Financial Services
- 13:46, 27 March 2017 diff hist +203 m Main Page E 153
- 09:40, 27 March 2017 diff hist -6 m 153.10 Design – Escrow
- 09:37, 27 March 2017 diff hist +18 m 153.10 Design – Escrow
- 09:37, 27 March 2017 diff hist +18 m 153.9 Design
- 09:36, 27 March 2017 diff hist +18 m 153.8 Customer Relations
- 09:35, 27 March 2017 diff hist +18 m 153.7 Construction and Materials
- 09:34, 27 March 2017 diff hist +6 m 153.5 Bridge
- 09:23, 27 March 2017 diff hist +351 m 153.5 Bridge Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:05, 27 March 2017 diff hist +222 m 153.7 Construction and Materials Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 08:51, 27 March 2017 diff hist +763 m 153.9 Design Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 08:19, 27 March 2017 diff hist -15 m 153.10 Design – Escrow Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 08:14, 27 March 2017 diff hist -470 m 153.11 Financial Services Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated tables to relfect current contract listings
- 12:34, 24 March 2017 diff hist +226 m 153.12 General Services Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 10:14, 24 March 2017 diff hist +371 m 153.13 Highway Safety Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 10:09, 24 March 2017 diff hist -329 m 153.14 Human Resources Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:56, 24 March 2017 diff hist -331 m 153.21 Traffic Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:53, 24 March 2017 diff hist +327 m 153.22 Transportation Planning Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:31, 24 March 2017 diff hist +355 m 153.23 Utility Per Brandi J. Baldwin; Melissa Wilbers; Monica H. Duncan and Comm Secr, updated table to relfect current contract listings
- 09:11, 24 March 2017 diff hist -1 m 606.1 Guardrail minor correction
- 08:05, 24 March 2017 diff hist -375 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10)
- 08:01, 24 March 2017 diff hist +1,235 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10): Per Brandi Baldwin and Commission's Secretary, updated to reflect current eAgreement process
- 07:50, 24 March 2017 diff hist +572 m Category:153 Agreements and Contracts Per Brandi Baldwin and Commission's Secretary, updated to reflect current eAgreement process
- 14:17, 23 March 2017 diff hist -933 m 903.15 Signing Agreements updated archaic links
- 14:15, 23 March 2017 diff hist -36 m 903.14 Memorial Signs updated archaic link
- 14:01, 23 March 2017 diff hist -36 m 903.13 State and Federal Recreation and Historic Site Signing updated archaic link
- 13:59, 23 March 2017 diff hist -72 m 903.10 General Service Signs updated archaic links
- 13:57, 23 March 2017 diff hist -36 m 903.9 General Information Signs →903.9.11 Custom City Limit and Custom County Line Signs (I4-1a, I4-2b, I4-2c, I6-1a): updated archaic link
- 13:53, 23 March 2017 diff hist -36 m 903.5 Regulatory Signs →903.5.43 Noise Ordinance Signing: updated archaic link
- 13:49, 23 March 2017 diff hist -90 m 903.18 Signing for School Areas updated archaic link
- 12:18, 23 March 2017 diff hist +140 m Category:613 Pavement Repair added video
- 09:36, 23 March 2017 diff hist -100 m 903.18 Signing for School Areas →903.19.5.1 School Assembly Installation Contracts: updated archaic link
- 09:30, 23 March 2017 diff hist -72 m 902.11 Traffic Control for Schools →902.11.1 School Crossing Indications at Existing Signal: updated archaic links
- 10:38, 22 March 2017 diff hist +1 m 153.20 Right of Way minor correction
- 13:36, 21 March 2017 diff hist -337 m Main Page EPG 153.19
- 13:20, 21 March 2017 diff hist -136 m 153.20 Right of Way Per RW, updated ROW agreement information to current procedures
- 11:16, 21 March 2017 diff hist +2 m 751.50 Standard Detailing Notes →G5. CIP Concrete Piles (Notes for Bridge Standard Drawings)
- 14:45, 20 March 2017 diff hist +65 m 751.50 Standard Detailing Notes →G5. CIP Concrete Pile (Notes for Bridge Standard Drawings): Per BR, several minor clarifications
- 13:52, 20 March 2017 diff hist +14 m 751.50 Standard Detailing Notes →G5b Open Ended Cast-in Place (OECIP) Concrete Pile
- 13:51, 20 March 2017 diff hist +106 m 751.50 Standard Detailing Notes →G5a Closed Ended Cast-in Place (CECIP) Concrete Pile
- 13:50, 20 March 2017 diff hist +13 m 751.50 Standard Detailing Notes →G5a Closed Ended Cast-in Place (CECIP) Concrete Pile
- 13:49, 20 March 2017 diff hist -5 m 751.50 Standard Detailing Notes →B3a. Bridges
- 13:46, 20 March 2017 diff hist -1 m 751.50 Standard Detailing Notes →G5b Open Ended Cast-in Place (OCECIP) Concrete Pile
- 13:45, 20 March 2017 diff hist 0 m 751.50 Standard Detailing Notes →G5. CIP Concrete Pile (Notes for Bridge Standard Drawings)
- 12:58, 20 March 2017 diff hist -250 m Main Page EPG 616.1
- 12:42, 20 March 2017 diff hist +55 m 606.1 Guardrail →606.1.3.2 End Terminals, Crash Cushions and Anchors: inserted link
- 11:13, 20 March 2017 diff hist +495 m 606.1 Guardrail →606.1.3.2 End Terminals, Crash Cushions and Anchors: Per EPG, clarified grading limits and associated std plans
- 14:50, 17 March 2017 diff hist +118 m 751.50 Standard Detailing Notes Per BR, std details further revised to accommodate galvanized piling
- 14:39, 17 March 2017 diff hist +2,609 m 751.50 Standard Detailing Notes →G5. 20" and 24" CIP Piles: Per BR, renamed "CIP Concrete Piles (Notes for Bridge Standard Drawings" and expanded to accommodate galvanized piling
- 12:57, 17 March 2017 diff hist -9 m Other Aspects of Pavement Design →Shoulder Surface: Per EPG, guidance involving "should" and interstates was futher clarified
- 10:12, 17 March 2017 diff hist 0 m Category:101 Standard Forms →Bridge
- 10:10, 17 March 2017 diff hist 0 N File:101 No Rise Certificate 2017.pdf
- 10:10, 17 March 2017 diff hist 0 N File:101 Floodplain Development Permit Application 2017.pdf current
- 10:09, 17 March 2017 diff hist -4 m Category:101 Standard Forms →Bridge: Per BR, updated “Floodplain Development Permit/Application” and “No-Rise Certificate” by correcting title for SEMA contact and adding digital signatures and seal blocks
- 09:51, 17 March 2017 diff hist +75 m Main Page EPG 616.14.10
- 09:42, 17 March 2017 diff hist +10 m Category:Safe and Sound updated link
- 09:41, 17 March 2017 diff hist +10 m Category:105 Control of Work updated link
- 09:40, 17 March 2017 diff hist 0 N File:616.14.10 TMP.pdf current
- 09:39, 17 March 2017 diff hist +1,591 m 616.14 Work Zone Safety and Mobility Policy Per DE Liaison, clarified existing expectations for WZ Transportation Management Plan
- 08:26, 17 March 2017 diff hist -21 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per ECR, updated links to four posters
- 07:24, 17 March 2017 diff hist -62 m Main Page EPG 751.50
- 07:19, 17 March 2017 diff hist +389 m 751.50 Standard Detailing Notes →H11. Miscellaneous: Per BR, it is not required for AASHTO’s design live load for ornamental pedestrian fencing to be applied simultaneously
- 13:32, 16 March 2017 diff hist -253 m Main Page EPG 236.16.9
- 13:18, 16 March 2017 diff hist -487 m 236.16 Outdoor Advertising →236.16.9 Maintenance and Repair of Outdoor Advertising: Per RW, revised process for sending ODA courtesy letter
- 11:19, 16 March 2017 diff hist 0 N File:751.1.2.19 Guidance 2016 June.xlsx
- 11:11, 16 March 2017 diff hist +4 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 11:07, 16 March 2017 diff hist -47 m 751.1 Preliminary Design →751.1.2.19.3 Required Documents: Per BR, updated Foundation Report due date
- 10:30, 16 March 2017 diff hist +22 m Other Aspects of Pavement Design →Shoulder Surface: Per DE, minor clarification for Type A3 shoulder use
- 09:18, 16 March 2017 diff hist 0 N File:616.14 WZ Questions 2017.docx current
- 09:17, 16 March 2017 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy Minor updates to Work Zone Questions for the Core Team
- 08:38, 16 March 2017 diff hist +307 m Main Page EPG 903.18
- 08:16, 16 March 2017 diff hist 0 N File:903 18 4.pdf current
- 08:15, 16 March 2017 diff hist 0 N File:903 18 2.pdf current
- 08:15, 16 March 2017 diff hist +795 m 903.17 Delineation and Object Markers Per TS, clarified Object Marker usage policy including figures showing standard installation details.
- 07:23, 16 March 2017 diff hist 0 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 07:21, 16 March 2017 diff hist 0 N File:751.50 Layer 2.jpg current
- 07:21, 16 March 2017 diff hist +29 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 07:20, 16 March 2017 diff hist 0 N File:751.50 Layer 1.jpg current
- 07:19, 16 March 2017 diff hist +28 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 07:13, 16 March 2017 diff hist +105 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:22, 15 March 2017 diff hist +119 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:14, 15 March 2017 diff hist 0 N File:751.50 ksf.jpg current
- 15:14, 15 March 2017 diff hist 0 N File:751.50 ftlb.jpg current
- 15:14, 15 March 2017 diff hist +61 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:10, 15 March 2017 diff hist 0 N File:751.50 kip.jpg current
- 15:10, 15 March 2017 diff hist -150 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:02, 15 March 2017 diff hist 0 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:00, 15 March 2017 diff hist 0 N File:751.50 ft.jpg current
- 15:00, 15 March 2017 diff hist -89 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:58, 15 March 2017 diff hist +5 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:57, 15 March 2017 diff hist 0 N File:751.50 ea.jpg current
- 14:57, 15 March 2017 diff hist -454 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:04, 15 March 2017 diff hist +1,417 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 13:39, 15 March 2017 diff hist +83 m 751.1 Preliminary Design →751.1.2.31 Finishing Up Design Layout