User contributions
Jump to navigation
Jump to search
- 09:09, 23 April 2018 diff hist 0 Category:1091 Lighting Equipment
- 11:08, 20 April 2018 diff hist +38 m Category:130 Value Engineering →130.2 Value Engineering Change Proposals: Per EPS, updated link
- 14:52, 16 April 2018 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 12:51, 16 April 2018 diff hist -936 m Main Page EPG 903.4.6
- 12:48, 16 April 2018 diff hist +70 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses
- 12:24, 16 April 2018 diff hist +257 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses: Per BR and TS, corrected verbiage that has caused complexities. MoDOT may be the designer and if not, others will submit signed & sealed dwgs.
- 10:24, 16 April 2018 diff hist +412 m Category:235 Preliminary Plans →235.8.2 FAA’s Notice Criteria Tool: Per Bidding and Contract, additional guidance for core teams on appropriately considering the max equipment height for construction projects involving airports
- 13:59, 13 April 2018 diff hist -10 m Main Page EPG 751.50
- 12:34, 13 April 2018 diff hist +2,646 751.50 Standard Detailing Notes Per BR, new clarifying note D1.5; archaic option in D1.21 replaced with current option; new H9.29 for 2 thrie beam std dwgs
- 07:45, 13 April 2018 diff hist 0 m 949.2 Speed Limit Guidelines →949.2.3 Additional Guidelines for Establishing Speed Limits: Per TS, minor clarification
- 12:56, 11 April 2018 diff hist -566 m Main Page EPG 751.8
- 12:51, 11 April 2018 diff hist 0 N File:751.8.3.4.jpg current
- 12:50, 11 April 2018 diff hist +1,473 m 751.8 LRFD Concrete Box Culverts Per BR, added guidance for culvert wing walls on rock.
- 08:01, 11 April 2018 diff hist +60 m 127.25 Maintenance Environmental Policies
- 07:57, 11 April 2018 diff hist -192 m 127.25 Maintenance Environmental Policies Per Env'l, updated several links
- 12:53, 10 April 2018 diff hist +10 m Main Page EPG 110.1
- 11:28, 10 April 2018 diff hist +715 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.10.1
- 11:17, 10 April 2018 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5)
- 11:16, 10 April 2018 diff hist -5 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5)
- 11:15, 10 April 2018 diff hist +269 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5): Per FHWA and DE, updated guidance about including the correct wage rate order from the Dept. of Labor on both MoDOT and LPA projects
- 11:11, 10 April 2018 diff hist +437 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per FHWA and DE, updated guidance about including the correct wage rate order from the Dept. of Labor on both MoDOT and LPA projects.
- 09:30, 10 April 2018 diff hist -2 m 751.6 General Quantities →751.6.1 Index of Quantities
- 09:06, 10 April 2018 diff hist +189 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, added Open Cell Foam Joint System pay items
- 13:05, 9 April 2018 diff hist -193 m Main Page EPG 127.29.7
- 13:01, 9 April 2018 diff hist +695 127.29 Stormwater →127.29.7 MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment: Per Env'l, added guidance per permit agreement with MDNR.
- 14:36, 6 April 2018 diff hist 0 N File:Main Page Apr 6c, 2018.jpg current
- 14:36, 6 April 2018 diff hist 0 N File:Main Page Apr 6b, 2018.gif current
- 14:36, 6 April 2018 diff hist 0 Main Page
- 14:35, 6 April 2018 diff hist 0 N File:Main Page Apr 6a, 2018.jpg current
- 14:35, 6 April 2018 diff hist 0 N File:Main Page Apr 6, 2018.jpg current
- 14:34, 6 April 2018 diff hist +739 m Main Page
- 12:28, 6 April 2018 diff hist +16 m 320.4 Procedure for Final Sounding Per BR, updated Request for Final Soundings for Structures Form
- 12:27, 6 April 2018 diff hist +8 m 320.3 Drilling Operations Per BR, updated Request for Final Soundings for Structures Form
- 12:25, 6 April 2018 diff hist 0 N File:751.1.2.19 Guidance 2018.xlsx
- 12:24, 6 April 2018 diff hist -2 m 751.1 Preliminary Design Per BR, updated Request for Final Soundings for Structures Form and Guidance for Request for Final Soundings of Structures
- 12:21, 6 April 2018 diff hist 0 N File:751.1.2.20 Request Apr 2018.xlsx current
- 12:20, 6 April 2018 diff hist +4 m Category:101 Standard Forms Per BR, updated Request for Final Soundings for Structures Form
- 13:29, 5 April 2018 diff hist -93 m Main Page EPG 110.2
- 13:26, 5 April 2018 diff hist +1 Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, revised the bulletin board inspection rate from every two months to every three months.
- 09:37, 5 April 2018 diff hist +101 m Main Page EPG 749.5
- 09:07, 5 April 2018 diff hist +2,610 Category:749 Hydrologic Analysis Per BR, revised Time of Concentration equation guidance by providing optional combination of Kirby-Hathaway & Kirpich equations and adding the optional low slope factor presented in the new research.
- 15:26, 4 April 2018 diff hist +7 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 15:19, 4 April 2018 diff hist +53 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms: Per CADD, minor revisions to glossary terms
- 15:10, 4 April 2018 diff hist +12 m Category:747 Bridge Reports and Layouts Per BR, Bridge Survey Report further edited
- 15:09, 4 April 2018 diff hist +6 m 238.3 Route Surveying
- 15:08, 4 April 2018 diff hist +6 m Category:101 Standard Forms
- 15:07, 4 April 2018 diff hist 0 N File:747 Bridge Survey Report April 2018.docx current
- 15:07, 4 April 2018 diff hist +6 m Main Page
- 14:34, 4 April 2018 diff hist -311 m Main Page Bridge Survey Report
- 14:29, 4 April 2018 diff hist -41 m Category:101 Standard Forms →Bridge: Per BR, updated Bridge Survey Report
- 14:28, 4 April 2018 diff hist -42 m 238.3 Route Surveying Per BR, updated Bridge Survey Report
- 14:26, 4 April 2018 diff hist 0 N File:747 Bridge Survey Report 2018.docx current
- 14:25, 4 April 2018 diff hist -78 m Category:747 Bridge Reports and Layouts Per BR, updated Bridge Survey Report
- 12:55, 4 April 2018 diff hist +7 m 127.29 Stormwater →127.29.7 Post-Construction Stormwater Management in New Development and Redevelopment
- 10:17, 4 April 2018 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition
- 08:43, 4 April 2018 diff hist -93 m 751.50 Standard Detailing Notes Per BR, several minor clarifications
- 08:15, 4 April 2018 diff hist 0 N File:751.50 E3.2 boring.jpg current
- 12:53, 3 April 2018 diff hist -163 m Main Page EPG 237.13.5
- 12:49, 3 April 2018 diff hist -62 m 237.13 Contract Plan File Name Convention →237.13.5 Example Set of Electronic Design Data: Per CADD, updated the chart with current examples
- 11:23, 3 April 2018 diff hist -3 m Category:756 Seismic Design
- 11:21, 3 April 2018 diff hist -3 m Category:756 Seismic Design
- 11:20, 3 April 2018 diff hist +46 m Category:756 Seismic Design
- 11:18, 3 April 2018 diff hist +64 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, minor clarification
- 10:36, 3 April 2018 diff hist 0 m 237.14 Electronic Design Data Delivery (BIM Deliverables)
- 10:36, 3 April 2018 diff hist +353 m 237.14 Electronic Design Data Delivery (BIM Deliverables)
- 10:18, 3 April 2018 diff hist +3 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 10:14, 3 April 2018 diff hist +68 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 10:00, 3 April 2018 diff hist +1 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 12:08, 2 April 2018 diff hist 0 N File:Main Page Apr 2, 2018.jpg current
- 12:08, 2 April 2018 diff hist -208 m Main Page EPG 236.5.16
- 10:45, 2 April 2018 diff hist +672 m 236.5 Property Management →236.5.16 Legal Opinion of Title: Per RW, clarified the legal title of opinion for excess property appraised for $25,000 or less that include any references to RW in the acquisition deed.
- 09:49, 2 April 2018 diff hist +292 m Main Page EPG 616.8, EPG 616.27
- 09:33, 2 April 2018 diff hist +24 m 616.27 MoDOT Fleet Lighting
- 09:22, 2 April 2018 diff hist 0 N File:616.8.35d MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35c MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35b MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35a MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35 MT Apr 2018.pdf current
- 09:20, 2 April 2018 diff hist +20 m 616.8 Typical Applications (MUTCD 6H) Per TS, clarified light bar policy in TA-35 and TAs 35a-d by adding "SEE NOTE".
- 09:07, 2 April 2018 diff hist +494 m 616.27 MoDOT Fleet Lighting TS, updated light bar guidance to bring in line with TAs
- 13:33, 29 March 2018 diff hist +531 m LPA:136.13 LPA Policy Changes EPG 136.6.4.1
- 13:29, 29 March 2018 diff hist +463 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1 Section 106 (Cultural Resource) Compliance: Per Env'l, clarified procedures in Section 106 (Cultural Resource) Compliance
- 12:39, 29 March 2018 diff hist +316 m LPA:136.13 LPA Policy Changes EPG 136.11.5
- 12:37, 29 March 2018 diff hist -124 m LPA:136.11 Local Public Agency Construction →136.11.5 Subcontracts: Per CM, removed one archaic sentence of guidance about Form C-220
- 12:20, 28 March 2018 diff hist +38 m Main Page EPG 134
- 11:32, 28 March 2018 diff hist +617 m Category:134 Engineering Professional Services Per DE and ECR, DBE Concurrence may now be obtained electronically in eAgreements. Consultant Contract guidance was updated.
- 09:20, 28 March 2018 diff hist -51 m Main Page
- 15:19, 27 March 2018 diff hist 0 N File:Main Page Mar 27, 2018.jpg current
- 15:19, 27 March 2018 diff hist +93 m Main Page
- 13:28, 27 March 2018 diff hist -248 m Main Page EPG 751.2.2
- 13:25, 27 March 2018 diff hist +42 m 751.2 Loads
- 12:52, 27 March 2018 diff hist +12 m Main Page
- 12:51, 27 March 2018 diff hist +11 m Main Page EPG 402 and EPG 409
- 12:18, 27 March 2018 diff hist 0 N File:127.25.2.1 Hazardous 2018.docx current
- 12:18, 27 March 2018 diff hist +5 m 127.25 Maintenance Environmental Policies Per MT, updated ''Hazardous Materials Response Plan'' document
- 11:37, 27 March 2018 diff hist 0 N File:402 FY2019 Contract Leveling Coat Guidelines a.docx current
- 11:37, 27 March 2018 diff hist +2 m Category:402 Bituminous Surface Leveling
- 11:36, 27 March 2018 diff hist 0 N File:409 FY2019 Contract Seal Coat Guidelines a.docx current
- 11:36, 27 March 2018 diff hist +2 m Category:409 Seal Coat
- 11:28, 27 March 2018 diff hist 0 N File:409 FY2019 Contract Seal Coat Guidelines.docx current