User contributions
Jump to navigation
Jump to search
- 12:56, 25 May 2018 diff hist +14 m 413.1 Micro-Surfacing
- 12:31, 24 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 11:21, 24 May 2018 diff hist -66 m Main Page EPG 751.10.3.1
- 10:32, 24 May 2018 diff hist +4 m Category:625 Slab Stabilization Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:409 Seal Coat Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:402 Bituminous Surface Leveling Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:30, 24 May 2018 diff hist +4 m Category:401 Bituminous Base and Pavement Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:29, 24 May 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx
- 10:29, 24 May 2018 diff hist +4 m Category:403 Asphaltic Concrete Pavement
- 10:16, 24 May 2018 diff hist +409 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 10:09, 24 May 2018 diff hist -237 617.2 Construction Inspection Guidelines for Sec 617 Per CM and EPS, eliminated the specified 4 ft distance required between traffic barrier and stored material. Associated with request #842 (5/17/18)
- 09:55, 24 May 2018 diff hist +522 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, stated the allowed slab drain color coatings
- 15:04, 23 May 2018 diff hist +15 m Main Page
- 15:03, 23 May 2018 diff hist 0 N File:Main Page May 23, 2018.jpg current
- 15:02, 23 May 2018 diff hist -182 m Main Page
- 14:53, 22 May 2018 diff hist +1 m Main Page
- 11:14, 22 May 2018 diff hist +247 m Main Page EPG 106.12.1.1
- 11:12, 22 May 2018 diff hist -93 m 106.12 Pre-Acceptance Lists (PAL) →3) PAL Material Arrival Confirmation: Per CM, clarified Pre-Acceptance Identification Tag guidance to allow for identifying PAL material shipped to MoDOT projects.
- 10:45, 21 May 2018 diff hist 0 N File:121 Planning Framework 2018.docx current
- 10:45, 21 May 2018 diff hist +5 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, minor clarifications to "The Planning Framework for Transportation Decision Making"
- 13:50, 18 May 2018 diff hist 0 m Main Page
- 13:27, 18 May 2018 diff hist 0 N File:Main Page May 18, 2018.jpg current
- 13:26, 18 May 2018 diff hist +329 m Main Page
- 09:56, 18 May 2018 diff hist -10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, delayed correcting the sign number GO22-1 for Wet Paint Signs until later this year.
- 09:52, 18 May 2018 diff hist 0 N File:616.8.35a DECM 2018.pdf current
- 09:52, 18 May 2018 diff hist 0 N File:616.8.17a DECM 2018.pdf current
- 09:51, 18 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 15:44, 17 May 2018 diff hist +1 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM, updated contact name
- 15:23, 17 May 2018 diff hist +1 m Main Page
- 14:55, 17 May 2018 diff hist +35 m Main Page
- 14:54, 17 May 2018 diff hist +51 m 617.2 Construction Inspection Guidelines for Sec 617
- 14:51, 17 May 2018 diff hist +303 m Main Page EPG 616.19.2.5, EPG 617.2, EPG 806.7
- 14:47, 17 May 2018 diff hist 0 N File:806 Zone 3.jpg current
- 14:46, 17 May 2018 diff hist 0 N File:806 Zone 2.jpg current
- 14:46, 17 May 2018 diff hist 0 N File:806 Zone 1.jpg current
- 14:45, 17 May 2018 diff hist 0 N File:806 design guidance map.jpg current
- 14:43, 17 May 2018 diff hist +2,557 Category:806 Pollution, Erosion and Sediment Control →Temporary Erosion Control Blankets (Sec. 806.90): Per Env'l, the types of erosion control blankets were increased and guidance now includes a matrix for choosing blanket types
- 14:39, 17 May 2018 diff hist +3 750.6 Erosion Control and Energy Dissipation →750.6.3.4 Erosion Control Blankets and Turf Reinforcement Mats: Per Env'l, the types of erosion control blankets were increased
- 14:23, 17 May 2018 diff hist -730 617.2 Construction Inspection Guidelines for Sec 617 Per EPS, clarified guidance for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.
- 14:19, 17 May 2018 diff hist +11 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.5 Temporary Traffic Barriers: Per EPS, clarified guidance for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.
- 13:10, 14 May 2018 diff hist -34 m Main Page EPG 153.8
- 13:02, 14 May 2018 diff hist +21 m 153.9 Design
- 08:49, 14 May 2018 diff hist +882 m 153.9 Design Per DE, modified the reviewer column for DE43, DE44, DE46-49
- 12:05, 11 May 2018 diff hist -267 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, removed the associated numbers from the posters
- 12:03, 11 May 2018 diff hist +15 m Main Page
- 11:23, 11 May 2018 diff hist 0 N File:236.16 Vegetation Permit 2018.pdf current
- 11:23, 11 May 2018 diff hist 0 N File:236.16 Reject Vegetation Cover 2018.pdf current
- 11:22, 11 May 2018 diff hist -252 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated two correspondence forms
- 11:05, 11 May 2018 diff hist -2 m Main Page
- 10:41, 11 May 2018 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 10:39, 11 May 2018 diff hist +268 m Main Page EPG 110.2
- 10:30, 11 May 2018 diff hist +406 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, added three Federal Aid Projects posters
- 14:56, 10 May 2018 diff hist +22 m 751.14 Steel Superstructure →751.14.5.9 Weathering Steel
- 14:54, 10 May 2018 diff hist 0 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements
- 08:07, 10 May 2018 diff hist 0 N File:101 Floodplain Development Permit Application May 2018.pdf current
- 08:07, 10 May 2018 diff hist +4 m Category:101 Standard Forms Per BR, minor correction to Floodplain Development Permit Application
- 13:24, 9 May 2018 diff hist -1 m Category:110 State and Federal Wage Rates and Other Requirements
- 13:23, 9 May 2018 diff hist -1,251 m Main Page EPG 110.3.4
- 12:29, 9 May 2018 diff hist +920 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM, new guidance about the DOL's PW-2 form agreed to by DOL
- 08:48, 9 May 2018 diff hist -34 m Main Page EPG 231.4
- 08:46, 9 May 2018 diff hist +421 m 231.4 Shoulder Width →231.4.1 Introduction: Per DE, revised guidance about guardrail placement from the edge of the shoulder to bring guidance in line with Std Plan 606.00.
- 12:38, 7 May 2018 diff hist 0 m Main Page
- 11:16, 7 May 2018 diff hist 0 N File:Main Page May 7, 2018.jpg current
- 11:16, 7 May 2018 diff hist -35 m Main Page
- 08:17, 4 May 2018 diff hist +7 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.5 Electronic Information for Bidder’s Automation: Per Bidding and Contracts, minor correction
- 07:25, 4 May 2018 diff hist 0 N File:910 TSMO.pdf current
- 07:24, 4 May 2018 diff hist +43 m Category:910 Intelligent Transportation Systems Per TS, added TSM&O info
- 15:22, 3 May 2018 diff hist -1 m 751.1 Preliminary Design →751.1.3.9 Environmental Considerations: Asbestos, Lead and Recoating
- 13:36, 3 May 2018 diff hist +34 m Main Page
- 13:33, 3 May 2018 diff hist 0 N File:Main Page Apr 3, 2018.gif current
- 13:33, 3 May 2018 diff hist 0 N File:Main Page May 3a, 2018.jpg current
- 13:33, 3 May 2018 diff hist 0 N File:Main Page May 3b, 2018.jpg current
- 13:32, 3 May 2018 diff hist +752 m Main Page
- 10:51, 3 May 2018 diff hist +179 m Main Page EPG 751.1.3.9
- 10:30, 3 May 2018 diff hist +2,950 m 751.1 Preliminary Design Per BR, new bridge preliminary design guidance for how to assess asbestos and lead considerations for structure removal, rehabs and recoatings and how to address these considerations on Bridge Memo
- 11:16, 2 May 2018 diff hist -355 m Main Page EPG 237.14.3.6
- 07:33, 2 May 2018 diff hist +810 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.6 Electronic Design Data for MoDOT Construction: Per CADD, clarified guidance
- 12:06, 1 May 2018 diff hist +152 m 238.3 Route Surveying →238.3.36.3.3 Field Notebooks: Per BR, corrected error
- 11:17, 1 May 2018 diff hist -1 m Main Page
- 09:21, 1 May 2018 diff hist +150 m Category:747 Bridge Reports and Layouts
- 13:45, 30 April 2018 diff hist 0 m 751.36 Driven Piles →751.36.3 Design Procedure: Per BR, minor correction
- 13:39, 30 April 2018 diff hist -238 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated links
- 09:10, 30 April 2018 diff hist +346 m Main Page EPG 236.16
- 09:04, 30 April 2018 diff hist -2,351 m 236.16 Outdoor Advertising Per Outdoor Advertising, several revisions due to Administrative Rule Revisions
- 08:30, 30 April 2018 diff hist -7 m Category:747 Bridge Reports and Layouts →747.2.2.4 GEO Files for Stream Crossings: Per CADD, minor updates
- 11:24, 27 April 2018 diff hist -149 Main Page
- 11:19, 27 April 2018 diff hist 0 N File:Main Page Apr 27, 2018.jpg current
- 11:18, 27 April 2018 diff hist -116 m Main Page
- 10:29, 27 April 2018 diff hist +99 m 102.2 Contractor Performance Rating System →102.2.7 Performance Discussion: Per CM, guidance for when certified mail is necessary for the Contractor Performance Rating replaced older guidance.
- 13:34, 26 April 2018 diff hist -643 m Main Page
- 15:19, 25 April 2018 diff hist 0 N File:751.12.2.3 Non-integral 1 2018.jpg current
- 15:19, 25 April 2018 diff hist 0 N File:751.12.2.3 Integral 1 2018.jpg current
- 15:18, 25 April 2018 diff hist +10 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.3 End Bent Reinforcement: Per BR, corrected dimensions for K5-K8 bars placed in end bent wings and extending into bridge barrier.
- 14:30, 25 April 2018 diff hist -688 m Main Page EPG 751.50
- 14:27, 25 April 2018 diff hist +410 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, new std detailing note about deviations in galvanized pile penetration
- 08:40, 25 April 2018 diff hist -263 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.9 Lane Reduction Transition Markings (MUTCD Section 3B.09): Per TS, deleted Fig. 620.2.9.3 since Fig. 620.2.9.1 already covers Fig. 620.2.9.3's critical concepts.
- 08:27, 24 April 2018 diff hist +9 m Category:403 Asphaltic Concrete Pavement →403.1.18 Quality Assurance (Sec 403.18)
- 15:20, 23 April 2018 diff hist +1 m Main Page
- 09:12, 23 April 2018 diff hist +9 Category:1091 Lighting Equipment
- 09:11, 23 April 2018 diff hist -9 Category:1091 Lighting Equipment