User contributions
Jump to navigation
Jump to search
- 12:56, 25 May 2018 diff hist +14 m 413.1 Micro-Surfacing
- 12:31, 24 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 11:21, 24 May 2018 diff hist -66 m Main Page EPG 751.10.3.1
- 10:32, 24 May 2018 diff hist +4 m Category:625 Slab Stabilization Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:409 Seal Coat Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:402 Bituminous Surface Leveling Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:30, 24 May 2018 diff hist +4 m Category:401 Bituminous Base and Pavement Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:29, 24 May 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx
- 10:29, 24 May 2018 diff hist +4 m Category:403 Asphaltic Concrete Pavement
- 10:16, 24 May 2018 diff hist +409 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 10:09, 24 May 2018 diff hist -237 617.2 Construction Inspection Guidelines for Sec 617 Per CM and EPS, eliminated the specified 4 ft distance required between traffic barrier and stored material. Associated with request #842 (5/17/18)
- 09:55, 24 May 2018 diff hist +522 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, stated the allowed slab drain color coatings
- 15:04, 23 May 2018 diff hist +15 m Main Page
- 15:03, 23 May 2018 diff hist 0 N File:Main Page May 23, 2018.jpg current
- 15:02, 23 May 2018 diff hist -182 m Main Page
- 14:53, 22 May 2018 diff hist +1 m Main Page
- 11:14, 22 May 2018 diff hist +247 m Main Page EPG 106.12.1.1
- 11:12, 22 May 2018 diff hist -93 m 106.12 Pre-Acceptance Lists (PAL) →3) PAL Material Arrival Confirmation: Per CM, clarified Pre-Acceptance Identification Tag guidance to allow for identifying PAL material shipped to MoDOT projects.
- 10:45, 21 May 2018 diff hist 0 N File:121 Planning Framework 2018.docx current
- 10:45, 21 May 2018 diff hist +5 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, minor clarifications to "The Planning Framework for Transportation Decision Making"