User contributions
Jump to navigation
Jump to search
- 14:26, 6 June 2018 diff hist +2 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 14:25, 6 June 2018 diff hist 0 N File:D-12 June 6 2018.pdf current
- 14:25, 6 June 2018 diff hist +4 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 07:47, 6 June 2018 diff hist 0 m Main Page
- 13:57, 5 June 2018 diff hist +5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 13:57, 5 June 2018 diff hist +10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 13:56, 5 June 2018 diff hist +5 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 13:55, 5 June 2018 diff hist 0 N File:D-12 June 2018.pdf current
- 13:55, 5 June 2018 diff hist +10 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 13:31, 5 June 2018 diff hist -5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, updated D-12
- 13:30, 5 June 2018 diff hist -10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, updated D-12
- 13:28, 5 June 2018 diff hist -5 m Category:101 Standard Forms Per Bidding and Est'g, updated D-12
- 13:27, 5 June 2018 diff hist 0 N File:D-12 2018.pdf current
- 13:27, 5 June 2018 diff hist -2 m 237.9 Submission of Plans and Supporting Documents
- 13:26, 5 June 2018 diff hist -8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated D-12
- 10:41, 5 June 2018 diff hist -239 m Main Page EPG 751.11.2.1
- 10:33, 5 June 2018 diff hist +428 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.
- 15:17, 1 June 2018 diff hist +4 m Main Page
- 11:21, 1 June 2018 diff hist +1 m 751.50 Standard Detailing Notes →B3a. Bridges
- 10:47, 1 June 2018 diff hist +2 Main Page
- 10:46, 1 June 2018 diff hist -409 m Main Page EPG 751.50
- 10:43, 1 June 2018 diff hist +28 m 751.50 Standard Detailing Notes Per BR, updated Note B3.2
- 12:20, 31 May 2018 diff hist +7 m Main Page
- 12:06, 31 May 2018 diff hist -534 m Category:109 Measurement and Payment →109.7.1 Payment Estimates: Per CM, the Electronics Documentation Choice Request Form is now obsolete since all projects have the eConstruction JSP, which disallows the use of paper submittals.
- 09:43, 31 May 2018 diff hist -145 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, removed redundant #10 (was same as #9b) and renumbered following points
- 12:11, 30 May 2018 diff hist 0 m Category:109 Measurement and Payment →109.13 Prompt Payment to Subcontractors and Suppliers (for Sec 109.13): Per CM and ECR, pay period corrected to 15 days per Sec 109.13 and State Statue 34.057
- 10:47, 30 May 2018 diff hist 0 m 903.14 Memorial Signs →903.15.2 Memorial Highway and Bridge Program (M18-1, M18-2) (MUTCD Section 2M.10): Per TS, updated contact number
- 10:22, 30 May 2018 diff hist 0 N File:616.26 2018.jpg current
- 10:21, 30 May 2018 diff hist 0 m 616.26 Work Zone User Training current
- 10:17, 30 May 2018 diff hist +287 m 616.26 Work Zone User Training Per TS, updated links to training manuals
- 12:56, 25 May 2018 diff hist +14 m 413.1 Micro-Surfacing
- 12:31, 24 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 11:21, 24 May 2018 diff hist -66 m Main Page EPG 751.10.3.1
- 10:32, 24 May 2018 diff hist +4 m Category:625 Slab Stabilization Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:409 Seal Coat Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:402 Bituminous Surface Leveling Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:30, 24 May 2018 diff hist +4 m Category:401 Bituminous Base and Pavement Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:29, 24 May 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx
- 10:29, 24 May 2018 diff hist +4 m Category:403 Asphaltic Concrete Pavement
- 10:16, 24 May 2018 diff hist +409 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 10:09, 24 May 2018 diff hist -237 617.2 Construction Inspection Guidelines for Sec 617 Per CM and EPS, eliminated the specified 4 ft distance required between traffic barrier and stored material. Associated with request #842 (5/17/18)
- 09:55, 24 May 2018 diff hist +522 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, stated the allowed slab drain color coatings
- 15:04, 23 May 2018 diff hist +15 m Main Page
- 15:03, 23 May 2018 diff hist 0 N File:Main Page May 23, 2018.jpg current
- 15:02, 23 May 2018 diff hist -182 m Main Page
- 14:53, 22 May 2018 diff hist +1 m Main Page
- 11:14, 22 May 2018 diff hist +247 m Main Page EPG 106.12.1.1
- 11:12, 22 May 2018 diff hist -93 m 106.12 Pre-Acceptance Lists (PAL) →3) PAL Material Arrival Confirmation: Per CM, clarified Pre-Acceptance Identification Tag guidance to allow for identifying PAL material shipped to MoDOT projects.
- 10:45, 21 May 2018 diff hist 0 N File:121 Planning Framework 2018.docx current
- 10:45, 21 May 2018 diff hist +5 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, minor clarifications to "The Planning Framework for Transportation Decision Making"