User contributions
Jump to navigation
Jump to search
- 08:43, 21 June 2018 diff hist +12 m Category:101 Standard Forms →Construction and Materials: Per CM, retitled all of the On-Call spreadsheets to begin with JOC. Updated their links. Added new Microsurfacing JOC.
- 12:42, 19 June 2018 diff hist -6 m 606.1 Guardrail →606.1.3.5.1 Closures of Existing Streets and Roads: Per TS, with the help of the WZQC, EPG 606.1.3.5 had minor clarifications to reflect the current practices at MoDOT.
- 12:40, 19 June 2018 diff hist 0 N File:616.8.8a MT 2018.pdf current
- 12:39, 19 June 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H)
- 12:37, 19 June 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, with the help of the WZQC, EPG 606.1.3.5 had minor clarifications to reflect the current practices at MoDOT. A reference to EPG 606.1.3.5 was added to TA-8a.
- 11:14, 15 June 2018 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added On-Call Lighting Repair Job Order
- 09:16, 15 June 2018 diff hist +22 m 236.7 Negotiation →236.7.6.3 Acquisition Procedure: updated link
- 09:15, 15 June 2018 diff hist -54 m 236.4 Description Writing and Titles →236.4.4.8 Obtaining Title Insurance: Per RW, clarified EPG 236.4.4.8 Obtaining Title Insurance with guidance reflecting current title commitment business practices.
- 08:21, 15 June 2018 diff hist -2 m Main Page
- 08:13, 14 June 2018 diff hist +47 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, added pay item
- 15:10, 13 June 2018 diff hist +98 m Category:751 LRFD Bridge Design Guidelines Per BR, guidance about specs for designing retaining walls to long-established current standards
- 09:17, 13 June 2018 diff hist +81 m Category:751 LRFD Bridge Design Guidelines Per BR, updated link to report
- 13:22, 11 June 2018 diff hist +197 m Category:321 Geotechnical Engineering Per Geotech, updated some FHWA reference documents
- 09:52, 11 June 2018 diff hist -62 m 127.28 Planning and Environmental Linkages (PEL) and the National Environmental Policy Act (NEPA) Per TP, updated Long-Range Plan link
- 09:49, 11 June 2018 diff hist -14 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, updated Long-Range Plan links
- 12:13, 7 June 2018 diff hist 0 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.3 Quantity Sheet Procedure (Column Headings): corrected link
- 11:27, 7 June 2018 diff hist +266 m 616.22 Advanced Work Zone Training Per WZQC, updated training link
- 11:25, 7 June 2018 diff hist +107 m 616.21 Work Zone Technician Training Per WZQC, updated training link
- 14:27, 6 June 2018 diff hist +2 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 14:27, 6 June 2018 diff hist +4 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 14:26, 6 June 2018 diff hist +2 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 14:25, 6 June 2018 diff hist 0 N File:D-12 June 6 2018.pdf current
- 14:25, 6 June 2018 diff hist +4 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 07:47, 6 June 2018 diff hist 0 m Main Page
- 13:57, 5 June 2018 diff hist +5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 13:57, 5 June 2018 diff hist +10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 13:56, 5 June 2018 diff hist +5 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 13:55, 5 June 2018 diff hist 0 N File:D-12 June 2018.pdf current
- 13:55, 5 June 2018 diff hist +10 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 13:31, 5 June 2018 diff hist -5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, updated D-12
- 13:30, 5 June 2018 diff hist -10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, updated D-12
- 13:28, 5 June 2018 diff hist -5 m Category:101 Standard Forms Per Bidding and Est'g, updated D-12
- 13:27, 5 June 2018 diff hist 0 N File:D-12 2018.pdf current
- 13:27, 5 June 2018 diff hist -2 m 237.9 Submission of Plans and Supporting Documents
- 13:26, 5 June 2018 diff hist -8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated D-12
- 10:41, 5 June 2018 diff hist -239 m Main Page EPG 751.11.2.1
- 10:33, 5 June 2018 diff hist +428 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.
- 15:17, 1 June 2018 diff hist +4 m Main Page
- 11:21, 1 June 2018 diff hist +1 m 751.50 Standard Detailing Notes →B3a. Bridges
- 10:47, 1 June 2018 diff hist +2 Main Page
- 10:46, 1 June 2018 diff hist -409 m Main Page EPG 751.50
- 10:43, 1 June 2018 diff hist +28 m 751.50 Standard Detailing Notes Per BR, updated Note B3.2
- 12:20, 31 May 2018 diff hist +7 m Main Page
- 12:06, 31 May 2018 diff hist -534 m Category:109 Measurement and Payment →109.7.1 Payment Estimates: Per CM, the Electronics Documentation Choice Request Form is now obsolete since all projects have the eConstruction JSP, which disallows the use of paper submittals.
- 09:43, 31 May 2018 diff hist -145 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, removed redundant #10 (was same as #9b) and renumbered following points
- 12:11, 30 May 2018 diff hist 0 m Category:109 Measurement and Payment →109.13 Prompt Payment to Subcontractors and Suppliers (for Sec 109.13): Per CM and ECR, pay period corrected to 15 days per Sec 109.13 and State Statue 34.057
- 10:47, 30 May 2018 diff hist 0 m 903.14 Memorial Signs →903.15.2 Memorial Highway and Bridge Program (M18-1, M18-2) (MUTCD Section 2M.10): Per TS, updated contact number
- 10:22, 30 May 2018 diff hist 0 N File:616.26 2018.jpg current
- 10:21, 30 May 2018 diff hist 0 m 616.26 Work Zone User Training current
- 10:17, 30 May 2018 diff hist +287 m 616.26 Work Zone User Training Per TS, updated links to training manuals
- 12:56, 25 May 2018 diff hist +14 m 413.1 Micro-Surfacing
- 12:31, 24 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 11:21, 24 May 2018 diff hist -66 m Main Page EPG 751.10.3.1
- 10:32, 24 May 2018 diff hist +4 m Category:625 Slab Stabilization Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:409 Seal Coat Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:402 Bituminous Surface Leveling Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:30, 24 May 2018 diff hist +4 m Category:401 Bituminous Base and Pavement Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:29, 24 May 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx
- 10:29, 24 May 2018 diff hist +4 m Category:403 Asphaltic Concrete Pavement
- 10:16, 24 May 2018 diff hist +409 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 10:09, 24 May 2018 diff hist -237 617.2 Construction Inspection Guidelines for Sec 617 Per CM and EPS, eliminated the specified 4 ft distance required between traffic barrier and stored material. Associated with request #842 (5/17/18)
- 09:55, 24 May 2018 diff hist +522 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, stated the allowed slab drain color coatings
- 15:04, 23 May 2018 diff hist +15 m Main Page
- 15:03, 23 May 2018 diff hist 0 N File:Main Page May 23, 2018.jpg current
- 15:02, 23 May 2018 diff hist -182 m Main Page
- 14:53, 22 May 2018 diff hist +1 m Main Page
- 11:14, 22 May 2018 diff hist +247 m Main Page EPG 106.12.1.1
- 11:12, 22 May 2018 diff hist -93 m 106.12 Pre-Acceptance Lists (PAL) →3) PAL Material Arrival Confirmation: Per CM, clarified Pre-Acceptance Identification Tag guidance to allow for identifying PAL material shipped to MoDOT projects.
- 10:45, 21 May 2018 diff hist 0 N File:121 Planning Framework 2018.docx current
- 10:45, 21 May 2018 diff hist +5 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, minor clarifications to "The Planning Framework for Transportation Decision Making"
- 13:50, 18 May 2018 diff hist 0 m Main Page
- 13:27, 18 May 2018 diff hist 0 N File:Main Page May 18, 2018.jpg current
- 13:26, 18 May 2018 diff hist +329 m Main Page
- 09:56, 18 May 2018 diff hist -10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, delayed correcting the sign number GO22-1 for Wet Paint Signs until later this year.
- 09:52, 18 May 2018 diff hist 0 N File:616.8.35a DECM 2018.pdf current
- 09:52, 18 May 2018 diff hist 0 N File:616.8.17a DECM 2018.pdf current
- 09:51, 18 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 15:44, 17 May 2018 diff hist +1 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM, updated contact name
- 15:23, 17 May 2018 diff hist +1 m Main Page
- 14:55, 17 May 2018 diff hist +35 m Main Page
- 14:54, 17 May 2018 diff hist +51 m 617.2 Construction Inspection Guidelines for Sec 617
- 14:51, 17 May 2018 diff hist +303 m Main Page EPG 616.19.2.5, EPG 617.2, EPG 806.7
- 14:47, 17 May 2018 diff hist 0 N File:806 Zone 3.jpg current
- 14:46, 17 May 2018 diff hist 0 N File:806 Zone 2.jpg current
- 14:46, 17 May 2018 diff hist 0 N File:806 Zone 1.jpg current
- 14:45, 17 May 2018 diff hist 0 N File:806 design guidance map.jpg current
- 14:43, 17 May 2018 diff hist +2,557 Category:806 Pollution, Erosion and Sediment Control →Temporary Erosion Control Blankets (Sec. 806.90): Per Env'l, the types of erosion control blankets were increased and guidance now includes a matrix for choosing blanket types
- 14:39, 17 May 2018 diff hist +3 750.6 Erosion Control and Energy Dissipation →750.6.3.4 Erosion Control Blankets and Turf Reinforcement Mats: Per Env'l, the types of erosion control blankets were increased
- 14:23, 17 May 2018 diff hist -730 617.2 Construction Inspection Guidelines for Sec 617 Per EPS, clarified guidance for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.
- 14:19, 17 May 2018 diff hist +11 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.5 Temporary Traffic Barriers: Per EPS, clarified guidance for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.
- 13:10, 14 May 2018 diff hist -34 m Main Page EPG 153.8
- 13:02, 14 May 2018 diff hist +21 m 153.9 Design
- 08:49, 14 May 2018 diff hist +882 m 153.9 Design Per DE, modified the reviewer column for DE43, DE44, DE46-49
- 12:05, 11 May 2018 diff hist -267 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, removed the associated numbers from the posters
- 12:03, 11 May 2018 diff hist +15 m Main Page
- 11:23, 11 May 2018 diff hist 0 N File:236.16 Vegetation Permit 2018.pdf current
- 11:23, 11 May 2018 diff hist 0 N File:236.16 Reject Vegetation Cover 2018.pdf current
- 11:22, 11 May 2018 diff hist -252 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated two correspondence forms
- 11:05, 11 May 2018 diff hist -2 m Main Page
- 10:41, 11 May 2018 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters