User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:51, 4 February 2015 diff hist +39 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Clarified that guardrail height is measured to the top of the beam.
- 14:48, 5 September 2014 diff hist -11 m 750.7 Non-Hydraulic Considerations →750.7.2 Types: Clarified the parameters of Type C pipe use in the 'Permissible Pipe Types by Group' table.
- 14:54, 29 August 2014 diff hist -304 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Clarified guardrail considerations for 1R, 2R, 3R, and 4R work.
- 10:43, 19 August 2014 diff hist -2 141.1 Cost Share Program
- 10:42, 19 August 2014 diff hist -83 m 141.1 Cost Share Program Clarified the intent of the sidebar concerning the Commission's suspension of the Cost Share Program.
- 11:06, 18 August 2014 diff hist 0 m 141.1 Cost Share Program Added color to notice to increase target value
- 13:19, 21 July 2014 diff hist +384 m 131.1 Design Exception Process →131.1.5.1 Safety related features: Clarified intent of HSM analysis.
- 13:23, 11 July 2014 diff hist 0 N File:409 JSP FY15.doc current
- 13:23, 11 July 2014 diff hist -3 Category:409 Seal Coat
- 13:17, 11 July 2014 diff hist 0 N File:409 SEAL COAT MODOT STRIPING.pdf
- 13:17, 11 July 2014 diff hist 0 N File:409 JSP 07 2014.doc current
- 13:17, 11 July 2014 diff hist 0 N File:409 FY2015 Contract Seal Coat Guidelines.pdf
- 13:16, 11 July 2014 diff hist -4 Category:409 Seal Coat
- 13:09, 11 July 2014 diff hist 0 N File:402 FY2015 Contract Leveling Course Guidelines.pdf
- 13:07, 11 July 2014 diff hist 0 N File:402 CLC MODOT STRIPE.pdf
- 13:06, 11 July 2014 diff hist 0 N File:402 CLC CONTRACTOR STRIPE.pdf
- 13:06, 11 July 2014 diff hist -175 Category:402 Bituminous Surface Leveling
- 13:02, 11 July 2014 diff hist 0 N File:402 JSP FY15.doc current
- 14:45, 9 July 2014 diff hist -5 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) minor clarifications
- 13:08, 25 March 2014 diff hist +125 m 606.2 Guard Cable →606.2.7 Construction Inspection Guidelines for Guard Cable: Clarified policy on 4:1 approved systems.