User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:09, 9 August 2010 diff hist +56 m LPA:136.6 Environmental and Cultural Requirements updated links
- 10:06, 9 August 2010 diff hist +52 m 127.22 Off-Site Borrow, Spoil, and Staging Areas updated links
- 10:05, 9 August 2010 diff hist +14 m 127.16 Wetland and Stream Mitigation →127.16.2 Design: updated link
- 10:04, 9 August 2010 diff hist +14 m 127.23 Negotiated Commitments and Mitigation in the National Environmental Policy Act (NEPA) Process →127.23.2 Project Development and Commitments: updated link
- 10:03, 9 August 2010 diff hist +14 m 127.10 Section 4(f) Public Lands →127.10.2.1.1 Section 4(f) Properties: updated link
- 10:02, 9 August 2010 diff hist +14 m LPA:136.8 Local Public Agency Land Acquisition →236.18.2.2 Pre-Acquisition Requirements With Federal Funds Participation in Any Part of The Project (Right of Way or Construction): updated link
- 10:01, 9 August 2010 diff hist +56 m 127.2 Historic Preservation and Cultural Resources updated links
- 09:57, 9 August 2010 diff hist +14 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →203.2.3.1.2 Borrow or Excess Material: updated link
- 09:56, 9 August 2010 diff hist +14 m Category:107 Legal Relations and Responsibility to the Public →107.10.4 Contractor Borrow Sites: Updated link
- 09:54, 9 August 2010 diff hist -847 m Category:135 Public Relations for Construction Activities Moved info to other articles, per CM current
- 09:51, 9 August 2010 diff hist -21 m Category:100 GENERAL Replaced EPG 135 with new EPG 136 The Section 106 Process. Old EPG 135 had been previously moved by CM to other articles in June
- 09:48, 9 August 2010 diff hist +15,797 N Category:135 The Section 106 Process Moved info from EPG The Section 106 Process to EPG 135. Old article had no significant history since Oct 2006; 1652 hits.
- 15:13, 6 August 2010 diff hist +2,105 m Category:470 Bituminous Asphalt Maintenance Moved five Maintc Planning Guidelines to this article (all from Jan 2008, no appreciable history and hits from 803 to 1739)
- 14:22, 6 August 2010 diff hist +77 m Category:134 Engineering Professional Services →134.3.6 Consultant Selection and Contract Administration Summary: inserted link
- 14:20, 6 August 2010 diff hist +50 m Category:134 Engineering Professional Services →134.3.2.7.3 Restitution for Errors and Omissions: updated link
- 13:55, 6 August 2010 diff hist 0 N File:Main Page Aug 6, 2010.jpg current
- 13:55, 6 August 2010 diff hist -25 m Main Page updated photo
- 13:37, 6 August 2010 diff hist +52 m Category:134 Engineering Professional Services minor link update
- 13:36, 6 August 2010 diff hist -103,666 m Engineering Professional Services Guidelines Moved info to EPG 134. No major policy changes since established in 2006. 19120 hits.
- 13:31, 6 August 2010 diff hist +103,793 m Category:134 Engineering Professional Services Moved EPG Engineering Professional Services Guidelines (no major changes since 2007; 19120 hits) into this article