User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:00, 23 August 2010 diff hist 0 N File:136.14 D1 Transportation Enhancements 2010.doc current
- 10:59, 23 August 2010 diff hist -14 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.1 Local Programs: Updated D1 Transportation Enhancements document, per D1 Planning
- 10:15, 23 August 2010 diff hist -15 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR, updated link to Affidavit for Compliance with Prevailing Wage Law.
- 09:52, 23 August 2010 diff hist 0 N File:236.5 Categorical Exclusion Review (Form 3-1.2).doc current
- 09:51, 23 August 2010 diff hist +876 m 236.5 Property Management Per RW, EPG 236.5.1 and 236.5.18 clarified to include longstanding guidance not previously in the EPG. Categorical Exclusion Form (Form 3-1.2) updated.
- 12:49, 20 August 2010 diff hist +12 m 642.8 Sidewalk Design Criteria minor clarification
- 08:29, 20 August 2010 diff hist -123 m Category:806 Pollution, Erosion and Sediment Control →Temporary Ditch and Inlet Checks (Sec. 806.30): Per Environmental & CM, guidance clarified to bring it into compliance with specs. All Type II ditch checks don't have "flaps" to prevent erosion.
- 15:43, 19 August 2010 diff hist +2,198 m Category:105 Control of Work →105.9.3 Daily Work Reports: Clarification, per CM, of the role of the RE Diary and other diaries
- 15:20, 19 August 2010 diff hist +25 m Category:310 Aggregate Surface →310.1.5.3 Measurement by Weight (Mass): updated link
- 11:35, 19 August 2010 diff hist 0 903.7 Conventional Road Guide Signs →903.7.33 Destination and/or Distance Signs (MUTCD Section 2D.33)
- 11:31, 19 August 2010 diff hist +26 m 903.2 Extent of Signing →903.1.18 Sign Colors (MUTCD Section 2A.11): updated link
- 11:22, 19 August 2010 diff hist -93 m Category:800 ROADSIDE DEVELOPMENT removed link to Blue Star Markers, EPG 903.7.77
- 13:09, 18 August 2010 diff hist +6 m Category:304 Aggregate Base Course →304.2.3.4 Sampling: Further clarification about sampling, per CM
- 12:05, 18 August 2010 diff hist +110 m Category:304 Aggregate Base Course →304.2.3.4 Sampling: Further clarification about sampling, per CM
- 10:09, 18 August 2010 diff hist -1 m Category:239 Construction Inspection Guidelines for Final Plans →239.21.1 Resident Engineer's Office: minor correction
- 10:08, 18 August 2010 diff hist +147 m Category:239 Construction Inspection Guidelines for Final Plans →239.21.1 Resident Engineer's Office: Per CM, replaced reference to archaic Pay Doc Manual with one to the Bid Items list
- 15:08, 17 August 2010 diff hist +156 m 233.3 Roundabouts link to FHWA roundabout video added
- 10:44, 17 August 2010 diff hist +8 m 236.7 Negotiation →236.7.2.4 Offer Letter and Supporting Documentation: minor clarification
- 09:25, 17 August 2010 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators (Form 7-8.2) Aug 17 2010.pdf
- 09:24, 17 August 2010 diff hist -7 m 236.7 Negotiation Per RW, Roster of Approved Contract Negotiators updated