User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:44, 12 April 2019 diff hist -58 m Category:1011 Geotextile updated pre-qualified list link
- 08:35, 12 April 2019 diff hist -30 m Category:1017 Slag Cement updated pre-qualified list link
- 08:33, 12 April 2019 diff hist -59 m Category:1018 Fly Ash for Concrete updated pre-qualified list link
- 08:31, 12 April 2019 diff hist -90 m Category:1019 Cement updated pre-qualified list links
- 08:27, 12 April 2019 diff hist -359 m Category:1020 Corrugated Metallic-Coated Steel Culvert Pipe, Pipe-Arches and End Sections updated several pre-qualified list links
- 14:49, 11 April 2019 diff hist +80 m 236.16 Outdoor Advertising Per OA, added a link for Vegetation Brochure from the OA website.
- 13:51, 11 April 2019 diff hist -272 m Main Page EPG 106.3.2.90
- 13:50, 11 April 2019 diff hist +9,526 N 106.3.2.90, Determination of Chemical Components in Asphalt and Non-Asphalt Rejuvenators Per CM, new test method to determine chemical components in asphalt and non-asphalt rejuvenators current
- 14:50, 10 April 2019 diff hist 0 File:Fig. 806.8.14.docx Smithk uploaded a new version of File:Fig. 806.8.14.docx current
- 13:42, 10 April 2019 diff hist -2 m 106.3.2.89 TM-89 Determination of Aluminum Oxide in High Friction Surface Treatments (HFST) current
- 13:34, 10 April 2019 diff hist +250 m Main Page EPG 106.3.2.89
- 09:58, 10 April 2019 diff hist -3 m 106.3.2.89 TM-89 Determination of Aluminum Oxide in High Friction Surface Treatments (HFST) Per CM, new test method to determine aluminum oxide in High Friction Surface Treatments
- 09:48, 10 April 2019 diff hist +4 106.3.2.89 TM-89 Determination of Aluminum Oxide in High Friction Surface Treatments (HFST)
- 09:28, 10 April 2019 diff hist +4,398 N 106.3.2.89 TM-89 Determination of Aluminum Oxide in High Friction Surface Treatments (HFST) Created page with "'''Scope.''' This method tests High Friction Surface Treatments (HFST) by analytical and instrumental analysis to determine Al<sub>2</sub>O<sub>3</sub> by difference...."
- 15:06, 9 April 2019 diff hist +210 m Category:143 Practical Design →143.2.4 Roadside Hardware: Per EPS, for readers' convenience, added a reference and link to EPG 606.1 to help readers find guardrail installment height info
- 12:09, 5 April 2019 diff hist +15 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Delayed revisions to Figs. 616.6.87.1 and .2 until later in April.
- 12:06, 5 April 2019 diff hist -423 m Main Page
- 11:08, 5 April 2019 diff hist +231 m Main Page EPG 236.13.13, EPG 616.6.87
- 10:51, 5 April 2019 diff hist -1 236.13 Designing Right of Way Plans →236.13.13 Plan Submittal and Filing
- 10:48, 5 April 2019 diff hist 0 m 236.13 Designing Right of Way Plans →236.13.13 Plan Submittal and Filing