User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:45, 15 March 2019 diff hist -9 m Category:152 Contactor Bonding Responsibilities Per Cm, updated Bond PowerPoint/pdf
- 12:44, 15 March 2019 diff hist 0 File:152.pdf Smithk uploaded a new version of File:152.pdf current
- 08:16, 15 March 2019 diff hist 0 N File:152.pdf
- 08:16, 15 March 2019 diff hist -11 m Category:152 Contactor Bonding Responsibilities
- 08:13, 15 March 2019 diff hist -1 m Category:152 Contactor Bonding Responsibilities
- 08:13, 15 March 2019 diff hist +258 m Category:152 Contactor Bonding Responsibilities Per CM, added PowerPoint tutorial for contract bonds
- 11:01, 14 March 2019 diff hist -360 m Main Page EPG 910.3
- 10:57, 14 March 2019 diff hist -11,611 m 910.3 Dynamic Message Signs (DMS) Per TS, updated guidance. References new types of DMSs.
- 07:48, 13 March 2019 diff hist -265 m 234.6 Diverging Diamond Interchanges →234.6.6 Public Involvement: removed archaic video
- 07:45, 13 March 2019 diff hist +1 m 234.6 Diverging Diamond Interchanges →234.6.2.1.1 Modeling/Simulation
- 07:16, 13 March 2019 diff hist -10 m 234.6 Diverging Diamond Interchanges
- 15:20, 12 March 2019 diff hist +34 m Main Page
- 13:16, 12 March 2019 diff hist -7 m Main Page EPG 750.7
- 13:13, 12 March 2019 diff hist +15 m 750.7 Non-Hydraulic Considerations →750.7.3.1 Embedment Requirements
- 13:11, 12 March 2019 diff hist +4 750.7 Non-Hydraulic Considerations →750.7.3.1 Embedment Requirements
- 13:11, 12 March 2019 diff hist +157 m 750.7 Non-Hydraulic Considerations →750.7.3.1 Embedment Requirements: Per Env'l, added minor note stating the COE must validate whether a stream is "ephemeral"
- 10:00, 11 March 2019 diff hist 0 File:751.22.3.10.7.jpg Smithk uploaded a new version of File:751.22.3.10.7.jpg current
- 08:49, 11 March 2019 diff hist 0 N File:121.5.1.1.1 current.pdf
- 08:48, 11 March 2019 diff hist +306 m 121.5 Asset Management Per TP, uploaded the document, "Current Asset Management Plan Summary"
- 15:42, 8 March 2019 diff hist -3 m LPA:136.3 Federal Aid Basics →136.3.8.11.2 Purpose
- 14:07, 8 March 2019 diff hist 0 File:Job Order Contracts Oct 2012.docx Smithk uploaded a new version of File:Job Order Contracts Oct 2012.docx current
- 14:06, 8 March 2019 diff hist 0 File:Job Order Contracts July 2012.docx Smithk uploaded a new version of File:Job Order Contracts July 2012.docx current
- 14:05, 8 March 2019 diff hist 0 File:Job Order Contracts Aug 2012.docx Smithk uploaded a new version of File:Job Order Contracts Aug 2012.docx current
- 14:04, 8 March 2019 diff hist 0 File:Job Order Contracts.docx Smithk uploaded a new version of File:Job Order Contracts.docx current
- 14:03, 8 March 2019 diff hist 0 File:How to Use Cognos Reports.docx Smithk uploaded a new version of File:How to Use Cognos Reports.docx current
- 11:42, 8 March 2019 diff hist +47 m 646.3 Private Underpasses updated link current
- 12:16, 7 March 2019 diff hist -300 m Category:1015 Bituminous Material updated numerous approved products links
- 11:17, 7 March 2019 diff hist +72 m 236.6 Appraisal and Appraisal Review →236.6.1.4 Employment of Retirees: updated link
- 11:15, 7 March 2019 diff hist +70 m 236.6 Appraisal and Appraisal Review →236.6.1.3 Moonlighting: updated link
- 10:52, 7 March 2019 diff hist +2 m Category:600 INCIDENTAL CONSTRUCTION current
- 10:03, 7 March 2019 diff hist +192 m Category:601 Field Laboratories →Equipment Verification Samples (Sec 601.2.2.1): Per CM, added a clarifying sentence with a link to the QRG for Equipment Verification Samples
- 14:44, 6 March 2019 diff hist +133 m Main Page EPG 236.7.2.3
- 14:37, 6 March 2019 diff hist +230 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, clarified guidance to allow minimum offer to be reduced if approved by Asst. to State Design Engineer – RW
- 11:40, 6 March 2019 diff hist -4 m Category:173 Erosion Control for Maintenance Operations →173.5.2 Project Name: Spring Creek Bridge Repair
- 10:03, 6 March 2019 diff hist -3 m Category:1180 Bituminous Stockpile Patching Material
- 10:03, 6 March 2019 diff hist +3 m Category:1180 Bituminous Stockpile Patching Material
- 11:48, 5 March 2019 diff hist +257 m Category:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches updated links to std plans
- 16:14, 1 March 2019 diff hist -21 m Main Page EPG 616.16.1
- 16:09, 1 March 2019 diff hist -180 m 616.16 Law Enforcement Services Per TS, updated guidelines to reflect a more standardized process throughout the state.
- 14:19, 1 March 2019 diff hist +47 m Main Page EPG 236.16
- 14:01, 1 March 2019 diff hist -241 m 236.16 Outdoor Advertising Per RW, updated several ODA policies
- 13:08, 1 March 2019 diff hist -31 m Category:109 Measurement and Payment Per CM, minor update to EPG guidance to reflect re-numbering of Sec 109.
- 16:01, 27 February 2019 diff hist -93 m Main Page EPG 121.5
- 15:58, 27 February 2019 diff hist 0 N File:121.5.5 needs.pdf current
- 15:57, 27 February 2019 diff hist 0 N File:121.5.5.jpg current
- 15:57, 27 February 2019 diff hist 0 N File:121.5.4.pdf current
- 15:56, 27 February 2019 diff hist 0 N File:121.5.3 lifecycle.jpg current
- 15:56, 27 February 2019 diff hist 0 N File:121.5.3 satisfaction.jpg current
- 15:55, 27 February 2019 diff hist 0 N File:121.5.1.2.2.jpg current
- 15:55, 27 February 2019 diff hist 0 N File:121.5.1.2.1.jpg current