- 10:48, 5 April 2019 diff hist +108 m 236.13 Designing Right of Way Plans →236.13.13 Plan Submittal and Filing: Per RW, updated guidance to reflect current Commision Policy
- 11:01, 4 April 2019 diff hist 0 N File:Fig 616.6.87.2.pdf current
- 11:01, 4 April 2019 diff hist -15 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per TS, increased the spacing between the long-term rumble strips from "2 to 4 feet" to "10 to 12 feet" in Figs. 616.6.87.1 and .2 for a greater area of effectiveness.
- 10:53, 4 April 2019 diff hist 0 File:Fig 616.6.87.1.pdf Smithk uploaded a new version of File:Fig 616.6.87.1.pdf current
- 12:08, 3 April 2019 diff hist -33 m Category:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches updated link to Std. Plan 608.50 current
- 12:05, 3 April 2019 diff hist 0 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria
- 12:04, 3 April 2019 diff hist 0 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria updated link to Std. Plan 608.50
- 13:57, 1 April 2019 diff hist 0 File:101 Storm Water Database Initial Setup QRG.pdf Smithk uploaded a new version of File:101 Storm Water Database Initial Setup QRG.pdf current
- 12:09, 1 April 2019 diff hist -31 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention: Per CM, updated some naming convention examples
- 15:09, 29 March 2019 diff hist +98 m 236.16 Outdoor Advertising Per RW, updated the Application for Outdoor Advertising Vegetation Permit link
- 14:49, 29 March 2019 diff hist 0 File:751.1.2.20 Request.xlsx Smithk uploaded a new version of File:751.1.2.20 Request.xlsx current
- 07:03, 29 March 2019 diff hist -15 m 141.1 Cost Share Program →141.1.3 Application Process: Updated Cost Share Program application link current
- 15:13, 27 March 2019 diff hist +710 m Category:101 Standard Forms →Construction and Materials: Per CM, returned 5 updated AC Index Price Adjustment spreadsheets that were temporarily removed in Jan
- 14:56, 27 March 2019 diff hist +328 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per CM, added the already existing (in other articles) reference to the AC Index Price Adjustment Guidance
- 14:22, 27 March 2019 diff hist 0 File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx Smithk uploaded a new version of File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx current
- 12:47, 27 March 2019 diff hist -266 m Main Page
- 12:46, 27 March 2019 diff hist +365 m Main Page EPG 751.50, EPG 751.14
- 12:42, 27 March 2019 diff hist +663 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements: Per BR, clarified steel girder galvanizing procedure
- 12:25, 27 March 2019 diff hist +23 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, clarified steel girder galvanizing procedure
- 12:10, 27 March 2019 diff hist +1,452 m 751.50 Standard Detailing Notes →A4a1. Steel Structures- Nonweathering Steel: Per BR, added A4a1.8 notes to clarify steel girder galvanizing procedure. Specs updated later in April.