User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:48, 5 April 2019 diff hist +108 m 236.13 Designing Right of Way Plans →236.13.13 Plan Submittal and Filing: Per RW, updated guidance to reflect current Commision Policy
- 11:01, 4 April 2019 diff hist 0 N File:Fig 616.6.87.2.pdf current
- 11:01, 4 April 2019 diff hist -15 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per TS, increased the spacing between the long-term rumble strips from "2 to 4 feet" to "10 to 12 feet" in Figs. 616.6.87.1 and .2 for a greater area of effectiveness.
- 10:53, 4 April 2019 diff hist 0 File:Fig 616.6.87.1.pdf Smithk uploaded a new version of File:Fig 616.6.87.1.pdf current
- 12:08, 3 April 2019 diff hist -33 m Category:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches updated link to Std. Plan 608.50 current
- 12:05, 3 April 2019 diff hist 0 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria
- 12:04, 3 April 2019 diff hist 0 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria updated link to Std. Plan 608.50
- 13:57, 1 April 2019 diff hist 0 File:101 Storm Water Database Initial Setup QRG.pdf Smithk uploaded a new version of File:101 Storm Water Database Initial Setup QRG.pdf current
- 12:09, 1 April 2019 diff hist -31 m Category:137 Construction Inspection Guidance for Records to be Maintained →137.3 Naming Convention: Per CM, updated some naming convention examples
- 15:09, 29 March 2019 diff hist +98 m 236.16 Outdoor Advertising Per RW, updated the Application for Outdoor Advertising Vegetation Permit link
- 14:49, 29 March 2019 diff hist 0 File:751.1.2.20 Request.xlsx Smithk uploaded a new version of File:751.1.2.20 Request.xlsx current
- 07:03, 29 March 2019 diff hist -15 m 141.1 Cost Share Program →141.1.3 Application Process: Updated Cost Share Program application link current
- 15:13, 27 March 2019 diff hist +710 m Category:101 Standard Forms →Construction and Materials: Per CM, returned 5 updated AC Index Price Adjustment spreadsheets that were temporarily removed in Jan
- 14:56, 27 March 2019 diff hist +328 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per CM, added the already existing (in other articles) reference to the AC Index Price Adjustment Guidance
- 14:22, 27 March 2019 diff hist 0 File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx Smithk uploaded a new version of File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx current
- 12:47, 27 March 2019 diff hist -266 m Main Page
- 12:46, 27 March 2019 diff hist +365 m Main Page EPG 751.50, EPG 751.14
- 12:42, 27 March 2019 diff hist +663 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements: Per BR, clarified steel girder galvanizing procedure
- 12:25, 27 March 2019 diff hist +23 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, clarified steel girder galvanizing procedure
- 12:10, 27 March 2019 diff hist +1,452 m 751.50 Standard Detailing Notes →A4a1. Steel Structures- Nonweathering Steel: Per BR, added A4a1.8 notes to clarify steel girder galvanizing procedure. Specs updated later in April.
- 14:44, 26 March 2019 diff hist 0 File:751.1.2.20 Request.xlsx Smithk uploaded a new version of File:751.1.2.20 Request.xlsx
- 15:13, 25 March 2019 diff hist 0 N File:101 traffic forecast request form.pdf
- 15:13, 25 March 2019 diff hist 0 N File:101 road user costs request form.pdf current
- 15:13, 25 March 2019 diff hist +158 m Category:101 Standard Forms →Planning: Per TP, added two forms
- 14:29, 25 March 2019 diff hist +556 m 236.7 Negotiation Restored guidance from earlier in the day. To be updated later.
- 14:21, 25 March 2019 diff hist +9,275 m 236.4 Description Writing and Titles →236.4.4 Title and ADA Responsibility: Restored guidance. To be updated later.
- 13:32, 25 March 2019 diff hist -4 m 236.7 Negotiation →236.7.7.4 Methods for Reporting to the IRS: Per RW, updated to reflect changes in EPG 236.4.4.
- 13:18, 25 March 2019 diff hist -113 m 236.7 Negotiation →236.7.7.4 Methods for Reporting to the IRS: Per RW, removed references to recently deleted EPG articles
- 13:17, 25 March 2019 diff hist -239 m 236.7 Negotiation →236.7.6 Acquisitions of Maintenance Sites and Other Capital Improvement Sites: Per RW, removed references to recently deleted EPG articles
- 13:15, 25 March 2019 diff hist -200 m 236.7 Negotiation →236.7.4 Escrow Agreements, Deeds of Release and Purchase Agreement: Per RW, removed references to recently deleted EPG articles
- 13:09, 25 March 2019 diff hist 0 N File:236.4.4.1 ADA.docx current
- 13:09, 25 March 2019 diff hist +6 m 236.4 Description Writing and Titles →236.4.4.4 Plan Development Based on Non-MoDOT ADA Facility and Title, Ownership or ADA Responsibility
- 13:08, 25 March 2019 diff hist -9,281 m 236.4 Description Writing and Titles →236.4.4 Title Datum and Allied Services: Per RW, updated EPG 236.4.4 guidance to reflect current policy and business practice.
- 07:11, 22 March 2019 diff hist -7 m Category:502 Portland Cement Concrete Base and Pavement updated link
- 14:58, 21 March 2019 diff hist 0 File:121.5.1.1.1 current.pdf Smithk uploaded a new version of File:121.5.1.1.1 current.pdf current
- 14:57, 21 March 2019 diff hist -216 m 121.5 Asset Management
- 13:30, 21 March 2019 diff hist +216 m 121.5 Asset Management Per TP, "Current Asset Management Plan Summary" updated.
- 12:16, 21 March 2019 diff hist -238 m Main Page EPG 403
- 12:09, 21 March 2019 diff hist +26 m Category:403 Asphaltic Concrete Pavement →403.1.19 Acceptance of Material (Sec 403.19)
- 12:07, 21 March 2019 diff hist +1 m Category:403 Asphaltic Concrete Pavement →403.1.19 Acceptance of Material (Sec 403.19): Per MT, corrected the frequency for rice dryback testing when it proves inconsequential. Currently the article states 1 per 2. This should have been 1 per 4.
- 14:31, 20 March 2019 diff hist +1 m Category:1059 Protective Coating Material
- 10:50, 19 March 2019 diff hist +13 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, corrected AWP link
- 08:55, 19 March 2019 diff hist -222 m 236.5 Property Management
- 08:45, 19 March 2019 diff hist +216 m 236.5 Property Management Updated link to Categorical Exclusion Review (Form 3.1.2)]
- 13:51, 18 March 2019 diff hist 0 File:121.5.1.1.1 current.pdf Smithk uploaded a new version of File:121.5.1.1.1 current.pdf
- 10:49, 18 March 2019 diff hist -9 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.6.5, Instructions for Preparing Categorical Exclusion Determination
- 10:48, 18 March 2019 diff hist 0 N File:136.6.5.pdf current
- 10:48, 18 March 2019 diff hist -2 m LPA:136.6 Environmental and Cultural Requirements
- 10:43, 18 March 2019 diff hist -16 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated Fig. 136.6.5 Instructions for Preparing Categorical Exclusion Determination
- 14:20, 15 March 2019 diff hist -13 m Main Page EPG 152
- 12:45, 15 March 2019 diff hist -9 m Category:152 Contactor Bonding Responsibilities Per Cm, updated Bond PowerPoint/pdf
- 12:44, 15 March 2019 diff hist 0 File:152.pdf Smithk uploaded a new version of File:152.pdf current
- 08:16, 15 March 2019 diff hist 0 N File:152.pdf
- 08:16, 15 March 2019 diff hist -11 m Category:152 Contactor Bonding Responsibilities
- 08:13, 15 March 2019 diff hist -1 m Category:152 Contactor Bonding Responsibilities
- 08:13, 15 March 2019 diff hist +258 m Category:152 Contactor Bonding Responsibilities Per CM, added PowerPoint tutorial for contract bonds
- 11:01, 14 March 2019 diff hist -360 m Main Page EPG 910.3
- 10:57, 14 March 2019 diff hist -11,611 m 910.3 Dynamic Message Signs (DMS) Per TS, updated guidance. References new types of DMSs.
- 07:48, 13 March 2019 diff hist -265 m 234.6 Diverging Diamond Interchanges →234.6.6 Public Involvement: removed archaic video
- 07:45, 13 March 2019 diff hist +1 m 234.6 Diverging Diamond Interchanges →234.6.2.1.1 Modeling/Simulation
- 07:16, 13 March 2019 diff hist -10 m 234.6 Diverging Diamond Interchanges
- 15:20, 12 March 2019 diff hist +34 m Main Page
- 13:16, 12 March 2019 diff hist -7 m Main Page EPG 750.7
- 13:13, 12 March 2019 diff hist +15 m 750.7 Non-Hydraulic Considerations →750.7.3.1 Embedment Requirements
- 13:11, 12 March 2019 diff hist +4 750.7 Non-Hydraulic Considerations →750.7.3.1 Embedment Requirements
- 13:11, 12 March 2019 diff hist +157 m 750.7 Non-Hydraulic Considerations →750.7.3.1 Embedment Requirements: Per Env'l, added minor note stating the COE must validate whether a stream is "ephemeral"
- 10:00, 11 March 2019 diff hist 0 File:751.22.3.10.7.jpg Smithk uploaded a new version of File:751.22.3.10.7.jpg current
- 08:49, 11 March 2019 diff hist 0 N File:121.5.1.1.1 current.pdf
- 08:48, 11 March 2019 diff hist +306 m 121.5 Asset Management Per TP, uploaded the document, "Current Asset Management Plan Summary"
- 15:42, 8 March 2019 diff hist -3 m LPA:136.3 Federal Aid Basics →136.3.8.11.2 Purpose
- 14:07, 8 March 2019 diff hist 0 File:Job Order Contracts Oct 2012.docx Smithk uploaded a new version of File:Job Order Contracts Oct 2012.docx current
- 14:06, 8 March 2019 diff hist 0 File:Job Order Contracts July 2012.docx Smithk uploaded a new version of File:Job Order Contracts July 2012.docx current
- 14:05, 8 March 2019 diff hist 0 File:Job Order Contracts Aug 2012.docx Smithk uploaded a new version of File:Job Order Contracts Aug 2012.docx current
- 14:04, 8 March 2019 diff hist 0 File:Job Order Contracts.docx Smithk uploaded a new version of File:Job Order Contracts.docx current
- 14:03, 8 March 2019 diff hist 0 File:How to Use Cognos Reports.docx Smithk uploaded a new version of File:How to Use Cognos Reports.docx current
- 11:42, 8 March 2019 diff hist +47 m 646.3 Private Underpasses updated link current
- 12:16, 7 March 2019 diff hist -300 m Category:1015 Bituminous Material updated numerous approved products links
- 11:17, 7 March 2019 diff hist +72 m 236.6 Appraisal and Appraisal Review →236.6.1.4 Employment of Retirees: updated link
- 11:15, 7 March 2019 diff hist +70 m 236.6 Appraisal and Appraisal Review →236.6.1.3 Moonlighting: updated link
- 10:52, 7 March 2019 diff hist +2 m Category:600 INCIDENTAL CONSTRUCTION current
- 10:03, 7 March 2019 diff hist +192 m Category:601 Field Laboratories →Equipment Verification Samples (Sec 601.2.2.1): Per CM, added a clarifying sentence with a link to the QRG for Equipment Verification Samples
- 14:44, 6 March 2019 diff hist +133 m Main Page EPG 236.7.2.3
- 14:37, 6 March 2019 diff hist +230 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, clarified guidance to allow minimum offer to be reduced if approved by Asst. to State Design Engineer – RW
- 11:40, 6 March 2019 diff hist -4 m Category:173 Erosion Control for Maintenance Operations →173.5.2 Project Name: Spring Creek Bridge Repair
- 10:03, 6 March 2019 diff hist -3 m Category:1180 Bituminous Stockpile Patching Material
- 10:03, 6 March 2019 diff hist +3 m Category:1180 Bituminous Stockpile Patching Material
- 11:48, 5 March 2019 diff hist +257 m Category:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches updated links to std plans
- 16:14, 1 March 2019 diff hist -21 m Main Page EPG 616.16.1
- 16:09, 1 March 2019 diff hist -180 m 616.16 Law Enforcement Services Per TS, updated guidelines to reflect a more standardized process throughout the state.
- 14:19, 1 March 2019 diff hist +47 m Main Page EPG 236.16
- 14:01, 1 March 2019 diff hist -241 m 236.16 Outdoor Advertising Per RW, updated several ODA policies
- 13:08, 1 March 2019 diff hist -31 m Category:109 Measurement and Payment Per CM, minor update to EPG guidance to reflect re-numbering of Sec 109.
- 16:01, 27 February 2019 diff hist -93 m Main Page EPG 121.5
- 15:58, 27 February 2019 diff hist 0 N File:121.5.5 needs.pdf current
- 15:57, 27 February 2019 diff hist 0 N File:121.5.5.jpg current
- 15:57, 27 February 2019 diff hist 0 N File:121.5.4.pdf current
- 15:56, 27 February 2019 diff hist 0 N File:121.5.3 lifecycle.jpg current
- 15:56, 27 February 2019 diff hist 0 N File:121.5.3 satisfaction.jpg current
- 15:55, 27 February 2019 diff hist 0 N File:121.5.1.2.2.jpg current
- 15:55, 27 February 2019 diff hist 0 N File:121.5.1.2.1.jpg current
- 15:54, 27 February 2019 diff hist 0 N File:121.5.1.1.2 pavement.jpg current
- 15:53, 27 February 2019 diff hist 0 N File:121.5.1.1.2 aran.jpg current
- 15:53, 27 February 2019 diff hist 0 N File:121.5.1.1.1 low.jpg current
- 15:52, 27 February 2019 diff hist 0 N File:121.5.1.1.1 minor.jpg current
- 15:52, 27 February 2019 diff hist 0 N File:121.5.1.1.1 major.jpg current
- 15:51, 27 February 2019 diff hist +25,893 m 121.5 Asset Management Per TP, updated and expanded Asset Mgmt info in EPG 121.5 to catch up to current practice.
- 11:11, 27 February 2019 diff hist +227 m LPA:136.11 Local Public Agency Construction added a link to Fig. 136.3.18, for convenience
- 11:09, 27 February 2019 diff hist +49 m LPA:136.12 Figures, Glossary and Other Useful Links
- 09:23, 27 February 2019 diff hist 0 File:756 LRFD flowchart.pdf Smithk uploaded a new version of File:756 LRFD flowchart.pdf current
- 09:22, 27 February 2019 diff hist 0 File:756 LFD flow chart.pdf Smithk uploaded a new version of File:756 LFD flow chart.pdf current
- 09:05, 26 February 2019 diff hist 0 File:751.1.2.20 Guidance.xlsx Smithk uploaded a new version of File:751.1.2.20 Guidance.xlsx current
- 09:00, 26 February 2019 diff hist 0 File:751.1.2.20 Request.xlsx Smithk uploaded a new version of File:751.1.2.20 Request.xlsx
- 13:15, 25 February 2019 diff hist -165 m 806.1 Erosion Control Measures →806.1.7.2 Construction Considerations: Per EPS, reverted guidance to previous text. Future update will await support from specs or other standards.
- 09:43, 25 February 2019 diff hist -44 m Main Page EPG 147.3.5
- 09:37, 25 February 2019 diff hist +57 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts
- 09:36, 25 February 2019 diff hist +938 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: Per CM, added guidance about adding a reason for extending the contract
- 13:59, 22 February 2019 diff hist -180 m Main Page EPG 806.1.7
- 13:25, 22 February 2019 diff hist +162 m 806.1 Erosion Control Measures →806.1.7 Temporary Pipe and temporary Construction Crossings: Per Env'l, clarified guidance in a way that will not require any changes from what is currently expected across the districts.
- 12:20, 22 February 2019 diff hist -52 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.5 Transition Area (MUTCD 6C.05)
- 10:24, 22 February 2019 diff hist +59 m 616.22 Advanced Work Zone Training Per TS, added subtitle for clarity
- 13:11, 21 February 2019 diff hist +85 m Category:101 Standard Forms →Construction and Materials: Per CM, added Pile Driving Data PDA form
- 11:24, 21 February 2019 diff hist 0 m 147.3 Job Order Contracting (JOC) →147.3.3 JOC Development: Job Special Provisions and Plan Sheets
- 11:23, 21 February 2019 diff hist 0 File:148.3.jpg Smithk uploaded a new version of File:148.3.jpg current
- 11:09, 21 February 2019 diff hist +283 m 643.2 Local Utility Adjustments - Public and Private Per CE, replaced "BA" with Buy America
- 10:49, 21 February 2019 diff hist -12 m 237.8 Contract Time →237.8.2 Liquidation Damages: Per CM, minor correction
- 11:38, 20 February 2019 diff hist +70 m Category:610 Pavement Smoothness →610.5 IRI Measurements: updated link current
- 14:46, 19 February 2019 diff hist -11 m Category:106 Control of Material updated link
- 14:07, 19 February 2019 diff hist +1 m 751.38 Spread Footings →751.38.4.3 Settlement of Spread Footings on Cohesive Soils
- 14:06, 19 February 2019 diff hist 0 m 751.38 Spread Footings →751.38.4.3 Settlement of Spread Footings on Cohesive Soils
- 14:04, 19 February 2019 diff hist -4 m 751.38 Spread Footings →751.38.4.2 Settlement of Spread Footings on Weak Rock (5 ksf ≤ qu ≤ 100 ksf)
- 14:00, 19 February 2019 diff hist +20 m 751.38 Spread Footings →751.38.4 Design for Axial Loading at Serviceability Limit States
- 13:48, 19 February 2019 diff hist -1 m 751.36 Driven Piles →751.36.3 Design Procedure
- 13:46, 19 February 2019 diff hist -1 m 751.36 Driven Piles →751.36.3 Design Procedure
- 13:37, 19 February 2019 diff hist +4 m 751.35 Concrete Pile Cap Integral End Bents →751.35.2.2 Loads
- 15:59, 15 February 2019 diff hist 0 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs)
- 15:50, 15 February 2019 diff hist +120 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG, AWP MA Associating Material to Source
- 09:04, 15 February 2019 diff hist -257 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.2 "Point of Presence" Sign: Removal of archaic reference to ARRA. Agreed to by TS and TP.
- 09:03, 15 February 2019 diff hist -67 m 141.7 Transportation Improvement Program Approval →141.7.5 Acronyms: Removal of archaic reference to ARRA. Agreed to by TS and TP. current
- 10:50, 14 February 2019 diff hist -302 m Main Page EPG 101, EPG 134
- 10:44, 14 February 2019 diff hist +115 m Category:101 Standard Forms →Quick Reference Guides (QRGs): Per CM, new AWP QRG
- 13:30, 13 February 2019 diff hist 0 File:134.2.2.2.docx Smithk uploaded a new version of File:134.2.2.2.docx
- 08:55, 11 February 2019 diff hist 0 File:Form 806.8.2 black.docx Smithk uploaded a new version of File:Form 806.8.2 black.docx current
- 08:47, 11 February 2019 diff hist 0 File:Form 806.8.2.docx Smithk uploaded a new version of File:Form 806.8.2.docx current
- 08:44, 11 February 2019 diff hist 0 File:Form 806.8.10 June 2012.docx Smithk uploaded a new version of File:Form 806.8.10 June 2012.docx current
- 16:15, 8 February 2019 diff hist 0 File:Form 806.8.10.docx Smithk uploaded a new version of File:Form 806.8.10.docx current
- 16:13, 8 February 2019 diff hist 0 File:Form 3-4.1C.docx Smithk uploaded a new version of File:Form 3-4.1C.docx current
- 16:02, 8 February 2019 diff hist -12 m Main Page EPG 751.1.3.4
- 15:57, 8 February 2019 diff hist +302 m 751.1 Preliminary Design →751.1.3.4 Railing Type, Height and Guidelines for Curb Blockouts: Per BR, revision coordinates with FHWA requirement for new wearing surfaces, based on crash tests showing if break is higher than 13", the chance of vehicle overturning is increased
- 14:18, 8 February 2019 diff hist 0 N File:237.9.3.2 MHTC Agenda Item Checklist.dotx current
- 14:17, 8 February 2019 diff hist +48 m 237.9 Submission of Plans and Supporting Documents →237.9.3.2 Required Information for Submittal: Per Commission's Office, updated MHTC Agenda Item Checklist
- 13:49, 8 February 2019 diff hist 0 File:237.9 MHTC Agenda Item Checklist Sept 2014.docx Smithk uploaded a new version of File:237.9 MHTC Agenda Item Checklist Sept 2014.docx current
- 11:27, 8 February 2019 diff hist -95 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.2 "Point of Presence" Sign
- 15:44, 7 February 2019 diff hist 0 File:Form 3-3.3C 2013.docx Smithk uploaded a new version of File:Form 3-3.3C 2013.docx current
- 15:43, 7 February 2019 diff hist 0 File:Form 3-3.3C.docx Smithk uploaded a new version of File:Form 3-3.3C.docx current
- 15:41, 7 February 2019 diff hist 0 File:Form 236.9.1.1.docx Smithk uploaded a new version of File:Form 236.9.1.1.docx current
- 15:29, 7 February 2019 diff hist 0 File:Form 236.8.6.8(b).docx Smithk uploaded a new version of File:Form 236.8.6.8(b).docx current
- 14:46, 7 February 2019 diff hist 0 File:Form 236.8.6.5 March 2012.docx Smithk uploaded a new version of File:Form 236.8.6.5 March 2012.docx current
- 14:27, 7 February 2019 diff hist 0 File:Form 236.8.13.5.docx Smithk uploaded a new version of File:Form 236.8.13.5.docx current
- 14:26, 7 February 2019 diff hist 0 File:Form 236.8.12.3(b)(s).docx Smithk uploaded a new version of File:Form 236.8.12.3(b)(s).docx current
- 14:25, 7 February 2019 diff hist 0 File:Fig.136.3.29.docx Smithk uploaded a new version of File:Fig.136.3.29.docx current
- 14:24, 7 February 2019 diff hist 0 File:Fig.136.3.24.docx Smithk uploaded a new version of File:Fig.136.3.24.docx current
- 14:21, 7 February 2019 diff hist 0 File:Fig.136.3.20 2016.docx Smithk uploaded a new version of File:Fig.136.3.20 2016.docx current
- 14:18, 7 February 2019 diff hist 0 File:Fig.136.3.20 2015.docx Smithk uploaded a new version of File:Fig.136.3.20 2015.docx current
- 14:17, 7 February 2019 diff hist 0 File:Fig.136.3.20 2014.docx Smithk uploaded a new version of File:Fig.136.3.20 2014.docx current
- 14:04, 7 February 2019 diff hist 0 File:Fig.136.3.20 2013.docx Smithk uploaded a new version of File:Fig.136.3.20 2013.docx current
- 14:03, 7 February 2019 diff hist 0 File:Fig.136.3.20 2017.docx Smithk uploaded a new version of File:Fig.136.3.20 2017.docx current
- 14:03, 7 February 2019 diff hist 0 File:Fig.136.3.20 Dec 2017.docx Smithk uploaded a new version of File:Fig.136.3.20 Dec 2017.docx current
- 13:58, 7 February 2019 diff hist 0 File:Fig.136.3.20.docx Smithk uploaded a new version of File:Fig.136.3.20.docx current
- 13:56, 7 February 2019 diff hist 0 File:Fig.136.3.19 2015.docx Smithk uploaded a new version of File:Fig.136.3.19 2015.docx current
- 13:54, 7 February 2019 diff hist 0 File:Fig. 806.8.9.docx Smithk uploaded a new version of File:Fig. 806.8.9.docx current
- 13:37, 7 February 2019 diff hist 0 File:Fig. 806.8.1 June 2012.docx Smithk uploaded a new version of File:Fig. 806.8.1 June 2012.docx current
- 13:36, 7 February 2019 diff hist 0 File:Fig. 806.8.1 2014.docx Smithk uploaded a new version of File:Fig. 806.8.1 2014.docx current
- 13:35, 7 February 2019 diff hist 0 File:Fig. 806.8.1.docx Smithk uploaded a new version of File:Fig. 806.8.1.docx current
- 13:27, 7 February 2019 diff hist 0 File:Fig. 136.4.1 Oct 2015.docx Smithk uploaded a new version of File:Fig. 136.4.1 Oct 2015.docx current
- 13:24, 7 February 2019 diff hist 0 File:Fig. 136.4.1 Nov 2015.docx Smithk uploaded a new version of File:Fig. 136.4.1 Nov 2015.docx current
- 13:23, 7 February 2019 diff hist 0 File:Fig. 136.4.1 May 2015.docx Smithk uploaded a new version of File:Fig. 136.4.1 May 2015.docx current
- 11:27, 7 February 2019 diff hist +344 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →Borrow (Sec 203.3): Per Env'l and CM, a reference to an archaic QRG remains in EPG 203. This proposal provides updated guidance for the correct, new QRG, Storm Water Database Initial Setup.
- 11:16, 7 February 2019 diff hist +52 m Category:101 Standard Forms →SiteManager Quick Reference Guides (QRGs) 20px
- 08:11, 7 February 2019 diff hist 0 File:321.2.10.6.4.jpg Smithk uploaded a new version of File:321.2.10.6.4.jpg current
- 15:22, 6 February 2019 diff hist 0 m 236.11 Mediation Per RW, updated links
- 15:15, 6 February 2019 diff hist +2 m Category:101 Standard Forms →Construction and Materials
- 09:51, 6 February 2019 diff hist 0 File:Fig. 136.4.1 June 2015.docx Smithk uploaded a new version of File:Fig. 136.4.1 June 2015.docx current
- 09:50, 6 February 2019 diff hist 0 File:Fig. 136.4.1 June 26, 2013.docx Smithk uploaded a new version of File:Fig. 136.4.1 June 26, 2013.docx current
- 09:49, 6 February 2019 diff hist 0 File:Fig. 136.4.1 June 2013.docx Smithk uploaded a new version of File:Fig. 136.4.1 June 2013.docx current
- 09:38, 6 February 2019 diff hist 0 File:Fig. 136.4.1 May 2013.docx Smithk uploaded a new version of File:Fig. 136.4.1 May 2013.docx current
- 09:37, 6 February 2019 diff hist 0 File:Fig. 136.4.1 2016.docx Smithk uploaded a new version of File:Fig. 136.4.1 2016.docx current
- 09:34, 6 February 2019 diff hist 0 File:Fig. 136.4.1 Mar 2013.docx Smithk uploaded a new version of File:Fig. 136.4.1 Mar 2013.docx current
- 09:33, 6 February 2019 diff hist 0 File:Fig. 136.4.1 2015.docx Smithk uploaded a new version of File:Fig. 136.4.1 2015.docx current
- 09:32, 6 February 2019 diff hist 0 File:Fig. 136.4.1 2014.docx Smithk uploaded a new version of File:Fig. 136.4.1 2014.docx current
- 09:31, 6 February 2019 diff hist 0 File:Fig. 136.4.1 2013.docx Smithk uploaded a new version of File:Fig. 136.4.1 2013.docx current
- 09:26, 6 February 2019 diff hist 0 File:Fig. 136.4.1.docx Smithk uploaded a new version of File:Fig. 136.4.1.docx current
- 09:16, 6 February 2019 diff hist 0 File:Fig. 134.2 MoDOT Consultant Invoice Checklist.docx Smithk uploaded a new version of File:Fig. 134.2 MoDOT Consultant Invoice Checklist.docx current
- 09:16, 6 February 2019 diff hist 0 File:Fig. 134.1 Blank Consultant Invoice.docx Smithk uploaded a new version of File:Fig. 134.1 Blank Consultant Invoice.docx current
- 08:30, 6 February 2019 diff hist 0 File:Equipment Verification Samples.docx Smithk uploaded a new version of File:Equipment Verification Samples.docx current
- 16:08, 5 February 2019 diff hist -40 m Category:108 Prosecution and Progress →108.1.3 Disadvantaged Business Enterprises (DBE) Subcontracting: Per ECR and A&I, removed confusing guidance (that was originally entered in Feb 2018)
- 14:52, 5 February 2019 diff hist 0 File:Emergency Contacts Dec 2014.docx Smithk uploaded a new version of File:Emergency Contacts Dec 2014.docx current
- 14:52, 5 February 2019 diff hist 0 File:Media-Emergency Contacts 2014.docx Smithk uploaded a new version of File:Media-Emergency Contacts 2014.docx current
- 14:51, 5 February 2019 diff hist 0 File:Emergency Contacts 2014.docx Smithk uploaded a new version of File:Emergency Contacts 2014.docx current
- 14:50, 5 February 2019 diff hist 0 File:Emergency Contacts.docx Smithk uploaded a new version of File:Emergency Contacts.docx current
- 14:48, 5 February 2019 diff hist 0 File:District Final Plans Checklist D12 2014.docx Smithk uploaded a new version of File:District Final Plans Checklist D12 2014.docx current
- 14:47, 5 February 2019 diff hist 0 File:District Final Plans Checklist D12.docx Smithk uploaded a new version of File:District Final Plans Checklist D12.docx current
- 14:40, 5 February 2019 diff hist 0 File:Digital Signature for Adobe Reader DC or Pro DC.docx Smithk uploaded a new version of File:Digital Signature for Adobe Reader DC or Pro DC.docx current
- 14:37, 5 February 2019 diff hist 0 File:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx Smithk uploaded a new version of File:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx current
- 14:21, 5 February 2019 diff hist 0 File:Digital Signature for Adobe Pro 10 (MoDOT).docx Smithk uploaded a new version of File:Digital Signature for Adobe Pro 10 (MoDOT).docx
- 14:12, 5 February 2019 diff hist 0 File:Digital Signature for Adobe Pro 10 (Contractors) July 2014.docx Smithk uploaded a new version of File:Digital Signature for Adobe Pro 10 (Contractors) July 2014.docx current
- 14:10, 5 February 2019 diff hist 0 File:Digital Signature for Adobe Pro 10 (Contractors) 2014.docx Smithk uploaded a new version of File:Digital Signature for Adobe Pro 10 (Contractors) 2014.docx current
- 14:09, 5 February 2019 diff hist 0 File:Digital Signature for Adobe Pro 10 (Contractors) 2015.docx Smithk uploaded a new version of File:Digital Signature for Adobe Pro 10 (Contractors) 2015.docx current
- 14:07, 5 February 2019 diff hist 0 File:Digital Signature for Adobe Pro 10 (Contractors) 2013.docx Smithk uploaded a new version of File:Digital Signature for Adobe Pro 10 (Contractors) 2013.docx current
- 14:06, 5 February 2019 diff hist 0 File:Digital Signature for Adobe Pro 10 (Contractors).docx Smithk uploaded a new version of File:Digital Signature for Adobe Pro 10 (Contractors).docx current
- 14:04, 5 February 2019 diff hist 0 File:Diaries.docx Smithk uploaded a new version of File:Diaries.docx current
- 13:45, 5 February 2019 diff hist 0 File:Daily Work Reports Feb 2012.docx Smithk uploaded a new version of File:Daily Work Reports Feb 2012.docx current
- 13:45, 5 February 2019 diff hist 0 File:Daily Work Reports Aug 2012.docx Smithk uploaded a new version of File:Daily Work Reports Aug 2012.docx current
- 13:44, 5 February 2019 diff hist 0 File:Daily Work Reports 2013.docx Smithk uploaded a new version of File:Daily Work Reports 2013.docx current
- 13:43, 5 February 2019 diff hist 0 File:Daily Work Reports June 2011.docx Smithk uploaded a new version of File:Daily Work Reports June 2011.docx current
- 13:42, 5 February 2019 diff hist 0 File:D-12.docx Smithk uploaded a new version of File:D-12.docx current
- 13:01, 5 February 2019 diff hist 0 File:Culvert Hydraulics Report 2014.docx Smithk uploaded a new version of File:Culvert Hydraulics Report 2014.docx current
- 12:25, 5 February 2019 diff hist 0 File:Culvert Hydraulics Report.docx Smithk uploaded a new version of File:Culvert Hydraulics Report.docx current
- 12:22, 5 February 2019 diff hist 0 File:CRE2).docx Smithk uploaded a new version of File:CRE2).docx current
- 12:21, 5 February 2019 diff hist 0 File:Contractor Pay Estimates 2013.docx Smithk uploaded a new version of File:Contractor Pay Estimates 2013.docx current
- 12:19, 5 February 2019 diff hist +13 m Category:109 Measurement and Payment
- 12:16, 5 February 2019 diff hist 0 File:Contractor Pay Estimates.docx Smithk uploaded a new version of File:Contractor Pay Estimates.docx current
- 12:15, 5 February 2019 diff hist 0 File:Contract Master List Feb 2012.docx Smithk uploaded a new version of File:Contract Master List Feb 2012.docx current
- 12:12, 5 February 2019 diff hist 0 File:Contract Adjustments July 31, 2012.docx Smithk uploaded a new version of File:Contract Adjustments July 31, 2012.docx current
- 12:11, 5 February 2019 diff hist 0 File:Contract Adjustments Apr 23, 2012.docx Smithk uploaded a new version of File:Contract Adjustments Apr 23, 2012.docx current
- 12:09, 5 February 2019 diff hist 0 File:Change orders zero dollar 2013.docx Smithk uploaded a new version of File:Change orders zero dollar 2013.docx current
- 12:07, 5 February 2019 diff hist 0 File:Change orders zero dollar.docx Smithk uploaded a new version of File:Change orders zero dollar.docx current
- 12:06, 5 February 2019 diff hist 0 File:Change Orders Oct 2011.docx Smithk uploaded a new version of File:Change Orders Oct 2011.docx current
- 12:05, 5 February 2019 diff hist 0 File:Change Orders Feb 2013.docx Smithk uploaded a new version of File:Change Orders Feb 2013.docx current
- 12:04, 5 February 2019 diff hist 0 File:Change Orders Dec 2013.docx Smithk uploaded a new version of File:Change Orders Dec 2013.docx current
- 11:58, 5 February 2019 diff hist 0 File:Change Orders Apr 2012.docx Smithk uploaded a new version of File:Change Orders Apr 2012.docx current
- 11:52, 5 February 2019 diff hist 0 File:Change Orders 2015.docx Smithk uploaded a new version of File:Change Orders 2015.docx current
- 11:50, 5 February 2019 diff hist 0 File:Change Orders 2014.docx Smithk uploaded a new version of File:Change Orders 2014.docx current
- 11:48, 5 February 2019 diff hist 0 File:Change Orders – Time Adjustment May 2012.docx Smithk uploaded a new version of File:Change Orders – Time Adjustment May 2012.docx current
- 11:47, 5 February 2019 diff hist 0 File:Change Orders – Time Adjustment Feb 2013.docx Smithk uploaded a new version of File:Change Orders – Time Adjustment Feb 2013.docx current
- 11:22, 5 February 2019 diff hist +26 m Category:1001 General Requirements for Material →1001.8 Sample Identification
- 11:19, 5 February 2019 diff hist +19 m Category:403 Asphaltic Concrete Pavement
- 11:19, 5 February 2019 diff hist +39 m Category:101 Standard Forms →SiteManager Quick Reference Guides (QRGs) 20px
- 11:13, 5 February 2019 diff hist +379 m Category:101 Standard Forms →SiteManager Quick Reference Guides (QRGs) 20px
- 11:12, 5 February 2019 diff hist -70 m Category:109 Measurement and Payment
- 10:49, 5 February 2019 diff hist +50 m Category:101 Standard Forms →SiteManager Quick Reference Guides (QRGs) 20px
- 10:24, 5 February 2019 diff hist 0 File:Change Orders – Time Adjustment Dec 2013.docx Smithk uploaded a new version of File:Change Orders – Time Adjustment Dec 2013.docx current
- 10:24, 5 February 2019 diff hist 0 File:Change Orders – Time Adjustment Apr 2012.docx Smithk uploaded a new version of File:Change Orders – Time Adjustment Apr 2012.docx current
- 10:22, 5 February 2019 diff hist 0 File:Change Orders – Mobilization and Contract Bond Jan 2012.docx Smithk uploaded a new version of File:Change Orders – Mobilization and Contract Bond Jan 2012.docx current
- 10:20, 5 February 2019 diff hist 0 File:Change Orders – Mobilization and Contract Bond Feb 2015.docx Smithk uploaded a new version of File:Change Orders – Mobilization and Contract Bond Feb 2015.docx current
- 10:20, 5 February 2019 diff hist 0 File:Change Orders – Mobilization and Contract Bond 2015.docx Smithk uploaded a new version of File:Change Orders – Mobilization and Contract Bond 2015.docx current
- 10:12, 5 February 2019 diff hist +12 m Category:109 Measurement and Payment →109.5.2 Daily Force Account Record, Equipment and Materials Account
- 10:07, 5 February 2019 diff hist +302 m Category:109 Measurement and Payment updated QRG links
- 09:51, 5 February 2019 diff hist +4 m Category:109 Measurement and Payment
- 09:28, 5 February 2019 diff hist 0 File:Change Orders – Mobilization and Contract Bond Feb 2013.docx Smithk uploaded a new version of File:Change Orders – Mobilization and Contract Bond Feb 2013.docx current
- 09:26, 5 February 2019 diff hist 0 File:Change Orders – Mobilization and Contract Bond 2014.docx Smithk uploaded a new version of File:Change Orders – Mobilization and Contract Bond 2014.docx current