User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:54, 21 June 2022 diff hist +17 m 902.6 Pedestrian Control Features (MUTCD Chapter 4E) →902.6.8 Pedestrian Detectors (MUTCD Section 4E.08): Per EPS, the minimum distance of pushbuttons from the curb line has been returned to 30 inches.
- 08:36, 17 June 2022 diff hist -43 m Main Page updated broken links
- 07:24, 17 June 2022 diff hist +311 m LPA:136.13 LPA Policy Changes EPG 136.8
- 11:26, 16 June 2022 diff hist +824 m LPA:136.8 Local Public Agency Land Acquisition Per RW, clarified guidance for LPA ROW Staff negotiators.
- 08:38, 15 June 2022 diff hist -58 m 751.8 LFD Culverts Per BR, deleted archaic EPG 751.8 LFD Culverts current
- 11:18, 8 June 2022 diff hist -27 m LPA:136.3 Federal Aid Basics →136.3.5 STIP/TIP: updated broken link
- 15:11, 3 June 2022 diff hist +39 m 642.8 Sidewalk Design Criteria Per EPS, revised PROWAG and TPAR links
- 09:22, 3 June 2022 diff hist +52 m Recent Policy Changes in the EPG EPG 236.5
- 09:17, 3 June 2022 diff hist +69 m 236.5 Property Management →236.5.25.5 Risk Assessment: Per RW, sovereign immunity limits increased in January 2022 and require MoDOT to increase per occurrence coverage from $3.0 M to $3.5 M
- 08:20, 3 June 2022 diff hist 0 m 751.1 Preliminary Design Per TP, updated Major Highway System map
- 08:19, 3 June 2022 diff hist 0 m Category:941 Permits and Access Requests Per TP, updated Major Highway System map
- 08:19, 3 June 2022 diff hist 0 m 822.5 Definitions Per TP, updated Major Highway System map current
- 08:18, 3 June 2022 diff hist 0 m 822.1 Vegetation Management for Major Roads Per TP, updated Major Highway System map current
- 08:17, 3 June 2022 diff hist 0 m 748.2 Roadway Design Criteria Per TP, updated Major Highway System map current
- 08:17, 3 June 2022 diff hist 0 m 643.3 Policy, Standards and Regulations Per TP, updated Major Highway System map
- 08:16, 3 June 2022 diff hist 0 m Category:643 Utility Procedures Per TP, updated Major Highway System map current
- 08:16, 3 June 2022 diff hist 0 m 626.3 Construction Inspection Guidelines for Sec 626 Per TP, updated Major Highway System map current
- 08:16, 3 June 2022 diff hist 0 m 626.2 Centerline Rumble Strips Per TP, updated Major Highway System map
- 08:15, 3 June 2022 diff hist 0 m 626.1 Edgeline Rumble Strips Per TP, updated Major Highway System map current
- 08:14, 3 June 2022 diff hist 0 m 620.12 Construction Inspection for Sec 620 Per TP, updated Major Highway System map
- 08:14, 3 June 2022 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy Per TP, updated Major Highway System map
- 08:12, 3 June 2022 diff hist 0 m 236.13 Designing Right of Way Plans Per TP, updated Major Highway System map
- 08:12, 3 June 2022 diff hist 0 m Category:232 Facility Selection Per TP, updated Major Highway System map
- 08:11, 3 June 2022 diff hist 0 m 231.4 Shoulder Width Per TP, updated Major Highway System map
- 08:10, 3 June 2022 diff hist 0 m 144.5 Pavement Maintenance Per TP, updated Major Highway System map
- 08:09, 3 June 2022 diff hist 0 m Category:144 Practical Operations Per TP, updated Major Highway System map current
- 08:08, 3 June 2022 diff hist 0 m 133.5 Operator’s Guide for Anti-Icing Per TP, updated Major Highway System map current
- 08:07, 3 June 2022 diff hist 0 N File:144 Major Highway System 2022.pdf current
- 08:06, 3 June 2022 diff hist 0 m 121.5 Asset Management Per TP, updated Major Highway System map
- 15:06, 2 June 2022 diff hist +12 m LPA:136.13 LPA Policy Changes EPG 136.8
- 14:57, 2 June 2022 diff hist +559 m LPA:136.13 LPA Policy Changes EPG 136.8
- 14:46, 2 June 2022 diff hist +1 m LPA:136.8 Local Public Agency Land Acquisition Per RW, increased the value of waiver valuations to $25,000 (from $10,000), per FHWA's approval in 2021
- 10:45, 2 June 2022 diff hist +1 m 751.22 Prestressed Concrete I Girders →751.22.3.7.2 Reinforcement
- 10:43, 2 June 2022 diff hist +4 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 10:42, 2 June 2022 diff hist +72 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs
- 13:23, 1 June 2022 diff hist +429 m Recent Policy Changes in the EPG EPG 751
- 12:23, 1 June 2022 diff hist +8 m 751.21 Prestressed Concrete Slab and Box Beams →751.21.3.11 Dowel Bars and Concrete Shear Blocks: updated a link
- 11:29, 1 June 2022 diff hist +24 m 751.50 Standard Detailing Notes updated links
- 11:26, 1 June 2022 diff hist -92 m 751.11 Bearings updated links
- 11:23, 1 June 2022 diff hist 0 m 751.21 Prestressed Concrete Slab and Box Beams updated links
- 11:21, 1 June 2022 diff hist 0 m 751.9 LFD Seismic updated links current
- 11:13, 1 June 2022 diff hist 0 m 751.22 Prestressed Concrete I Girders →751.22.3 Details
- 11:10, 1 June 2022 diff hist 0 N File:751.22.3.10 Open2.jpg current
- 11:09, 1 June 2022 diff hist 0 N File:751.22.3.10 Open1.jpg current
- 11:08, 1 June 2022 diff hist 0 N File:751.22.3.10 Closed2.jpg current
- 11:05, 1 June 2022 diff hist 0 N File:751.22.3.10 Closed1.jpg current
- 11:03, 1 June 2022 diff hist 0 N File:751.22.3.9.3 2022.jpg current
- 11:01, 1 June 2022 diff hist 0 N File:751.22.3.9.2 NU2.jpg current
- 10:59, 1 June 2022 diff hist 0 N File:751.22.3.9.2 NU1.jpg current
- 10:58, 1 June 2022 diff hist 0 N File:751.22.3.9.2 BulbTee2.jpg current
- 10:57, 1 June 2022 diff hist 0 N File:751.22.3.9.2 BulbTee1.jpg current
- 10:55, 1 June 2022 diff hist 0 N File:751.22.3.9.2 IGirders2.jpg current
- 10:53, 1 June 2022 diff hist 0 N File:751.22.3.9.2 IGirders1.jpg current
- 10:51, 1 June 2022 diff hist 0 N File:751.22.3.9.1.3.jpg current
- 10:49, 1 June 2022 diff hist 0 N File:751.22.3.9.1.2 2022.jpg current
- 10:49, 1 June 2022 diff hist 0 N File:751.22.3.9.1.1 2022.jpg current
- 10:46, 1 June 2022 diff hist 0 N File:751.22.3.8.2 NU2.jpg current
- 10:43, 1 June 2022 diff hist 0 N File:751.22.3.8.2 NU1.jpg current
- 10:41, 1 June 2022 diff hist 0 N File:751.22.3.8.2 BulbTee2.jpg current
- 10:38, 1 June 2022 diff hist 0 N File:751.22.3.8.2 BulbTee1.jpg current
- 10:35, 1 June 2022 diff hist 0 N File:751.22.3.8.2 I Girders2.jpg current
- 10:32, 1 June 2022 diff hist 0 N File:751.22.3.8.2 I Girders1.jpg current
- 10:26, 1 June 2022 diff hist 0 N File:751.22.3.8.1.2.jpg current
- 10:23, 1 June 2022 diff hist 0 N File:751.22.3.8.1.1.jpg current
- 10:20, 1 June 2022 diff hist 0 N File:751.22.3.7.4.3.jpg current
- 10:18, 1 June 2022 diff hist 0 N File:751.22.3.7.4.2.jpg current
- 10:16, 1 June 2022 diff hist 0 N File:751.22.3.7.4.1.jpg current
- 10:13, 1 June 2022 diff hist 0 N File:751.22.3.7.3.jpg current
- 10:11, 1 June 2022 diff hist 0 N File:751.22.3.7.2 Change2.jpg current
- 10:09, 1 June 2022 diff hist 0 N File:751.22.3.7.2 Change1.jpg current
- 10:06, 1 June 2022 diff hist 0 N File:751.22.3.7.2 NU2.jpg current
- 10:04, 1 June 2022 diff hist 0 N File:751.22.3.7.2 NU1.jpg current
- 10:02, 1 June 2022 diff hist 0 N File:751.22.3.7.2 BulbTee2.jpg current
- 10:00, 1 June 2022 diff hist 0 N File:751.22.3.7.2 BulbTee1.jpg current
- 09:58, 1 June 2022 diff hist 0 N File:751.22.3.7.2 I Girders2.jpg current
- 09:58, 1 June 2022 diff hist 0 N File:751.22.3.7.2 I Girders1.jpg current
- 09:32, 1 June 2022 diff hist +148 m 751.22 Prestressed Concrete I Girders →751.22.3.7 Closed Concrete Intermediate Diaphragms: Per BR, Concrete diaphragms on bridges.
- 09:24, 1 June 2022 diff hist -134 m 751.22 Prestressed Concrete I Girders →751.22.3.7.1 Dimensions: Per BR, Concrete diaphragms on bridges
- 09:13, 1 June 2022 diff hist 0 N File:751.22.3.7.1.1.jpg current
- 09:11, 1 June 2022 diff hist 0 N File:751.22.3.7.1.2.jpg current
- 09:08, 1 June 2022 diff hist -11,035 751.22 Prestressed Concrete I Girders →751.22.3 Details
- 14:40, 31 May 2022 diff hist -10 m 236.8 Relocation Assistance Program Per RW, updated link for Form 236.8.6.12(d), Moving Cost Claim - Actual Cost - Self Move
- 14:22, 31 May 2022 diff hist 0 N File:751.22.3.5.jpg current
- 12:29, 31 May 2022 diff hist +901 m 751.22 Prestressed Concrete I Girders →751.22.3.5 Bent-up Strands: Per BR, revised guidance related to concrete diaphragms on bridges
- 12:21, 31 May 2022 diff hist 0 N File:751.11.3.6 variations.jpg current
- 12:21, 31 May 2022 diff hist 0 N File:751.11.3.6 girder.jpg current
- 12:20, 31 May 2022 diff hist 0 N File:751.11.3.6 general.jpg current
- 12:20, 31 May 2022 diff hist +1,962 m 751.11 Bearings →751.11.3.6 Girder/Beam Chairs: Per BR, updated guidance for concrete diaphragms on bridges
- 12:10, 31 May 2022 diff hist +237 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.3 Encased Pile Cap Bent
- 12:08, 31 May 2022 diff hist +238 m 751.31 Open Concrete Intermediate Bents →751.31.4.3 Substructure Beam Overhang
- 11:07, 31 May 2022 diff hist 0 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.5 Coil Inserts and Tie Rods
- 11:06, 31 May 2022 diff hist 0 N File:751.35.4.5.jpg current
- 11:05, 31 May 2022 diff hist +1,619 m 751.35 Concrete Pile Cap Integral End Bents →751.35.4.4 Skewed Bents: Per BR, moved integral end bent coil tie details to EPG 751.35.4.5
- 13:42, 25 May 2022 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.10.2
- 13:41, 25 May 2022 diff hist 0 N File:136.10.2 2022.docx current
- 13:41, 25 May 2022 diff hist +2 m LPA:136.10 Advertisement for Bid and Project Award Per LPA, revised Fig. 136.10.2 Bid Concurrence Checklist to match EPG language
- 12:50, 24 May 2022 diff hist +4 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Contracts, minor update for D-12
- 12:50, 24 May 2022 diff hist +8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Contracts, minor update for D-12
- 12:48, 24 May 2022 diff hist +8 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Contracts, minor update for D-12
- 12:47, 24 May 2022 diff hist 0 N File:D-12 May 2022.pdf