Difference between revisions of "Talk:104.7 Scoping Estimates"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Smithk moved page Talk:104.7 Estimates to Talk:104.7 Scoping Estimates: Per Bidding and TP)
 
(No difference)

Latest revision as of 14:16, 30 August 2019

Year of Estimate Figures

Please add the year to the "cost estimate guide for rural preliminary design" document. Knowing the year these costs are representative of would allow adjustment for inflation.

Dan Tschirgi: The last date these figures were updated was added to the heading of this figure, to use in those instances where application of inflation rates is appropriate.