Category talk:203 Roadway and Drainage Excavation, Embankment and Compaction

From Engineering_Policy_Guide
Jump to navigation Jump to search

203.2.3.1.2 Borrow or Excess Material States:

The plans shall designate commission furnished borrow areas for all projects where suitable borrow areas can be provided.

Is this correct? I thought the department had moved toward contractor furnished borrow.

--Martik2 13:06, 25 February 2009 (CST)


Sam Masters: You are correct. Presently, the department normally specifies contractor furnished borrow. 203.2.3.1.2 will be corrected (as will the "Borrow and Excess Material" article) to reflect this information.