Search results

Jump to navigation Jump to search

Page title matches

Page text matches

  • ...dance establishes procedures for the inspection, testing and acceptance of graded aggregate for bituminous surface.
    0 members (0 subcategories, 0 files) - 12:33, 1 October 2021
  • <categorytree mode=all>1001 General Requirements for Material</categorytree> <categorytree mode=all>1002 Aggregate for Asphaltic Concrete</categorytree>
    0 members (0 subcategories, 0 files) - 14:17, 17 July 2023
  • ...graded to the final elevation of the road, provides a stable base for the surface and allows water to drain from under the road without compromising the pave 3) Water to wet particles for observation.
    12 KB (1,727 words) - 07:27, 8 June 2021
  • ...ing]] procedures and reporting. This article also establishes requirements for acceptance of dust suppressant additives. ...verify that production is from the ledges as stated on the mix design. The aggregate inspector shall ensure that required sampling frequencies and testing proce
    0 members (0 subcategories, 0 files) - 08:56, 29 December 2021