<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://epg.modot.org/index.php?action=history&amp;feed=atom&amp;title=127.16_Wetland_and_Stream_Mitigation</id>
	<title>127.16 Wetland and Stream Mitigation - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://epg.modot.org/index.php?action=history&amp;feed=atom&amp;title=127.16_Wetland_and_Stream_Mitigation"/>
	<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;action=history"/>
	<updated>2026-05-07T02:51:35Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.3</generator>
	<entry>
		<id>https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=48171&amp;oldid=prev</id>
		<title>Smithk at 20:05, 18 August 2020</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=48171&amp;oldid=prev"/>
		<updated>2020-08-18T20:05:20Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 15:05, 18 August 2020&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l5&quot;&gt;Line 5:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 5:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|[http://library.modot.mo.gov/RDT/reports/UnNumbrd/ss07004.pdf Summary 2007]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|[http://library.modot.mo.gov/RDT/reports/UnNumbrd/ss07004.pdf Summary 2007]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|&#039;&#039;&#039;See also:&#039;&#039;&#039; [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;://www.modot.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;gov&lt;/del&gt;/&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;services/OR/byDate.htm Innovation Library&lt;/del&gt;]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|&#039;&#039;&#039;See also:&#039;&#039;&#039; [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;https&lt;/ins&gt;://www.modot.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;org&lt;/ins&gt;/&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;research-publications Research Publications&lt;/ins&gt;]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|}&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|}&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[127.4 Wetlands and Streams#127.4.1.2 Laws and Regulations| Section 404]] of the Clean Water Act permit compliance is dependent on MoDOT meeting the mitigation objectives defined in the permit.  MoDOT achieves these mitigation objectives through right of way acquisition, design, construction, and maintenance of wetland and stream mitigation sites.  The environmental specialist works with a variety of MoDOT personnel through these project stages to ensure that the mitigation sites are constructed to the prescribed design specifications and are preserved through protective covenants.  One option for wetland and stream mitigation is to construct  what is called a [[127.17 Wetland and Stream Mitigation Banking|wetland and/or stream bank]] before mitigation is needed for a specific project.  This is a valuable process that requires the establishment of agreements and review of the plan by the public.  Once the migitation bank is established it can be an effective and efficient way to achieve compliance with the Clean Water Act.   &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[127.4 Wetlands and Streams#127.4.1.2 Laws and Regulations| Section 404]] of the Clean Water Act permit compliance is dependent on MoDOT meeting the mitigation objectives defined in the permit.  MoDOT achieves these mitigation objectives through right of way acquisition, design, construction, and maintenance of wetland and stream mitigation sites.  The environmental specialist works with a variety of MoDOT personnel through these project stages to ensure that the mitigation sites are constructed to the prescribed design specifications and are preserved through protective covenants.  One option for wetland and stream mitigation is to construct  what is called a [[127.17 Wetland and Stream Mitigation Banking|wetland and/or stream bank]] before mitigation is needed for a specific project.  This is a valuable process that requires the establishment of agreements and review of the plan by the public.  Once the migitation bank is established it can be an effective and efficient way to achieve compliance with the Clean Water Act.   &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=47824&amp;oldid=prev</id>
		<title>Smithk: updated link</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=47824&amp;oldid=prev"/>
		<updated>2020-07-10T13:12:14Z</updated>

		<summary type="html">&lt;p&gt;updated link&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 08:12, 10 July 2020&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l15&quot;&gt;Line 15:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 15:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.2 Design==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.2 Design==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After [[&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;:Category:135 The Section 106 Process&lt;/del&gt;|Section 106]] clearance is obtained for cultural resources and a purchase agreement has been finalized with the landowner, a topographic survey of the property is requested, which may be conducted by MoDOT personnel or a consultant.  The environmental specialist specifies the components of the survey, which may include 6-inch contour intervals, existing ditches, levees/berms, flow line stream elevations, as well as any other topographic features that may be required for integration into the design.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After [[&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;127.2 Historic Preservation and Cultural Resources&lt;/ins&gt;|Section 106]] clearance is obtained for cultural resources and a purchase agreement has been finalized with the landowner, a topographic survey of the property is requested, which may be conducted by MoDOT personnel or a consultant.  The environmental specialist specifies the components of the survey, which may include 6-inch contour intervals, existing ditches, levees/berms, flow line stream elevations, as well as any other topographic features that may be required for integration into the design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Following completion of the topographic survey, the environmental specialist will coordinate with district design staff or consultant to convey the components of the mitigation plan that are to be integrated into the design.  This could include, but would not be limited to, water budget, installation of water control structures, berm construction, excavation for micro-topographic relief, re-vegetation planting plan, ditch plug construction, etc.  Any existing wetland, other biological feature, and/or cultural feature targeted for preservation within the wetland restoration footprint must be designated on the design plan.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Following completion of the topographic survey, the environmental specialist will coordinate with district design staff or consultant to convey the components of the mitigation plan that are to be integrated into the design.  This could include, but would not be limited to, water budget, installation of water control structures, berm construction, excavation for micro-topographic relief, re-vegetation planting plan, ditch plug construction, etc.  Any existing wetland, other biological feature, and/or cultural feature targeted for preservation within the wetland restoration footprint must be designated on the design plan.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=40493&amp;oldid=prev</id>
		<title>EPGsysop at 21:12, 8 March 2018</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=40493&amp;oldid=prev"/>
		<updated>2018-03-08T21:12:30Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 16:12, 8 March 2018&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l7&quot;&gt;Line 7:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 7:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|&amp;#039;&amp;#039;&amp;#039;See also:&amp;#039;&amp;#039;&amp;#039; [http://www.modot.gov/services/OR/byDate.htm Innovation Library]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|&amp;#039;&amp;#039;&amp;#039;See also:&amp;#039;&amp;#039;&amp;#039; [http://www.modot.gov/services/OR/byDate.htm Innovation Library]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|}&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|}&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[127.4 Wetlands and Streams#127.4.1.2 Laws and Regulations| Section 404]] of the Clean Water Act permit compliance is dependent on MoDOT meeting the mitigation objectives defined in the permit.  MoDOT achieves these mitigation objectives through right&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;-&lt;/del&gt;of&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;-&lt;/del&gt;way acquisition, design, construction, and maintenance of wetland and stream mitigation sites.  The environmental specialist works with a variety of MoDOT personnel through these project stages to ensure that the mitigation sites are constructed to the prescribed design specifications and are preserved through protective covenants.  One option for wetland and stream mitigation is to construct  what is called a [[127.17 Wetland and Stream Mitigation Banking|wetland and/or stream bank]] before mitigation is needed for a specific project.  This is a valuable process that requires the establishment of agreements and review of the plan by the public.  Once the migitation bank is established it can be an effective and efficient way to achieve compliance with the Clean Water Act.   &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[127.4 Wetlands and Streams#127.4.1.2 Laws and Regulations| Section 404]] of the Clean Water Act permit compliance is dependent on MoDOT meeting the mitigation objectives defined in the permit.  MoDOT achieves these mitigation objectives through right of way acquisition, design, construction, and maintenance of wetland and stream mitigation sites.  The environmental specialist works with a variety of MoDOT personnel through these project stages to ensure that the mitigation sites are constructed to the prescribed design specifications and are preserved through protective covenants.  One option for wetland and stream mitigation is to construct  what is called a [[127.17 Wetland and Stream Mitigation Banking|wetland and/or stream bank]] before mitigation is needed for a specific project.  This is a valuable process that requires the establishment of agreements and review of the plan by the public.  Once the migitation bank is established it can be an effective and efficient way to achieve compliance with the Clean Water Act.   &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.1  Right of Way Acquisition==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.1  Right of Way Acquisition==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>EPGsysop</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=36470&amp;oldid=prev</id>
		<title>Smithk: Per Envir&#039;l, minor clarification</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=36470&amp;oldid=prev"/>
		<updated>2015-12-02T16:39:16Z</updated>

		<summary type="html">&lt;p&gt;Per Envir&amp;#039;l, minor clarification&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 11:39, 2 December 2015&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l41&quot;&gt;Line 41:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 41:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.5  Reporting Requirements==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.5  Reporting Requirements==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Typically, the COE permit conditions stipulate a five-year monitoring commitment for the mitigation sites.  The environmental specialist submits a post-construction agency report annually for wetland and stream mitigation sites that are constructed as a requirement of the Section 404 permit.  The monitoring reports usually include an assessment of various criteria relating to vegetative survival (for grass seeding, tree and shrub planting), verification of the amount of each respective wetland type restored or created (i.e., emergent, scrub shrub, or forested wetland), and visual evidence demonstrating that the site is achieving the wetland hydrology parameters.  The monitoring report usually consists of a narrative description as well as a plant list summary and supporting photo-documentation.  If MoDOT demonstrates that the site is functional and has met the conditions of the permit at the end of the COE-designated monitoring period, then a request for final acceptance will be made to the COE.  Upon notification of final acceptance by the COE, no further reporting is required.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Typically, the COE permit conditions stipulate a &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;minimum &lt;/ins&gt;five-year monitoring commitment for the mitigation sites.  The environmental specialist submits a post-construction agency report annually for wetland and stream mitigation sites that are constructed as a requirement of the Section 404 permit.  The monitoring reports usually include an assessment of various criteria relating to vegetative survival (for grass seeding, tree and shrub planting), verification of the amount of each respective wetland type restored or created (i.e., emergent, scrub shrub, or forested wetland), and visual evidence demonstrating that the site is achieving the wetland hydrology parameters.  The monitoring report usually consists of a narrative description as well as a plant list summary and supporting photo-documentation.  If MoDOT demonstrates that the site is functional and has met the conditions of the permit at the end of the COE-designated monitoring period, then a request for final acceptance will be made to the COE.  Upon notification of final acceptance by the COE, no further reporting is required.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[category:127 MoDOT and the Environment]]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[category:127 MoDOT and the Environment]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=24102&amp;oldid=prev</id>
		<title>Smithk: /* 127.16.2 Design */ updated link</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=24102&amp;oldid=prev"/>
		<updated>2010-08-09T15:05:03Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;127.16.2 Design: &lt;/span&gt; updated link&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 10:05, 9 August 2010&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l15&quot;&gt;Line 15:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 15:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.2 Design==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.2 Design==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After [[The Section 106 Process|Section 106]] clearance is obtained for cultural resources and a purchase agreement has been finalized with the landowner, a topographic survey of the property is requested, which may be conducted by MoDOT personnel or a consultant.  The environmental specialist specifies the components of the survey, which may include 6-inch contour intervals, existing ditches, levees/berms, flow line stream elevations, as well as any other topographic features that may be required for integration into the design.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After [[&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;:Category:135 &lt;/ins&gt;The Section 106 Process|Section 106]] clearance is obtained for cultural resources and a purchase agreement has been finalized with the landowner, a topographic survey of the property is requested, which may be conducted by MoDOT personnel or a consultant.  The environmental specialist specifies the components of the survey, which may include 6-inch contour intervals, existing ditches, levees/berms, flow line stream elevations, as well as any other topographic features that may be required for integration into the design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Following completion of the topographic survey, the environmental specialist will coordinate with district design staff or consultant to convey the components of the mitigation plan that are to be integrated into the design.  This could include, but would not be limited to, water budget, installation of water control structures, berm construction, excavation for micro-topographic relief, re-vegetation planting plan, ditch plug construction, etc.  Any existing wetland, other biological feature, and/or cultural feature targeted for preservation within the wetland restoration footprint must be designated on the design plan.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Following completion of the topographic survey, the environmental specialist will coordinate with district design staff or consultant to convey the components of the mitigation plan that are to be integrated into the design.  This could include, but would not be limited to, water budget, installation of water control structures, berm construction, excavation for micro-topographic relief, re-vegetation planting plan, ditch plug construction, etc.  Any existing wetland, other biological feature, and/or cultural feature targeted for preservation within the wetland restoration footprint must be designated on the design plan.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=23308&amp;oldid=prev</id>
		<title>Smithk: /* 127.16.3 Construction */ updated link</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=23308&amp;oldid=prev"/>
		<updated>2010-06-28T16:11:17Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;127.16.3 Construction: &lt;/span&gt; updated link&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 11:11, 28 June 2010&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l29&quot;&gt;Line 29:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 29:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.3 Construction==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.3 Construction==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Communication is the key element in ensuring that mitigation project plans are successfully constructed.  If the contractor determines that on-site conditions necessitate deviation from the design plans, the [[105&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.2 &lt;/del&gt;Control of Work#105.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;2.1 Responsibilities &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the &lt;/del&gt;Resident Engineer|Resident Engineer]] (RE), who is primarily responsible for construction success, shall contact the appropriate environmental specialist before initiating the changes to determine whether they are allowable.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Communication is the key element in ensuring that mitigation project plans are successfully constructed.  If the contractor determines that on-site conditions necessitate deviation from the design plans, the [[&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;:category:&lt;/ins&gt;105 Control of Work#105.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;9 Authority and Duties &lt;/ins&gt;of Resident Engineer &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;(Sec 105.9)&lt;/ins&gt;|Resident Engineer]] (RE), who is primarily responsible for construction success, shall contact the appropriate environmental specialist before initiating the changes to determine whether they are allowable.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;A variety of factors contribute to successful wetland mitigation.  MoDOT has a list of lessons learned from constructing these projects.  Consequently, REs should pay special attention to proposals that change borrow volume and specified excavation limits, make unplanned impacts to existing wetland components within the design footprint, and substitute tree or plant species for the planned type(s).  Construction components that could negatively affect the as-built mitigation site include inadequate water control structure installation [wrong inlet/outlet elevation(s)] and inadequate seedbed preparation and/or seeding of constructed berms.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;A variety of factors contribute to successful wetland mitigation.  MoDOT has a list of lessons learned from constructing these projects.  Consequently, REs should pay special attention to proposals that change borrow volume and specified excavation limits, make unplanned impacts to existing wetland components within the design footprint, and substitute tree or plant species for the planned type(s).  Construction components that could negatively affect the as-built mitigation site include inadequate water control structure installation [wrong inlet/outlet elevation(s)] and inadequate seedbed preparation and/or seeding of constructed berms.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=20737&amp;oldid=prev</id>
		<title>Smithk: article construction</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=20737&amp;oldid=prev"/>
		<updated>2009-07-17T14:46:09Z</updated>

		<summary type="html">&lt;p&gt;article construction&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 09:46, 17 July 2009&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;==127.16.1  Introduction==&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{|style=&amp;quot;padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc&amp;quot; width=&amp;quot;210px&amp;quot; align=&amp;quot;right&amp;quot;  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{|style=&amp;quot;padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc&amp;quot; width=&amp;quot;210px&amp;quot; align=&amp;quot;right&amp;quot;  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l10&quot;&gt;Line 10:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 9:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[127.4 Wetlands and Streams#127.4.1.2 Laws and Regulations| Section 404]] of the Clean Water Act permit compliance is dependent on MoDOT meeting the mitigation objectives defined in the permit.  MoDOT achieves these mitigation objectives through right-of-way acquisition, design, construction, and maintenance of wetland and stream mitigation sites.  The environmental specialist works with a variety of MoDOT personnel through these project stages to ensure that the mitigation sites are constructed to the prescribed design specifications and are preserved through protective covenants.  One option for wetland and stream mitigation is to construct  what is called a [[127.17 Wetland and Stream Mitigation Banking|wetland and/or stream bank]] before mitigation is needed for a specific project.  This is a valuable process that requires the establishment of agreements and review of the plan by the public.  Once the migitation bank is established it can be an effective and efficient way to achieve compliance with the Clean Water Act.   &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[127.4 Wetlands and Streams#127.4.1.2 Laws and Regulations| Section 404]] of the Clean Water Act permit compliance is dependent on MoDOT meeting the mitigation objectives defined in the permit.  MoDOT achieves these mitigation objectives through right-of-way acquisition, design, construction, and maintenance of wetland and stream mitigation sites.  The environmental specialist works with a variety of MoDOT personnel through these project stages to ensure that the mitigation sites are constructed to the prescribed design specifications and are preserved through protective covenants.  One option for wetland and stream mitigation is to construct  what is called a [[127.17 Wetland and Stream Mitigation Banking|wetland and/or stream bank]] before mitigation is needed for a specific project.  This is a valuable process that requires the establishment of agreements and review of the plan by the public.  Once the migitation bank is established it can be an effective and efficient way to achieve compliance with the Clean Water Act.   &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;=&lt;/del&gt;==127.16&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.1&lt;/del&gt;.1  Right of Way Acquisition&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;=&lt;/del&gt;==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.1  Right of Way Acquisition==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The initial search for wetland and stream mitigation is usually coordinated through the respective district Right of Way office.  These personnel assist the environmental specialist by approaching prospective landowners who might be interested in selling land that could be used for mitigation.  Some past success in locating prospective mitigation land has been realized through newspaper advertisement.  To initiate this approach, the environmental specialist should contact the district community relations manager.  Prior to purchasing the property, the environmental specialist contacts Historic Preservation to conduct a cultural resources survey of the site.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The initial search for wetland and stream mitigation is usually coordinated through the respective district Right of Way office.  These personnel assist the environmental specialist by approaching prospective landowners who might be interested in selling land that could be used for mitigation.  Some past success in locating prospective mitigation land has been realized through newspaper advertisement.  To initiate this approach, the environmental specialist should contact the district community relations manager.  Prior to purchasing the property, the environmental specialist contacts Historic Preservation to conduct a cultural resources survey of the site.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;=&lt;/del&gt;==127.16&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.1&lt;/del&gt;.2	Design&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;=&lt;/del&gt;==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.2 Design==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After [[The Section 106 Process|Section 106]] clearance is obtained for cultural resources and a purchase agreement has been finalized with the landowner, a topographic survey of the property is requested, which may be conducted by MoDOT personnel or a consultant.  The environmental specialist specifies the components of the survey, which may include 6-inch contour intervals, existing ditches, levees/berms, flow line stream elevations, as well as any other topographic features that may be required for integration into the design.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After [[The Section 106 Process|Section 106]] clearance is obtained for cultural resources and a purchase agreement has been finalized with the landowner, a topographic survey of the property is requested, which may be conducted by MoDOT personnel or a consultant.  The environmental specialist specifies the components of the survey, which may include 6-inch contour intervals, existing ditches, levees/berms, flow line stream elevations, as well as any other topographic features that may be required for integration into the design.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l28&quot;&gt;Line 28:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 27:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;6) planting and/or seeding plan&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;6) planting and/or seeding plan&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;=&lt;/del&gt;==127.16&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.1&lt;/del&gt;.3 &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; &lt;/del&gt;Construction&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;=&lt;/del&gt;==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.3 Construction==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Communication is the key element in ensuring that mitigation project plans are successfully constructed.  If the contractor determines that on-site conditions necessitate deviation from the design plans, the [[105.2 Control of Work#105.2.1 Responsibilities of the Resident Engineer|Resident Engineer]] (RE), who is primarily responsible for construction success, shall contact the appropriate environmental specialist before initiating the changes to determine whether they are allowable.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Communication is the key element in ensuring that mitigation project plans are successfully constructed.  If the contractor determines that on-site conditions necessitate deviation from the design plans, the [[105.2 Control of Work#105.2.1 Responsibilities of the Resident Engineer|Resident Engineer]] (RE), who is primarily responsible for construction success, shall contact the appropriate environmental specialist before initiating the changes to determine whether they are allowable.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l36&quot;&gt;Line 36:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 35:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The construction contract will include installation of signs to protect mitigation in the future.  The environmental specialist is responsible for ensuring that construction personnel (i.e., construction inspectors) are clearly shown the locations for sign installation.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The construction contract will include installation of signs to protect mitigation in the future.  The environmental specialist is responsible for ensuring that construction personnel (i.e., construction inspectors) are clearly shown the locations for sign installation.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;=&lt;/del&gt;==127.16&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.1&lt;/del&gt;.4  Maintenance&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;=&lt;/del&gt;==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.4  Maintenance==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If constructed as designed, most MoDOT wetland mitigation sites require little maintenance.  Because many of these areas are constructed either within or adjacent to MoDOT right of way, protection from encroachment is the major concern.  Site boundary signs are posted to ensure that no harmful activities such as mowing, spraying, or filling are undertaken.  Tree planting and berm repair constitute the primary maintenance requirements for previously completed sites.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If constructed as designed, most MoDOT wetland mitigation sites require little maintenance.  Because many of these areas are constructed either within or adjacent to MoDOT right of way, protection from encroachment is the major concern.  Site boundary signs are posted to ensure that no harmful activities such as mowing, spraying, or filling are undertaken.  Tree planting and berm repair constitute the primary maintenance requirements for previously completed sites.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;=&lt;/del&gt;==127.16&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.1&lt;/del&gt;.5  Reporting Requirements&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;=&lt;/del&gt;==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.5  Reporting Requirements==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Typically, the COE permit conditions stipulate a five-year monitoring commitment for the mitigation sites.  The environmental specialist submits a post-construction agency report annually for wetland and stream mitigation sites that are constructed as a requirement of the Section 404 permit.  The monitoring reports usually include an assessment of various criteria relating to vegetative survival (for grass seeding, tree and shrub planting), verification of the amount of each respective wetland type restored or created (i.e., emergent, scrub shrub, or forested wetland), and visual evidence demonstrating that the site is achieving the wetland hydrology parameters.  The monitoring report usually consists of a narrative description as well as a plant list summary and supporting photo-documentation.  If MoDOT demonstrates that the site is functional and has met the conditions of the permit at the end of the COE-designated monitoring period, then a request for final acceptance will be made to the COE.  Upon notification of final acceptance by the COE, no further reporting is required.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Typically, the COE permit conditions stipulate a five-year monitoring commitment for the mitigation sites.  The environmental specialist submits a post-construction agency report annually for wetland and stream mitigation sites that are constructed as a requirement of the Section 404 permit.  The monitoring reports usually include an assessment of various criteria relating to vegetative survival (for grass seeding, tree and shrub planting), verification of the amount of each respective wetland type restored or created (i.e., emergent, scrub shrub, or forested wetland), and visual evidence demonstrating that the site is achieving the wetland hydrology parameters.  The monitoring report usually consists of a narrative description as well as a plant list summary and supporting photo-documentation.  If MoDOT demonstrates that the site is functional and has met the conditions of the permit at the end of the COE-designated monitoring period, then a request for final acceptance will be made to the COE.  Upon notification of final acceptance by the COE, no further reporting is required.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[category:127 MoDOT and the Environment]]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[category:127 MoDOT and the Environment]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=19961&amp;oldid=prev</id>
		<title>Smithk: link to Innovation Library</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=19961&amp;oldid=prev"/>
		<updated>2009-03-30T19:36:43Z</updated>

		<summary type="html">&lt;p&gt;link to Innovation Library&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 14:36, 30 March 2009&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.1  Introduction==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.1  Introduction==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;{|style=&quot;padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc&quot; width=&quot;210px&quot; align=&quot;right&quot; &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|-&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|&#039;&#039;&#039;Wetlands and Property Values&#039;&#039;&#039;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|-&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|[http://library.modot.mo.gov/RDT/reports/UnNumbrd/ss07004.pdf Summary 2007]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|-&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|&#039;&#039;&#039;See also:&#039;&#039;&#039; [http://www.modot.gov/services/OR/byDate.htm Innovation Library]&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|}&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[127.4 Wetlands and Streams#127.4.1.2 Laws and Regulations| Section 404]] of the Clean Water Act permit compliance is dependent on MoDOT meeting the mitigation objectives defined in the permit.  MoDOT achieves these mitigation objectives through right-of-way acquisition, design, construction, and maintenance of wetland and stream mitigation sites.  The environmental specialist works with a variety of MoDOT personnel through these project stages to ensure that the mitigation sites are constructed to the prescribed design specifications and are preserved through protective covenants.  One option for wetland and stream mitigation is to construct  what is called a [[127.17 Wetland and Stream Mitigation Banking|wetland and/or stream bank]] before mitigation is needed for a specific project.  This is a valuable process that requires the establishment of agreements and review of the plan by the public.  Once the migitation bank is established it can be an effective and efficient way to achieve compliance with the Clean Water Act.   &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[127.4 Wetlands and Streams#127.4.1.2 Laws and Regulations| Section 404]] of the Clean Water Act permit compliance is dependent on MoDOT meeting the mitigation objectives defined in the permit.  MoDOT achieves these mitigation objectives through right-of-way acquisition, design, construction, and maintenance of wetland and stream mitigation sites.  The environmental specialist works with a variety of MoDOT personnel through these project stages to ensure that the mitigation sites are constructed to the prescribed design specifications and are preserved through protective covenants.  One option for wetland and stream mitigation is to construct  what is called a [[127.17 Wetland and Stream Mitigation Banking|wetland and/or stream bank]] before mitigation is needed for a specific project.  This is a valuable process that requires the establishment of agreements and review of the plan by the public.  Once the migitation bank is established it can be an effective and efficient way to achieve compliance with the Clean Water Act.   &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=18957&amp;oldid=prev</id>
		<title>EPG-Admin: remove &quot;Key Points&quot; box</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=18957&amp;oldid=prev"/>
		<updated>2008-11-13T16:33:30Z</updated>

		<summary type="html">&lt;p&gt;remove &amp;quot;Key Points&amp;quot; box&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 11:33, 13 November 2008&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;{|border=&quot;4&quot; &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|-style=&quot;background:yellow&quot;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|&#039;&#039;&#039;[[Key Points 127.16 Wetland and Stream Mitigation| Key Points]]&#039;&#039;&#039;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|}&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.1  Introduction==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==127.16.1  Introduction==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>EPG-Admin</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=17410&amp;oldid=prev</id>
		<title>EPG-Admin: provide a link to &quot;duties of the resident engineer&quot;</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=127.16_Wetland_and_Stream_Mitigation&amp;diff=17410&amp;oldid=prev"/>
		<updated>2008-03-12T19:23:14Z</updated>

		<summary type="html">&lt;p&gt;provide a link to &amp;quot;duties of the resident engineer&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;{|border=&amp;quot;4&amp;quot; &lt;br /&gt;
|-style=&amp;quot;background:yellow&amp;quot;&lt;br /&gt;
|&amp;#039;&amp;#039;&amp;#039;[[Key Points 127.16 Wetland and Stream Mitigation| Key Points]]&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
|}&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==127.16.1  Introduction==&lt;br /&gt;
&lt;br /&gt;
[[127.4 Wetlands and Streams#127.4.1.2 Laws and Regulations| Section 404]] of the Clean Water Act permit compliance is dependent on MoDOT meeting the mitigation objectives defined in the permit.  MoDOT achieves these mitigation objectives through right-of-way acquisition, design, construction, and maintenance of wetland and stream mitigation sites.  The environmental specialist works with a variety of MoDOT personnel through these project stages to ensure that the mitigation sites are constructed to the prescribed design specifications and are preserved through protective covenants.  One option for wetland and stream mitigation is to construct  what is called a [[127.17 Wetland and Stream Mitigation Banking|wetland and/or stream bank]] before mitigation is needed for a specific project.  This is a valuable process that requires the establishment of agreements and review of the plan by the public.  Once the migitation bank is established it can be an effective and efficient way to achieve compliance with the Clean Water Act.  &lt;br /&gt;
&lt;br /&gt;
===127.16.1.1  Right of Way Acquisition===&lt;br /&gt;
&lt;br /&gt;
The initial search for wetland and stream mitigation is usually coordinated through the respective district Right of Way office.  These personnel assist the environmental specialist by approaching prospective landowners who might be interested in selling land that could be used for mitigation.  Some past success in locating prospective mitigation land has been realized through newspaper advertisement.  To initiate this approach, the environmental specialist should contact the district community relations manager.  Prior to purchasing the property, the environmental specialist contacts Historic Preservation to conduct a cultural resources survey of the site.&lt;br /&gt;
&lt;br /&gt;
===127.16.1.2	Design===&lt;br /&gt;
&lt;br /&gt;
After [[The Section 106 Process|Section 106]] clearance is obtained for cultural resources and a purchase agreement has been finalized with the landowner, a topographic survey of the property is requested, which may be conducted by MoDOT personnel or a consultant.  The environmental specialist specifies the components of the survey, which may include 6-inch contour intervals, existing ditches, levees/berms, flow line stream elevations, as well as any other topographic features that may be required for integration into the design.&lt;br /&gt;
&lt;br /&gt;
Following completion of the topographic survey, the environmental specialist will coordinate with district design staff or consultant to convey the components of the mitigation plan that are to be integrated into the design.  This could include, but would not be limited to, water budget, installation of water control structures, berm construction, excavation for micro-topographic relief, re-vegetation planting plan, ditch plug construction, etc.  Any existing wetland, other biological feature, and/or cultural feature targeted for preservation within the wetland restoration footprint must be designated on the design plan.&lt;br /&gt;
&lt;br /&gt;
The environmental specialist submits the draft wetland mitigation plan to the U.S. Army Corps of Engineers (COE) for their review.  If the COE provides any comments relating to integration of certain features into the design, the final plan will reflect those changes.  The final design typically includes the following elements:&lt;br /&gt;
1) plan view of the proposed wetland mitigation design&lt;br /&gt;
2) typical cross sections of the berm/levee&lt;br /&gt;
3) emergency spillway elevations and design specifications&lt;br /&gt;
4) water control structure elevation&lt;br /&gt;
5) inlet and outlet pipe (composition and elevations)&lt;br /&gt;
6) planting and/or seeding plan&lt;br /&gt;
&lt;br /&gt;
===127.16.1.3  Construction===&lt;br /&gt;
&lt;br /&gt;
Communication is the key element in ensuring that mitigation project plans are successfully constructed.  If the contractor determines that on-site conditions necessitate deviation from the design plans, the [[105.2 Control of Work#105.2.1 Responsibilities of the Resident Engineer|Resident Engineer]] (RE), who is primarily responsible for construction success, shall contact the appropriate environmental specialist before initiating the changes to determine whether they are allowable.&lt;br /&gt;
&lt;br /&gt;
A variety of factors contribute to successful wetland mitigation.  MoDOT has a list of lessons learned from constructing these projects.  Consequently, REs should pay special attention to proposals that change borrow volume and specified excavation limits, make unplanned impacts to existing wetland components within the design footprint, and substitute tree or plant species for the planned type(s).  Construction components that could negatively affect the as-built mitigation site include inadequate water control structure installation [wrong inlet/outlet elevation(s)] and inadequate seedbed preparation and/or seeding of constructed berms.&lt;br /&gt;
&lt;br /&gt;
The construction contract will include installation of signs to protect mitigation in the future.  The environmental specialist is responsible for ensuring that construction personnel (i.e., construction inspectors) are clearly shown the locations for sign installation.&lt;br /&gt;
&lt;br /&gt;
===127.16.1.4  Maintenance===&lt;br /&gt;
&lt;br /&gt;
If constructed as designed, most MoDOT wetland mitigation sites require little maintenance.  Because many of these areas are constructed either within or adjacent to MoDOT right of way, protection from encroachment is the major concern.  Site boundary signs are posted to ensure that no harmful activities such as mowing, spraying, or filling are undertaken.  Tree planting and berm repair constitute the primary maintenance requirements for previously completed sites.&lt;br /&gt;
&lt;br /&gt;
===127.16.1.5  Reporting Requirements===&lt;br /&gt;
&lt;br /&gt;
Typically, the COE permit conditions stipulate a five-year monitoring commitment for the mitigation sites.  The environmental specialist submits a post-construction agency report annually for wetland and stream mitigation sites that are constructed as a requirement of the Section 404 permit.  The monitoring reports usually include an assessment of various criteria relating to vegetative survival (for grass seeding, tree and shrub planting), verification of the amount of each respective wetland type restored or created (i.e., emergent, scrub shrub, or forested wetland), and visual evidence demonstrating that the site is achieving the wetland hydrology parameters.  The monitoring report usually consists of a narrative description as well as a plant list summary and supporting photo-documentation.  If MoDOT demonstrates that the site is functional and has met the conditions of the permit at the end of the COE-designated monitoring period, then a request for final acceptance will be made to the COE.  Upon notification of final acceptance by the COE, no further reporting is required.&lt;br /&gt;
[[category:127 MoDOT and the Environment]]&lt;/div&gt;</summary>
		<author><name>EPG-Admin</name></author>
	</entry>
</feed>