<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://epg.modot.org/index.php?action=history&amp;feed=atom&amp;title=236.14_Change_in_Route_Status_Report</id>
	<title>236.14 Change in Route Status Report - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://epg.modot.org/index.php?action=history&amp;feed=atom&amp;title=236.14_Change_in_Route_Status_Report"/>
	<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;action=history"/>
	<updated>2026-05-04T17:00:48Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.42.3</generator>
	<entry>
		<id>https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=56806&amp;oldid=prev</id>
		<title>Hoskir: /* 236.14.6 Roadway Relinquishment Agreement */ updated per RR4112</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=56806&amp;oldid=prev"/>
		<updated>2025-10-20T14:09:57Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;236.14.6 Roadway Relinquishment Agreement: &lt;/span&gt; updated per RR4112&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 09:09, 20 October 2025&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l150&quot;&gt;Line 150:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 150:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Any commitments or promises made by either party that constitute a condition of acceptance of the existing roadway must be fully detailed in the agreement. These conditions of acceptance might include upgrading the road to a certain condition prior to transfer or future state maintenance of the section at a specified time period. It is important to note that this agreement will be developed through a process of negotiations resulting in an agreement that is mutually beneficial to both parties. Each case will have unique conditions that will need to be considered during the negotiation of the relinquishment agreement. The district will consider all requests from the party receiving the section of the existing roadway that will minimize the burden of ownership and future maintenance. However, the cost associated with any conditions of acceptance must be compared to the benefit MoDOT will receive from the transfer of the existing roadway. Any conditions of acceptance that cannot be shown to be cost effective for MoDOT will not be accepted.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Any commitments or promises made by either party that constitute a condition of acceptance of the existing roadway must be fully detailed in the agreement. These conditions of acceptance might include upgrading the road to a certain condition prior to transfer or future state maintenance of the section at a specified time period. It is important to note that this agreement will be developed through a process of negotiations resulting in an agreement that is mutually beneficial to both parties. Each case will have unique conditions that will need to be considered during the negotiation of the relinquishment agreement. The district will consider all requests from the party receiving the section of the existing roadway that will minimize the burden of ownership and future maintenance. However, the cost associated with any conditions of acceptance must be compared to the benefit MoDOT will receive from the transfer of the existing roadway. Any conditions of acceptance that cannot be shown to be cost effective for MoDOT will not be accepted.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;In situations where a roadway will be conveyed to a local government agency with the intent for the road to remain a public right of way, the Road Relinquishment Agreement and conveyance deed should include the following reversionary clause:&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;:&#039;&#039;The (agency) shall be prohibited from abandoning or conveying any or all the (Route) right of way, which is the subject of this conveyance. In the event of such an abandonment or attempted conveyance by the (agency), then in such event, the conveyance by the Missouri Highways and Transportation Commission to the (agency) by this quitclaim deed, shall be null and void and all of the area herein conveyed shall revert and vest immediately to the Missouri Highways and Transportation Commission.&#039;&#039;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If a roadway will be relinquished to a local public transportation authority, with the intent that it continues to be used as a public roadway, the Road Relinquishment Agreement shall include the following clause:&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;:&#039;&#039;This conveyance includes all appurtenances and easements benefitting the property herein conveyed.&#039;&#039;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If the roadway conveyance includes excess land classified “right of way” of the roadway, then the roadway and excess land are required to be surveyed separately, and the excess land be conveyed separately.  The conveyance transaction will be contingent upon Central Office ROW’s approval.  &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The requirements for proper execution of the agreement will depend on the party receiving the existing roadway. If the accepting agency is a county commission, the agreement is to be executed by at least two of the county commissioners. If the accepting agency is a city, a copy of the ordinance or resolution authorizing execution of the agreement must be attached. Only the authorized party can execute the agreement. If an adjacent property owner is the recipient, the agreement only needs to be executed by the future owner. In any case, the execution of the roadway relinquishment agreement must be obtained from the other parties before the project is advertised for the bid opening. The Commission&amp;#039;s Execution of Documents Policy is reviewed to determine the proper party authorized to execute the agreement on behalf of the commission.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The requirements for proper execution of the agreement will depend on the party receiving the existing roadway. If the accepting agency is a county commission, the agreement is to be executed by at least two of the county commissioners. If the accepting agency is a city, a copy of the ordinance or resolution authorizing execution of the agreement must be attached. Only the authorized party can execute the agreement. If an adjacent property owner is the recipient, the agreement only needs to be executed by the future owner. In any case, the execution of the roadway relinquishment agreement must be obtained from the other parties before the project is advertised for the bid opening. The Commission&amp;#039;s Execution of Documents Policy is reviewed to determine the proper party authorized to execute the agreement on behalf of the commission.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If a roadway will be relinquished to a local public transportation authority, with the intent that it continues to be used as a public roadway, the Road Relinquishment Agreement shall include the following clause: “This conveyance includes all appurtenances and easements benefitting the property herein conveyed”. &lt;/del&gt;See [[236.5 Property Management#236.5.12.2 Road Relinquishment Utilities|EPG 236.5.12.2 Road Relinquishment Utilities]] for further guidance.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;See [[236.5 Property Management#236.5.12.2 Road Relinquishment Utilities|EPG 236.5.12.2 Road Relinquishment Utilities]] for further guidance.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Proposed roadway relinquishments to private entities shall be reviewed in a manner consistent with the conveyance of excess property described in [[236.5 Property Management#236.5.12.1 Excess Land Conveyances Utilities|EPG 236.5.12.1 Excess Land Conveyances Utilities]].&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Proposed roadway relinquishments to private entities shall be reviewed in a manner consistent with the conveyance of excess property described in [[236.5 Property Management#236.5.12.1 Excess Land Conveyances Utilities|EPG 236.5.12.1 Excess Land Conveyances Utilities]].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Hoskir</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=56805&amp;oldid=prev</id>
		<title>Hoskir: /* 236.14.2.1 Convey to Local Government Agency (CRSR required) */ updated per RR4112</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=56805&amp;oldid=prev"/>
		<updated>2025-10-20T14:07:21Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;236.14.2.1 Convey to Local Government Agency (CRSR required): &lt;/span&gt; updated per RR4112&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 09:07, 20 October 2025&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l46&quot;&gt;Line 46:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 46:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===236.14.2.1 Convey to Local Government Agency (CRSR required)===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===236.14.2.1 Convey to Local Government Agency (CRSR required)===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Sections of the existing route that need to remain in place to serve local public interests will be identified in the location/environmental study or conceptual study report. These sections may be conveyed to the appropriate local government agency, which is capable of accepting a deed for the right of way. Upon approval of the CRSR by the Chief Engineer or designee, indicating the section of roadway to be transferred to another government agency, a roadway relinquishment agreement must be prepared. The preferred method of transfer is by quitclaim deed to the local government agency. However, the specific method of transfer and other details must be indicated in the agreement. Execution of the roadway relinquishment agreement must be obtained from the local government agencies before the project is advertised for the bid opening. Guidelines for the preparation of the [[236.14 Change in Route Status Report#236.14.6 Roadway Relinquishment Agreement|roadway relinquishment agreement]] are detailed later in this article.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Sections of the existing route that need to remain in place to serve local public interests &lt;/del&gt;will &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;be identified in the location/environmental study or conceptual study report.  These sections may &lt;/del&gt;be conveyed to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the appropriate &lt;/del&gt;local government agency&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;, which is capable of accepting a deed &lt;/del&gt;for the right of way&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;.  Upon approval of &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;CRSR by &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Chief Engineer &lt;/del&gt;or &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;designee&lt;/del&gt;, &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;indicating &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;section &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;roadway to be transferred to another government agency, a roadway relinquishment agreement must be prepared&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;The preferred method &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;transfer is &lt;/del&gt;by &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;quitclaim deed to &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;local government agency. However&lt;/del&gt;, the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;specific method of transfer &lt;/del&gt;and &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;other details must &lt;/del&gt;be &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;indicated in the agreement.  Execution &lt;/del&gt;of the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;roadway relinquishment agreement must be obtained from &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;local government agencies before the project is advertised for the bid opening.  Guidelines for the preparation of the [[236.14 Change in Route Status Report#236.14.6 Roadway Relinquishment Agreement|roadway relinquishment agreement]] are detailed later in this article&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;In situations where a roadway &lt;/ins&gt;will be conveyed to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;a &lt;/ins&gt;local government agency &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;with the intent &lt;/ins&gt;for the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;road remain a public &lt;/ins&gt;right of way the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Road Relinquishment Agreement and conveyance deed should include &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;following reversionary clause: &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;:&amp;lt;i&amp;gt;The (City/County) shall be prohibited from abandoning or conveying any &lt;/ins&gt;or &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;all the (Route) right of way&lt;/ins&gt;, &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;which is &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;subject &lt;/ins&gt;of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;this conveyance&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;In the event &lt;/ins&gt;of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;such an abandonment or attempted conveyance &lt;/ins&gt;by the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;(City/County), then in such event&lt;/ins&gt;, the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;conveyance by the Missouri Highways &lt;/ins&gt;and &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Transportation Commission to the (City/County) by this quitclaim deed, shall &lt;/ins&gt;be &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;null and void and all &lt;/ins&gt;of the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;area herein conveyed shall revert and vest immediately to &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Missouri Highways and Transportation Commission&lt;/ins&gt;.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;/i&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;When a &lt;/del&gt;roadway &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;is conveyed to a local government with the intention to leave as public right of way the &lt;/del&gt;conveyance &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;deed should include the following reversionary clause: &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If the &lt;/ins&gt;roadway conveyance &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;includes excess land classified “right &lt;/ins&gt;of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;way” &lt;/ins&gt;of the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;roadway&lt;/ins&gt;, then the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;roadway &lt;/ins&gt;and &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;excess land are required &lt;/ins&gt;to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;be surveyed separately&lt;/ins&gt;, and the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;excess land be &lt;/ins&gt;conveyed &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;separately. The conveyance transaction will be contingent upon Central Office ROW’s approval&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;::&amp;lt;i&amp;gt;The (City/County) shall be prohibited from abandoning or conveying any or all the (Route) right &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;way, which is the subject &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;this conveyance.  In &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;event of such an abandonment or attempted conveyance by the (City/County)&lt;/del&gt;, then &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;in such event, &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;conveyance by the Missouri Highways &lt;/del&gt;and &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Transportation Commission &lt;/del&gt;to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the (City/County) by this quitclaim deed&lt;/del&gt;, &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;shall be null and void &lt;/del&gt;and &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;all of &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;area herein &lt;/del&gt;conveyed &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;shall revert and vest immediately to the Missouri Highways and Transportation Commission&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;/i&amp;gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===236.14.2.2 Trade routes with Local Government Agency (CRSR required)===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===236.14.2.2 Trade routes with Local Government Agency (CRSR required)===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Hoskir</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=55044&amp;oldid=prev</id>
		<title>Hoskir: /* 236.14.6 Roadway Relinquishment Agreement */ updated per RR4004</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=55044&amp;oldid=prev"/>
		<updated>2025-02-18T15:04:08Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;236.14.6 Roadway Relinquishment Agreement: &lt;/span&gt; updated per RR4004&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 10:04, 18 February 2025&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l146&quot;&gt;Line 146:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 146:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==236.14.6 Roadway Relinquishment Agreement==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==236.14.6 Roadway Relinquishment Agreement==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;A roadway relinquishment agreement will need to be prepared for any sections of the existing route that will be conveyed to other owners. A standard form agreement named Form RW27 has been prepared by the Chief Counsel&#039;s Office as a basis to develop the agreement. Form RW27 is accessible in [https://netprod3.dot.missouri/eAgreements/Admin/TemplateAdmin eAgreements]. Any modifications to the standard language must be approved by the Chief Counsel&#039;s Office prior to execution.&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;A &lt;/del&gt;roadway &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;relinquishment &lt;/del&gt;agreement &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;will need &lt;/del&gt;to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;be prepared for any sections &lt;/del&gt;of the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;existing route &lt;/del&gt;that will be &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;conveyed &lt;/del&gt;to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;other owners&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; A standard form agreement named Form RW27 has been prepared by &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Chief Counsel&#039;s Office as a basis to develop &lt;/del&gt;the agreement. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; Form RW27 is accessible in [http://sp/sites/eagreements/SitePages/Home&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;aspx eAgreements]. Any modifications to &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;standard language &lt;/del&gt;must be &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;approved by &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Chief Counsel&#039;s Office prior &lt;/del&gt;to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;execution&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Any commitments or promises made by either party that constitute a condition of acceptance of the existing &lt;/ins&gt;roadway &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;must be fully detailed in the &lt;/ins&gt;agreement&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;. These conditions of acceptance might include upgrading the road to a certain condition prior &lt;/ins&gt;to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;transfer or future state maintenance &lt;/ins&gt;of the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;section at a specified time period. It is important to note &lt;/ins&gt;that &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;this agreement &lt;/ins&gt;will be &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;developed through a process of negotiations resulting in an agreement that is mutually beneficial &lt;/ins&gt;to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;both parties&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Each case will have unique conditions that will need to be considered during &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;negotiation of &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;relinquishment &lt;/ins&gt;agreement. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;The district will consider all requests from the party receiving the section of the existing roadway that will minimize the burden of ownership and future maintenance&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;However, &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;cost associated with any conditions of acceptance &lt;/ins&gt;must be &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;compared to the benefit MoDOT will receive from the transfer of &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;existing roadway. Any conditions of acceptance that cannot be shown &lt;/ins&gt;to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;be cost effective for MoDOT will not be accepted&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Any commitments or promises made by either &lt;/del&gt;party &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;that constitute a condition of acceptance of &lt;/del&gt;the existing roadway &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;must be fully detailed in the agreement&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; These conditions of acceptance might include upgrading &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;road to &lt;/del&gt;a &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;certain condition prior &lt;/del&gt;to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;transfer or future state maintenance &lt;/del&gt;of the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;section at a specified time period&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; It &lt;/del&gt;is &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;important to note that this agreement will be developed through &lt;/del&gt;a &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;process &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;negotiations resulting in an agreement that is mutually beneficial to both parties.  Each case will have unique conditions that will need to be considered during &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;negotiation &lt;/del&gt;of the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;relinquishment &lt;/del&gt;agreement. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; The district will consider all requests from &lt;/del&gt;the party &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;receiving &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;section of &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;existing roadway that will minimize &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;burden of ownership and &lt;/del&gt;future &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;maintenance&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; However&lt;/del&gt;, the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;cost associated with any conditions &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;acceptance &lt;/del&gt;must be &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;compared to &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;benefit MoDOT will receive from &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;transfer of &lt;/del&gt;the &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;existing roadway&lt;/del&gt;. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; Any conditions &lt;/del&gt;of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;acceptance that cannot be shown &lt;/del&gt;to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;be cost effective for MoDOT will not be accepted&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;The requirements for proper execution of the agreement will depend on the &lt;/ins&gt;party &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;receiving &lt;/ins&gt;the existing roadway. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;accepting agency is &lt;/ins&gt;a &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;county commission, the agreement is &lt;/ins&gt;to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;be executed by at least two &lt;/ins&gt;of the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;county commissioners&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;If the accepting agency &lt;/ins&gt;is a &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;city, a copy &lt;/ins&gt;of the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;ordinance or resolution authorizing execution &lt;/ins&gt;of the agreement &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;must be attached&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Only &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;authorized &lt;/ins&gt;party &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;can execute the agreement. If an adjacent property owner is &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;recipient, &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;agreement only needs to be executed by &lt;/ins&gt;the future &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;owner&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;In any case&lt;/ins&gt;, the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;execution &lt;/ins&gt;of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the roadway relinquishment agreement &lt;/ins&gt;must be &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;obtained from &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;other parties before &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;project is advertised for &lt;/ins&gt;the &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;bid opening&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;The Commission&#039;s Execution &lt;/ins&gt;of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Documents Policy is reviewed to determine the proper party authorized &lt;/ins&gt;to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;execute the agreement on behalf of the commission&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;The requirements for proper execution of the agreement will depend on the party receiving the existing roadway.  If the accepting agency is a county commission, the agreement is to be executed by at least two of the county commissioners.  If the accepting agency is a city, a copy of the ordinance or resolution authorizing execution of the agreement must be attached.  Only the authorized party can execute the agreement.  If an adjacent property owner is the recipient, the agreement only needs to be executed by the future owner.  In any case, the execution of the roadway relinquishment agreement must be obtained from the other parties before the project is advertised for the bid opening.  The Commission&#039;s Execution of Documents Policy is reviewed to determine the proper party authorized to execute the agreement on behalf of the commission.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If a roadway will be relinquished to a local public transportation authority, with the intent that it continues to be used as a public roadway, &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the Road Relinquishment Agreement shall include the following clause: “This conveyance includes all appurtenances and easements benefitting the property herein conveyed”. See &lt;/ins&gt;[[236.5 Property Management#236.5.12.2 Road Relinquishment Utilities|EPG 236.5.12.2 Road Relinquishment Utilities]] for further guidance.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If a roadway will be relinquished to a local public transportation authority, with the intent that it continues to be used as a public roadway, &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;see &lt;/del&gt;[[236.5 Property Management#236.5.12.2 Road Relinquishment Utilities|EPG 236.5.12.2 Road Relinquishment Utilities]] for further guidance.&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Proposed roadway relinquishments to private entities shall be reviewed in a manner consistent with the conveyance of excess property described in [[236.5 Property Management#236.5.12.1 Excess Land Conveyances Utilities|EPG 236.5.12.1 Excess Land Conveyances Utilities]].&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Proposed roadway relinquishments to private entities shall be reviewed in a manner consistent with the conveyance of excess property described in [[236.5 Property Management#236.5.12.1 Excess Land Conveyances Utilities|EPG 236.5.12.1 Excess Land Conveyances Utilities]].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Hoskir</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=53048&amp;oldid=prev</id>
		<title>Hoskir: /* 236.14.2.1 Convey to Local Government Agency (CRSR required) */ fixed minor word error in last sentence</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=53048&amp;oldid=prev"/>
		<updated>2023-10-25T19:51:48Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;236.14.2.1 Convey to Local Government Agency (CRSR required): &lt;/span&gt; fixed minor word error in last sentence&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 14:51, 25 October 2023&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l50&quot;&gt;Line 50:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 50:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;When a roadway is conveyed to a local government with the intention to leave as public right of way the conveyance deed should include the following reversionary clause:  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;When a roadway is conveyed to a local government with the intention to leave as public right of way the conveyance deed should include the following reversionary clause:  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;::&amp;lt;i&amp;gt;The (City/County) shall be prohibited from abandoning or conveying any or all the (Route) right of way, which is the subject of this conveyance.  In the event of such an abandonment or attempted conveyance by the (City/County), then &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;is &lt;/del&gt;such event, the conveyance by the Missouri Highways and Transportation Commission to the (City/County) by this quitclaim deed, shall be null and void and all of the area herein conveyed shall revert and vest immediately to the Missouri Highways and Transportation Commission.&amp;lt;/i&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;::&amp;lt;i&amp;gt;The (City/County) shall be prohibited from abandoning or conveying any or all the (Route) right of way, which is the subject of this conveyance.  In the event of such an abandonment or attempted conveyance by the (City/County), then &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;in &lt;/ins&gt;such event, the conveyance by the Missouri Highways and Transportation Commission to the (City/County) by this quitclaim deed, shall be null and void and all of the area herein conveyed shall revert and vest immediately to the Missouri Highways and Transportation Commission.&amp;lt;/i&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===236.14.2.2 Trade routes with Local Government Agency (CRSR required)===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===236.14.2.2 Trade routes with Local Government Agency (CRSR required)===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Hoskir</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=53035&amp;oldid=prev</id>
		<title>Hoskir: /* 236.14.2.1 Convey to Local Government Agency (CRSR required) */ updated per RR3688</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=53035&amp;oldid=prev"/>
		<updated>2023-10-25T14:14:21Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;236.14.2.1 Convey to Local Government Agency (CRSR required): &lt;/span&gt; updated per RR3688&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 09:14, 25 October 2023&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l48&quot;&gt;Line 48:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 48:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Sections of the existing route that need to remain in place to serve local public interests will be identified in the location/environmental study or conceptual study report.  These sections may be conveyed to the appropriate local government agency, which is capable of accepting a deed for the right of way.  Upon approval of the CRSR by the Chief Engineer or designee, indicating the section of roadway to be transferred to another government agency, a roadway relinquishment agreement must be prepared. The preferred method of transfer is by quitclaim deed to the local government agency. However, the specific method of transfer and other details must be indicated in the agreement.  Execution of the roadway relinquishment agreement must be obtained from the local government agencies before the project is advertised for the bid opening.  Guidelines for the preparation of the [[236.14 Change in Route Status Report#236.14.6 Roadway Relinquishment Agreement|roadway relinquishment agreement]] are detailed later in this article.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Sections of the existing route that need to remain in place to serve local public interests will be identified in the location/environmental study or conceptual study report.  These sections may be conveyed to the appropriate local government agency, which is capable of accepting a deed for the right of way.  Upon approval of the CRSR by the Chief Engineer or designee, indicating the section of roadway to be transferred to another government agency, a roadway relinquishment agreement must be prepared. The preferred method of transfer is by quitclaim deed to the local government agency. However, the specific method of transfer and other details must be indicated in the agreement.  Execution of the roadway relinquishment agreement must be obtained from the local government agencies before the project is advertised for the bid opening.  Guidelines for the preparation of the [[236.14 Change in Route Status Report#236.14.6 Roadway Relinquishment Agreement|roadway relinquishment agreement]] are detailed later in this article.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;When a roadway is conveyed to a local government with the intention to leave as public right of way the conveyance deed should include the following reversionary clause: &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;::&amp;lt;i&amp;gt;The (City/County) shall be prohibited from abandoning or conveying any or all the (Route) right of way, which is the subject of this conveyance.  In the event of such an abandonment or attempted conveyance by the (City/County), then is such event, the conveyance by the Missouri Highways and Transportation Commission to the (City/County) by this quitclaim deed, shall be null and void and all of the area herein conveyed shall revert and vest immediately to the Missouri Highways and Transportation Commission.&amp;lt;/i&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===236.14.2.2 Trade routes with Local Government Agency (CRSR required)===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===236.14.2.2 Trade routes with Local Government Agency (CRSR required)===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Hoskir</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=52807&amp;oldid=prev</id>
		<title>Hoskir: updated forms area</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=52807&amp;oldid=prev"/>
		<updated>2023-08-09T18:08:21Z</updated>

		<summary type="html">&lt;p&gt;updated forms area&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 13:08, 9 August 2023&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;{|&lt;/del&gt;style=&quot;padding: 0.3em&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;; margin-left:15px&lt;/del&gt;; border:1px solid #&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;a9a9a9&lt;/del&gt;; text-align:&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;center;font-size: 95%&lt;/del&gt;; &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;background:#f5f5f5&lt;/del&gt;&quot; &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;width=&quot;160px&quot; align=&quot;right&quot;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;div &lt;/ins&gt;style=&quot;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;float: right; margin-right:0px; width:275px; background-color: #f5f5f5; &lt;/ins&gt;padding: 0.3em; border: 1px solid #&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;cccccc&lt;/ins&gt;; text-align:&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;left&lt;/ins&gt;;&quot;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|-&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&#039;&#039;&#039;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;u&amp;gt;&amp;lt;center&amp;gt;Figures&amp;lt;/center&amp;gt;&amp;lt;/u&amp;gt;&lt;/ins&gt;&#039;&#039;&#039;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|&lt;/del&gt;&#039;&#039;&#039;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Figure&lt;/del&gt;&#039;&#039;&#039;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;*&lt;/ins&gt;[https://epg.modot.org/forms/RW/Chapter%2014_Change%20in%20Route%20Status%20Report/Change%20in%20Route%20Status%20Sketch.pdf Example Sketch]  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|-&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;/div&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|&lt;/del&gt;[https://epg.modot.org/forms/RW/Chapter%2014_Change%20in%20Route%20Status%20Report/Change%20in%20Route%20Status%20Sketch.pdf Example Sketch]  &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;|}&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-added&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Recommendations for the disposition of existing roadways included in the [[:Category:126 Location Study and Alternatives Analysis|location/environmental study]] or [[:Category:128 Conceptual Studies|conceptual study]] report must receive approval before they can be included in the approved right of way plans.  Approval of the disposition of the existing roadway is initiated by the submission of a Change in Route Status Report (CRSR) to Transportation Planning, after district review (see [[media:236.14_Procedure_Diagram.pdf|procedure diagram]]).&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Recommendations for the disposition of existing roadways included in the [[:Category:126 Location Study and Alternatives Analysis|location/environmental study]] or [[:Category:128 Conceptual Studies|conceptual study]] report must receive approval before they can be included in the approved right of way plans.  Approval of the disposition of the existing roadway is initiated by the submission of a Change in Route Status Report (CRSR) to Transportation Planning, after district review (see [[media:236.14_Procedure_Diagram.pdf|procedure diagram]]).&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Hoskir</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=50411&amp;oldid=prev</id>
		<title>Smithk: Updated website links for increased security</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=50411&amp;oldid=prev"/>
		<updated>2021-10-25T18:55:30Z</updated>

		<summary type="html">&lt;p&gt;Updated website links for increased security&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 13:55, 25 October 2021&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l3&quot;&gt;Line 3:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 3:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|&amp;#039;&amp;#039;&amp;#039;Figure&amp;#039;&amp;#039;&amp;#039;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|&amp;#039;&amp;#039;&amp;#039;Figure&amp;#039;&amp;#039;&amp;#039;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|-&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|[&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;://epg.modot.org/forms/RW/Chapter%2014_Change%20in%20Route%20Status%20Report/Change%20in%20Route%20Status%20Sketch.pdf Example Sketch]  &lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|[&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;https&lt;/ins&gt;://epg.modot.org/forms/RW/Chapter%2014_Change%20in%20Route%20Status%20Report/Change%20in%20Route%20Status%20Sketch.pdf Example Sketch]  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|}&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;|}&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l102&quot;&gt;Line 102:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 102:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===236.14.4.2 Sketch===&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===236.14.4.2 Sketch===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;A line drawing sketch is prepared to show the proposed disposition of existing routes.  This sketch is developed on a letter size or multiple of a letter size reproducible sheet.  The sketch will be developed at an appropriate scale to allow the details of the CRSR to be clearly visible.  Production of a high quality sketch is important because this document will be used to maintain the permanent record of the history of the route.  [&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;http&lt;/del&gt;://epg.modot.org/forms/RW/Chapter%2014_Change%20in%20Route%20Status%20Report/Change%20in%20Route%20Status%20Sketch.pdf An example] of this sketch is available.  The existing route will be shown as parallel lines 0.1 in. apart with the space between left blank to permit coloring.  The new route will be shown as a solid line 0.1 in. wide.  The following features will be included on the sketch:&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;A line drawing sketch is prepared to show the proposed disposition of existing routes.  This sketch is developed on a letter size or multiple of a letter size reproducible sheet.  The sketch will be developed at an appropriate scale to allow the details of the CRSR to be clearly visible.  Production of a high quality sketch is important because this document will be used to maintain the permanent record of the history of the route.  [&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;https&lt;/ins&gt;://epg.modot.org/forms/RW/Chapter%2014_Change%20in%20Route%20Status%20Report/Change%20in%20Route%20Status%20Sketch.pdf An example] of this sketch is available.  The existing route will be shown as parallel lines 0.1 in. apart with the space between left blank to permit coloring.  The new route will be shown as a solid line 0.1 in. wide.  The following features will be included on the sketch:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;* Equations that relate the stationing of the existing route to the stationing of the new route at the locations necessary to allow computation of section lengths.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;* Equations that relate the stationing of the existing route to the stationing of the new route at the locations necessary to allow computation of section lengths.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=47953&amp;oldid=prev</id>
		<title>Smithk: /* 236.14.8 Change in Route Marking */ Per TS, archaic guidance was updated to include the Change in Route Marking Report shall be submitted to Central Office Highway Safety and Traffic for processing.</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=47953&amp;oldid=prev"/>
		<updated>2020-08-04T18:40:06Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;236.14.8 Change in Route Marking: &lt;/span&gt; Per TS, archaic guidance was updated to include the Change in Route Marking Report shall be submitted to Central Office Highway Safety and Traffic for processing.&lt;/span&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 13:40, 4 August 2020&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l162&quot;&gt;Line 162:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 162:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==236.14.8 Change in Route Marking==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==236.14.8 Change in Route Marking==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Any change &lt;/del&gt;in &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the designation (number&lt;/del&gt;, &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;letter&lt;/del&gt;, &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;etc&lt;/del&gt;.&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;) &lt;/del&gt;of any &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;state route requires &lt;/del&gt;a &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;change &lt;/del&gt;in route &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;marking&lt;/del&gt;.  Guidelines for preparation of &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;this request &lt;/del&gt;are contained in [[943.1 Submittals|EPG 943.1 Submittals]]. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; &lt;/del&gt;The Change in Route Marking Report (CRMR) shall be reviewed by the [[236.5 Property Management#236.5.3 Asset Management Committee|District&#039;s Asset Management Committee]] and submitted to &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Transportation Planning &lt;/del&gt;for processing. &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt; &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;A Change &lt;/ins&gt;in &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Route Marking identifies whether there are any route marking changes needed&lt;/ins&gt;, &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;and whether those changes are possible&lt;/ins&gt;, &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;before commitments are made in the route status process&lt;/ins&gt;. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;This needs to be an early part &lt;/ins&gt;of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;the Change in Route Status process.  A Change in Route Marking is required &lt;/ins&gt;any &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;time &lt;/ins&gt;a &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Change &lt;/ins&gt;in &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Route Status will affect the route signing guidance along the &lt;/ins&gt;route &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;in question&lt;/ins&gt;.  Guidelines for preparation of &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;a Change in Route Marking Request &lt;/ins&gt;are contained in [[943.1 Submittals|EPG 943.1 Submittals]]. The Change in Route Marking Report (CRMR) shall be reviewed by the [[236.5 Property Management#236.5.3 Asset Management Committee|District&#039;s Asset Management Committee]] and submitted to &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Central Office Highway Safety and Traffic &lt;/ins&gt;for processing.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[category:236 Right of Way]]&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;[[category:236 Right of Way]]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=46804&amp;oldid=prev</id>
		<title>Smithk at 12:44, 31 October 2019</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=46804&amp;oldid=prev"/>
		<updated>2019-10-31T12:44:33Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 07:44, 31 October 2019&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l132&quot;&gt;Line 132:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 132:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==236.14.5 Implementation of Approved Changes in Route Status==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==236.14.5 Implementation of Approved Changes in Route Status==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Once the Chief Engineer or designee approves the CRSR, the district may proceed with the steps necessary to carry out the approved changes in route status.  The [https://www.modot.org/sites/default/files/documents/008-01-01-EXECUTION &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;OF DOCUMENTS&lt;/del&gt;.pdf Commission&#039;s Execution of Documents Policy] will be reviewed to determine who has the authority to execute any subsequent agreements that are necessary to accomplish the approved dispositions.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Once the Chief Engineer or designee approves the CRSR, the district may proceed with the steps necessary to carry out the approved changes in route status.  The [https://www.modot.org/sites/default/files/documents/008-01-01-EXECUTION&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;%20OF%20DOCUMENTS&lt;/ins&gt;.pdf Commission&#039;s Execution of Documents Policy] will be reviewed to determine who has the authority to execute any subsequent agreements that are necessary to accomplish the approved dispositions.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The first action to be taken by the district will be dependent on the type of dispositions approved in the report.  For example, if all sections of the existing route are to be retained in the state highway system, no further action is required.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The first action to be taken by the district will be dependent on the type of dispositions approved in the report.  For example, if all sections of the existing route are to be retained in the state highway system, no further action is required.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If sections of the existing route are to be conveyed to other owners (local public agency or adjacent property owner), then a roadway relinquishment agreement must be drafted and executed as the first action.  A description of the individuals authorized to execute the agreement can be found in the [https://www.modot.org/sites/default/files/documents/008-01-01-EXECUTION &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;OF DOCUMENTS&lt;/del&gt;.pdf Commission&#039;s Execution of Documents Policy].&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If sections of the existing route are to be conveyed to other owners (local public agency or adjacent property owner), then a roadway relinquishment agreement must be drafted and executed as the first action.  A description of the individuals authorized to execute the agreement can be found in the [https://www.modot.org/sites/default/files/documents/008-01-01-EXECUTION&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;%20OF%20DOCUMENTS&lt;/ins&gt;.pdf Commission&#039;s Execution of Documents Policy].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After the roadway relinquishment agreements are executed a copy of the CRSR, including a colored copy of the sketch, copies of the relinquishment agreements, and appropriate plans will be provided to the district right of way manager so quitclaim deeds can be prepared for those sections of the old route that are to be conveyed to others.  Any special conditions contained in the relinquishment agreements will be taken into account when preparing the quitclaim deeds.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After the roadway relinquishment agreements are executed a copy of the CRSR, including a colored copy of the sketch, copies of the relinquishment agreements, and appropriate plans will be provided to the district right of way manager so quitclaim deeds can be prepared for those sections of the old route that are to be conveyed to others.  Any special conditions contained in the relinquishment agreements will be taken into account when preparing the quitclaim deeds.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
	<entry>
		<id>https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=46800&amp;oldid=prev</id>
		<title>Smithk: updated link</title>
		<link rel="alternate" type="text/html" href="https://epg.modot.org/index.php?title=236.14_Change_in_Route_Status_Report&amp;diff=46800&amp;oldid=prev"/>
		<updated>2019-10-31T12:39:50Z</updated>

		<summary type="html">&lt;p&gt;updated link&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 07:39, 31 October 2019&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l132&quot;&gt;Line 132:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 132:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==236.14.5 Implementation of Approved Changes in Route Status==&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==236.14.5 Implementation of Approved Changes in Route Status==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Once the Chief Engineer or designee approves the CRSR, the district may proceed with the steps necessary to carry out the approved changes in route status.  The [https://www.modot.org/sites/default/files/documents/008-01-01-EXECUTION&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;%20OF%20DOCUMENTS&lt;/del&gt;.pdf Commission&#039;s Execution of Documents Policy] will be reviewed to determine who has the authority to execute any subsequent agreements that are necessary to accomplish the approved dispositions.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Once the Chief Engineer or designee approves the CRSR, the district may proceed with the steps necessary to carry out the approved changes in route status.  The [https://www.modot.org/sites/default/files/documents/008-01-01-EXECUTION &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;OF DOCUMENTS&lt;/ins&gt;.pdf Commission&#039;s Execution of Documents Policy] will be reviewed to determine who has the authority to execute any subsequent agreements that are necessary to accomplish the approved dispositions.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The first action to be taken by the district will be dependent on the type of dispositions approved in the report.  For example, if all sections of the existing route are to be retained in the state highway system, no further action is required.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The first action to be taken by the district will be dependent on the type of dispositions approved in the report.  For example, if all sections of the existing route are to be retained in the state highway system, no further action is required.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If sections of the existing route are to be conveyed to other owners (local public agency or adjacent property owner), then a roadway relinquishment agreement must be drafted and executed as the first action.  A description of the individuals authorized to execute the agreement can be found in the [https://www.modot.org/sites/default/files/documents/008-01-01-EXECUTION&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;%20OF%20DOCUMENTS&lt;/del&gt;.pdf Commission&#039;s Execution of Documents Policy].&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;If sections of the existing route are to be conveyed to other owners (local public agency or adjacent property owner), then a roadway relinquishment agreement must be drafted and executed as the first action.  A description of the individuals authorized to execute the agreement can be found in the [https://www.modot.org/sites/default/files/documents/008-01-01-EXECUTION &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;OF DOCUMENTS&lt;/ins&gt;.pdf Commission&#039;s Execution of Documents Policy].&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;br&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After the roadway relinquishment agreements are executed a copy of the CRSR, including a colored copy of the sketch, copies of the relinquishment agreements, and appropriate plans will be provided to the district right of way manager so quitclaim deeds can be prepared for those sections of the old route that are to be conveyed to others.  Any special conditions contained in the relinquishment agreements will be taken into account when preparing the quitclaim deeds.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After the roadway relinquishment agreements are executed a copy of the CRSR, including a colored copy of the sketch, copies of the relinquishment agreements, and appropriate plans will be provided to the district right of way manager so quitclaim deeds can be prepared for those sections of the old route that are to be conveyed to others.  Any special conditions contained in the relinquishment agreements will be taken into account when preparing the quitclaim deeds.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Smithk</name></author>
	</entry>
</feed>