LPA:136.4 Consultant Selection and Consultant Contract Management: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)

26 June 2013

25 June 2013

11 June 2013

6 June 2013

5 June 2013

31 May 2013

30 May 2013

  • curprev 13:3413:34, 30 May 2013Smithk talk contribsm 40,006 bytes +212 Per LPA, added to Figs. 136.4.7 and 136.4.14 info ensuring haz waste inspections & reports were being done. Also, added EPG 136.4.4 Constr Eng'g and Constr Admin that links to EPG 136.11.

16 May 2013

15 May 2013

2 May 2013

30 April 2013

4 April 2013

2 April 2013

27 March 2013

20 March 2013

12 March 2013

28 February 2013

26 February 2013

25 February 2013

4 February 2013

1 February 2013

  • curprev 08:1708:17, 1 February 2013Smithk talk contribsm 38,344 bytes −495 Per Design, clarification of the criteria for prequalifying a consultant for MoDOT and LPA work. Several figures and "How to Evaluate" PowerPoint updated.

16 January 2013

21 December 2012

26 November 2012

21 November 2012

15 November 2012

1 November 2012

25 October 2012

12 October 2012

5 October 2012

1 October 2012

5 September 2012

4 September 2012

30 August 2012

29 August 2012

27 August 2012

22 August 2012

31 July 2012

(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)