User:Hoskir/Revision Request 4294: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 October 2026

  • curprev 08:2508:25, 22 October 2026 Hoskir talk contribs 5,938 bytes +5,938 Created page with " <big>'''REPLACE EPG 108.1.1'''</big> ==108.1.1 Review and Approval of a Subcontract Request== When a contractor desires to sublet a portion of the work, the request will be submitted to the resident engineer on [https://epg.modot.org/forms/CM/Request_to_Subcontract_C_220.pdf Request to Subcontract Work (Form C-220)]. The resident engineer, or a designee assigned by the District Construction Engineer, shall perform the following review on all subcontract requests: # Ch..."