Difference between revisions of "Category talk:403 Asphaltic Concrete Pavement"
Jump to navigation
Jump to search
(New page: 403.1.5 under Gradation line 4 and 5 shouldn't the sentance"QA is required to independently sample the aggregate and perform a sieve analysis once per lot." read "once per day."?) |
(No difference)
|
Revision as of 14:32, 6 November 2008
403.1.5 under Gradation line 4 and 5 shouldn't the sentance"QA is required to independently sample the aggregate and perform a sieve analysis once per lot." read "once per day."?