Difference between revisions of "Category:101 Standard Forms"
Jump to navigation
Jump to search
m (→Construction and Contractor Related: clarification, per CM) |
m (Updated and added new construction forms.) |
||
Line 66: | Line 66: | ||
*[http://epg.modot.mo.gov/forms/CO/Affirmative%20Action%20Certification.dot Affirmative Action Certification] | *[http://epg.modot.mo.gov/forms/CO/Affirmative%20Action%20Certification.dot Affirmative Action Certification] | ||
+ | |||
+ | *[http://epg.modot.org/forms/CO/As%20Built%20Plans%20Checklist%20-%20District%206.dot As Built Plans Checklist - District 6] | ||
*[http://epg.modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20All%20Materials%20(Form%20T748).dot Asbestos Survey Report - All Materials (Form T748)] | *[http://epg.modot.mo.gov/forms/CO/Asbestos%20Survey%20Report%20-%20All%20Materials%20(Form%20T748).dot Asbestos Survey Report - All Materials (Form T748)] | ||
Line 112: | Line 114: | ||
*[http://epg.modot.mo.gov/forms/CO/Final%20Acceptance%20Checklist.dot Final Acceptance Checklist] | *[http://epg.modot.mo.gov/forms/CO/Final%20Acceptance%20Checklist.dot Final Acceptance Checklist] | ||
+ | |||
+ | *[http://epg.modot.org/forms/CO/Final%20Plans%20Certification.dot Final Plans Certification] | ||
*[http://epg.modot.mo.gov/forms/CO/Final%20Plans%20Checklist.dot Final Plans Checklist] | *[http://epg.modot.mo.gov/forms/CO/Final%20Plans%20Checklist.dot Final Plans Checklist] | ||
*[http://epg.modot.mo.gov/forms/CO/Final%20Utility%20Report%20(C-13).dot Final Utility Report (C-13)] | *[http://epg.modot.mo.gov/forms/CO/Final%20Utility%20Report%20(C-13).dot Final Utility Report (C-13)] | ||
− | |||
− | |||
*[[media:137 Force Account Worksheet (one day).xls|Force Account Worksheet (one day)]] | *[[media:137 Force Account Worksheet (one day).xls|Force Account Worksheet (one day)]] | ||
Line 172: | Line 174: | ||
*[http://epg.modot.mo.gov/forms/CO/Material%20Transfer%20Request.dot Request for Transfer of Inspected Material] | *[http://epg.modot.mo.gov/forms/CO/Material%20Transfer%20Request.dot Request for Transfer of Inspected Material] | ||
+ | |||
+ | *[http://epg.modot.org/forms/CO/RoCap%20Test%20Form%20-%20Long%20Bolts.dot RoCap Test Form - Long Bolts] | ||
+ | |||
+ | *[http://epg.modot.org/forms/CO/RoCap%20Test%20Form%20-%20Short%20Bolts.dot RoCap Test Form - Short Bolts] | ||
*[http://epg.modot.mo.gov/forms/CO/Semi-annual%20Labor%20Compliance%20Report.dot Semi-annual Labor Compliance Report] | *[http://epg.modot.mo.gov/forms/CO/Semi-annual%20Labor%20Compliance%20Report.dot Semi-annual Labor Compliance Report] | ||
Line 184: | Line 190: | ||
*[http://epg.modot.org/forms/CO/Wage%20Interview%20(Form%20CR-1).dot Wage Interview (Form CR-1)] | *[http://epg.modot.org/forms/CO/Wage%20Interview%20(Form%20CR-1).dot Wage Interview (Form CR-1)] | ||
+ | |||
+ | *[http://epg.modot.org/forms/CO/Wage%20Interview%20(Form%20CR-1)%20Spanish.dot Wage Interview (Form CR-1) - Spanish] | ||
*[http://epg.modot.mo.gov/forms/CO/Waste%20Disposal%20Agreement.dot Waste Disposal Agreement] | *[http://epg.modot.mo.gov/forms/CO/Waste%20Disposal%20Agreement.dot Waste Disposal Agreement] |
Revision as of 12:31, 16 September 2009
Contents
- 1
- 2 Bridge
- 3 Construction and Materials
- 4 Design
- 5 Maintenance
- 6 Motor Carrier Services
- 7 Planning
- 8 Right of Way
- 8.1 General Information
- 8.2 Right of Way Organization and Personnel
- 8.3 Administration
- 8.4 Description Writing and Titles
- 8.5 Property Management
- 8.6 Appraisal and Appraisal Review
- 8.7 Negotiation
- 8.8 Relocation Assistance Program
- 8.9 Asbestos Abatement-Removal of Building Improvement
- 8.10 Right Of Way Condemnation
- 8.11 Mediation
- 8.12 Quality Assurance Reviews
- 8.13 Designing Right of Way Plans
- 8.14 Change in Route Status Report
- 8.15 Requests from Cities for Annexations
- 8.16 Outdoor Advertising
- 8.17 Junkyards
- 8.18 Local Public Agency Land Acquisition
Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.
Bridge
Construction and Materials
Forms for Contractor Use
Construction and Contractor Related
- Contractor Questionnaire (to bid contracts less than $2,000,000)
- Prequalification Contractor Questionnaire (to bid a contract of any size)
Materials Related
Posters, Federal Aid
- Equal Employment Opportunity (also available en español)
- Important Wage Rate Info FHWA-1495 (also available en español)
- Job Safety and Health OSHA (also available en español)
- Minimum Wage 1088 (also available en español)
- Notice Polygraph WH 1462 (also available en español)
Posters, State Aid
- Workers Compensation WC 106 (also available en español)
Utility or Right of Way Related
Design
Bridge
Checklist
Computer
Contracts
Design Forms
Engineering Professional Services
Environmental and Cultural
Hearings
Materials
Photo
Planning
Right of Way
Scoping
Survey
Maintenance
Chip Seal Forms
- Application Adjustment Factor Form
- Traffic Evaluation Factor (TEF) for Asphalt Application Adjustment
Bridge Maintenance
- Blank Inspection Report
- Maintenance Material Usage (Excel)
- Paint Data Report (Excel)
- Maintenance Recommendation Report
- Bridge Maintenance Repair Report (Excel)
- Photo Log Sheet (Excel)
- FAR (Follow-Up Action Required)
- CIF (Critical Inspection Finding)
Snow & Ice Control
Rest Areas
Commuter Lots
Disasters
Performance Indicators
Pavement Management
Motor Carrier Services
Planning
Right of Way
General Information
Right of Way Organization and Personnel
Administration
Description Writing and Titles
Property Management
Appraisal and Appraisal Review
Negotiation
Relocation Assistance Program
Asbestos Abatement-Removal of Building Improvement
Right Of Way Condemnation
Mediation
Quality Assurance Reviews
Designing Right of Way Plans
Change in Route Status Report
Requests from Cities for Annexations
Outdoor Advertising
Junkyards
Local Public Agency Land Acquisition