Difference between revisions of "120.9 Uninterrupted Traffic Flow"
m (→120.9.3 Winter Events: link to Snow Academy) |
m (→120.9.3 Winter Events: updated link) |
||
Line 36: | Line 36: | ||
==120.9.3 [[:Category:133 Snow and Ice Control|Winter Events]]== | ==120.9.3 [[:Category:133 Snow and Ice Control|Winter Events]]== | ||
− | {|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width=" | + | {|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="300px" align="right" |
|- | |- | ||
|'''Related Information''' | |'''Related Information''' | ||
|- | |- | ||
− | |[http://wwwi/intranet/hr/hred/documents/ | + | |[http://wwwi.dot.missouri/intranet/hr/hred/documents/MoDOTSnowAcademyparticipantbook.pdf MoDOT Snow Academy Official Guide, Participant's Manual] and [http://wwwi.dot.missouri/intranet/hr/hred/roadeo.htm Snow Academy Website]] |
|} | |} | ||
===Performance Expectation=== | ===Performance Expectation=== |
Revision as of 09:50, 27 September 2010
Contents
120.9.1 Scheduled Lane Closures
Performance Expectation
Travelers will move safely and efficiently through every construction, maintenance, permit and utility work zone, including operations involving the closure of one or more travel lanes.
Performance Measures
Quality assurance inspections of work zones are conducted on a daily basis by Central Office and district staffs. The Work Zone Quality Circle completes in-depth technical reviews annually.
Performance Objectives
No more than a 15-minute delay on interstates is considered acceptable. 95% of work zones on interstates shall pass the visibility-mobility reviews performed.
120.9.2 Unscheduled Lane Closures
Performance Expectation
Minimize the delays resulting from incidents and other unplanned closures by assisting emergency responders to the maximum extent possible. Traveler information map and dynamic message boards display accurate information and updated as estimated duration changes.
Performance Measures
MoDOT response times. Time to clear incidents. Time to clear backups from incidents. Timely public notification through dynamic message boards and accurate traveler information map location.
Performance Objectives
To achieve 15-minute response times on urban interstates and 30-minute response times on rural interstates. Clear incidents as soon as practical.
120.9.3 Winter Events
Related Information |
MoDOT Snow Academy Official Guide, Participant's Manual and Snow Academy Website] |
Performance Expectation
All interstates shall remain open to at least one lane of traffic in each direction and be restored to a clear condition after the end of the winter event.
Performance Measures
Visual observations shall be made after each winter event to determine the time needed to restore the interstates to a clear condition.
Performance Objectives
To return the interstates to a clear condition as soon as possible after the end of the winter event.