Difference between revisions of "Federal-Aid Acceptance Sampling and Testing"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (add new page)
 
m (Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing approach on "On-system" work.)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
==Guide Schedule for Federal-Aid Sampling==
+
{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="340px" align="center"  
 
 
{| cellpadding="5"
 
 
|-
 
|-
!width="50"|Legend:||width="150"|FD = field||width="250"|DL = district laboratory||width="250"|BC = before compaction
+
|'''This article's information has moved'''
 
|-
 
|-
|}
+
|The "Stabilized Permeable Base" information from Federal-Aid Acceptance Sampling and Testing has moved to [http://epg.modot.org/index.php?title=Category:302_Stabilized_Permeable_Base#302.2.1.1_Production_Testing EPG 302.2.1.1]. The "Modified Subgrade" information was moved to [http://epg.modot.org/index.php?title=Category:205_Modified_Subgrade#205.2.2.3.7_Production_Testing EPG 205.2.2.3.7].
 
 
 
 
{| border="1" cellpadding="5" cellspacing="0" style="background:#CCCCCC" 
 
|-style="background:#FFD700"
 
! Type of Construction Material  || Tests to be made (if specified) || Sampled || Tested in || Minimum Number of Tests
 
|-
 
|Stabilized Permeable Base
 
|align="center"| Graduation SAA002UB
 
|align="center"|BC
 
|align="center"|FD, DL
 
|One per 5,000 tons (5,000 megagrams) or fraction thereof per specified graduation source. None required if less than 1,000 tons (1,000 megagrams) of a specified graduation.
 
|-
 
|rowspan="3"|Modified subgrade (sand-soil base, soil-cement base or soil-lime base)
 
|align="center"| Graduation SAA002WA
 
|align="center"|BC
 
|align="center"|FD, DL
 
|One per 5,000 tons (5,000 megagrams) or fraction thereof per specified graduation source. None required if less than 1,000 tons (1,000 megagrams) of a specified graduation.
 
|-
 
|align="center"| Liquid Limit included with gradation
 
|align="center"|BC
 
|align="center"|FD, DL
 
|One per project per specified graduation, per source. None required if less than 1,000 tons (1,000 megagrams).
 
|-
 
|align="center"| PI included with gradation
 
|align="center"|BC
 
|align="center"|FD,DL
 
|One per project per specified graduation, per source. None required if less than 1,000 tons (1,000 megagrams).
 
 
|}
 
|}

Latest revision as of 11:38, 18 October 2012

This article's information has moved
The "Stabilized Permeable Base" information from Federal-Aid Acceptance Sampling and Testing has moved to EPG 302.2.1.1. The "Modified Subgrade" information was moved to EPG 205.2.2.3.7.