Difference between revisions of "Talk:102.2 Contractor Performance Rating System"

From Engineering_Policy_Guide
Jump to navigation Jump to search
(New page: Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they kno...)
(No difference)

Revision as of 08:25, 2 July 2014

Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them. Thanks!