Difference between revisions of "Talk:104.7 Scoping Estimates"

From Engineering_Policy_Guide
Jump to navigation Jump to search
(Request for add'l information.)
 
m (Smithk moved page Talk:104.7 Estimates to Talk:104.7 Scoping Estimates: Per Bidding and TP)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 +
==Year of Estimate Figures==
 +
 
Please add the year to the "cost estimate guide for rural preliminary design" document.  Knowing the year these costs are representative of would allow adjustment for inflation.
 
Please add the year to the "cost estimate guide for rural preliminary design" document.  Knowing the year these costs are representative of would allow adjustment for inflation.
 +
 +
[[User:Tschid|Dan Tschirgi:]] The last date these figures were updated was added to the heading of this figure, to use in those instances where application of inflation rates is appropriate.

Latest revision as of 13:16, 30 August 2019

Year of Estimate Figures

Please add the year to the "cost estimate guide for rural preliminary design" document. Knowing the year these costs are representative of would allow adjustment for inflation.

Dan Tschirgi: The last date these figures were updated was added to the heading of this figure, to use in those instances where application of inflation rates is appropriate.