|'''Additional MGS Information''' | |'''Additional MGS Information''' | ||
|- | |- | ||
− | |[ | + | |[https://www.modot.org/general-services-specifications-mgs-subject Current General Services Specifications (MGS) By Subject] |
|} | |} | ||
Line 11: | Line 11: | ||
==1002.1 Procedure== | ==1002.1 Procedure== | ||
− | Inspection, testing, and sampling will also be governed by the instructions contained in [[:Category:1001 General Requirements for Material|General Requirements for Material]]. | + | Inspection, testing, and sampling will also be governed by the instructions contained in [[:Category:1001 General Requirements for Material|EPG 1001 General Requirements for Material]]. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Samples required for Laboratory tests are as follows: | Samples required for Laboratory tests are as follows: | ||
Line 34: | Line 19: | ||
==1002.2 Acceptance== | ==1002.2 Acceptance== | ||
− | Source Approval is to be based on the results of Laboratory tests. Acceptance is based on routine tests in the field to ensure compliance with [http://modot. | + | Source Approval is to be based on the results of Laboratory tests. Acceptance is based on routine tests in the field to ensure compliance with [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1002.] |
− | Acceptance or rejection of aggregates for asphaltic concrete will be on the basis of quality requirements of Standard Specification [http://modot. | + | Acceptance or rejection of aggregates for asphaltic concrete will be on the basis of quality requirements of Standard Specification [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1002], placing full responsibility for obtaining the proper gradation shown on the approved job mix formula on the contractors. It is expected, however, that the District Construction and Materials Engineer will cooperate with the contractors by keeping them informed as to whether the produced material can be combined to meet the gradation shown in the approved job mix formula. |
− | If | + | If contractors desire to have material produced to comply with gradations that they have selected as being more applicable to the approved job mix, the contractors shall furnish the necessary gradation requirements to the District Construction and Materials Engineer and the aggregate producers in writing. The inspector should then immediately notify both the contractors and the producers when the material, as produced, approaches or exceeds these additional limits. This procedure should be explained to all contractors so that they may proceed on that basis, if they prefer. Where contractors are not willing to furnish adequate and definite instructions, the basis of acceptance or rejection of the material will be as described in the immediately preceding paragraph. |
==1002.3 Records and Reports== | ==1002.3 Records and Reports== | ||
− | All plant records shown in [[:Category:1001 General Requirements for Material#1001. | + | All plant records shown in [[:Category:1001 General Requirements for Material#1001.6 Records and Reports|EPG 1001.6 General Requirements for Material - Records and Reports]] shall be maintained. The aggregate shall be reported through AASHTOWARE Project (AWP), as described in [[:Category:101 Standard Forms#Sample Record, General|AWP MA Sample Record, General]]. |
==1002.4 Qualified Mineral Filler for Stone Matrix Asphalt (SMA)== | ==1002.4 Qualified Mineral Filler for Stone Matrix Asphalt (SMA)== | ||
− | Mineral filler shall be in accordance with M 17 and shall meet the requirements of Specification Section 1002.4 in [http://modot. | + | Mineral filler shall be in accordance with M 17 and shall meet the requirements of Specification Section 1002.4 in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=14 Sec 1002]. Upon approval of the mineral filler, the manufacturer and product will be added to the list [https://www.modot.org/media/467 "Qualified Mineral Filler for SMA"]. |
==1002.5 Laboratory Testing for Sec 1002== | ==1002.5 Laboratory Testing for Sec 1002== | ||
===1002.5.1 Types of Samples Tested=== | ===1002.5.1 Types of Samples Tested=== | ||
====1002.5.1.1 Initial Approval Sample==== | ====1002.5.1.1 Initial Approval Sample==== | ||
− | Tests consist of specific gravity, absorption, and Los Angeles abrasion. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through | + | Tests consist of specific gravity, absorption, and Los Angeles abrasion. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP. |
====1002.5.1.2 Source Approval Sample==== | ====1002.5.1.2 Source Approval Sample==== | ||
− | Coarse aggregate tests for source approval consist of sieve analysis, specific gravity, absorption, Los Angeles abrasion, and deleterious content. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through | + | Coarse aggregate tests for source approval consist of sieve analysis, specific gravity, absorption, Los Angeles abrasion, and deleterious content. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP. |
− | Fine aggregate tests for source approval consist of sieve analysis; specific gravity; other deleterious substances, clay lumps, and shale; and lightweight particle content when specified. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through | + | Fine aggregate tests for source approval consist of sieve analysis; specific gravity; other deleterious substances, clay lumps, and shale; and lightweight particle content when specified. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP. |
====1002.5.1.3 Trial Mix Samples==== | ====1002.5.1.3 Trial Mix Samples==== | ||
− | Coarse aggregate tests for trial mix consist of sieve analysis, specific gravity, absorption, plastic index (when required), deleterious content, sand equivalency (T176) and uncompacted voids (T304). The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through | + | Coarse aggregate tests for trial mix consist of sieve analysis, specific gravity, absorption, plastic index (when required), deleterious content, sand equivalency (T176) and uncompacted voids (T304). The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP. |
− | Fine aggregate tests for trial mix consist of sieve analysis, specific gravity, plastic index (when required), other deleterious substances, clay lumps and shale, and lightweight particle content when specified. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through | + | Fine aggregate tests for trial mix consist of sieve analysis, specific gravity, plastic index (when required), other deleterious substances, clay lumps and shale, and lightweight particle content when specified. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP. |
− | Mineral filler tests for trial mix consist of sieve analysis and specific gravity. The minimum time required for completion of tests is two working days from the date received. Test results and calculations shall be recorded through | + | Mineral filler tests for trial mix consist of sieve analysis and specific gravity. The minimum time required for completion of tests is two working days from the date received. Test results and calculations shall be recorded through AWP. |
===1002.5.2 Procedure=== | ===1002.5.2 Procedure=== | ||
Line 105: | Line 90: | ||
===1002.5.3 Sample Record=== | ===1002.5.3 Sample Record=== | ||
− | The sample record shall be completed in | + | The sample record shall be completed in AASHTOWARE Project (AWP), as described in [[:Category:101 Standard Forms#Sample Record, General|AWP MA Sample Record, General]], and shall indicate acceptance, qualified acceptance, or rejection. Appropriate remarks, as described in [[106.20 Reporting|EPG 106.20 Reporting]], are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab. |
Latest revision as of 10:15, 14 September 2021
Additional MGS Information |
Current General Services Specifications (MGS) By Subject |
This guidance establishes procedures for the inspection, testing and acceptance of coarse
aggregate, fine aggregate, hydrated lime, and mineral filler for use in asphaltic concrete.
Contents
1002.1 Procedure
Inspection, testing, and sampling will also be governed by the instructions contained in EPG 1001 General Requirements for Material.
Samples required for Laboratory tests are as follows:
- (a) Initial Evaluation for coarse aggregate.
- (b) Source Approval.
- (c) Trial Mix samples.
1002.2 Acceptance
Source Approval is to be based on the results of Laboratory tests. Acceptance is based on routine tests in the field to ensure compliance with Sec 1002.
Acceptance or rejection of aggregates for asphaltic concrete will be on the basis of quality requirements of Standard Specification Sec 1002, placing full responsibility for obtaining the proper gradation shown on the approved job mix formula on the contractors. It is expected, however, that the District Construction and Materials Engineer will cooperate with the contractors by keeping them informed as to whether the produced material can be combined to meet the gradation shown in the approved job mix formula.
If contractors desire to have material produced to comply with gradations that they have selected as being more applicable to the approved job mix, the contractors shall furnish the necessary gradation requirements to the District Construction and Materials Engineer and the aggregate producers in writing. The inspector should then immediately notify both the contractors and the producers when the material, as produced, approaches or exceeds these additional limits. This procedure should be explained to all contractors so that they may proceed on that basis, if they prefer. Where contractors are not willing to furnish adequate and definite instructions, the basis of acceptance or rejection of the material will be as described in the immediately preceding paragraph.
1002.3 Records and Reports
All plant records shown in EPG 1001.6 General Requirements for Material - Records and Reports shall be maintained. The aggregate shall be reported through AASHTOWARE Project (AWP), as described in AWP MA Sample Record, General.
1002.4 Qualified Mineral Filler for Stone Matrix Asphalt (SMA)
Mineral filler shall be in accordance with M 17 and shall meet the requirements of Specification Section 1002.4 in Sec 1002. Upon approval of the mineral filler, the manufacturer and product will be added to the list "Qualified Mineral Filler for SMA".
1002.5 Laboratory Testing for Sec 1002
1002.5.1 Types of Samples Tested
1002.5.1.1 Initial Approval Sample
Tests consist of specific gravity, absorption, and Los Angeles abrasion. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.
1002.5.1.2 Source Approval Sample
Coarse aggregate tests for source approval consist of sieve analysis, specific gravity, absorption, Los Angeles abrasion, and deleterious content. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.
Fine aggregate tests for source approval consist of sieve analysis; specific gravity; other deleterious substances, clay lumps, and shale; and lightweight particle content when specified. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.
1002.5.1.3 Trial Mix Samples
Coarse aggregate tests for trial mix consist of sieve analysis, specific gravity, absorption, plastic index (when required), deleterious content, sand equivalency (T176) and uncompacted voids (T304). The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.
Fine aggregate tests for trial mix consist of sieve analysis, specific gravity, plastic index (when required), other deleterious substances, clay lumps and shale, and lightweight particle content when specified. The minimum time required for completion of tests is four working days from the date received. Test results and calculations shall be recorded through AWP.
Mineral filler tests for trial mix consist of sieve analysis and specific gravity. The minimum time required for completion of tests is two working days from the date received. Test results and calculations shall be recorded through AWP.
1002.5.2 Procedure
1002.5.2.1 Sieve Analysis
Fine and coarse aggregate shall be tested in accordance with AASHTO T 27.
Mineral filler and hydrated lime shall be tested in accordance with AASHTO T 37.
1002.5.2.2 Specific Gravity
Coarse aggregate submitted for Source or Initial Approval shall be tested in accordance with AASHTO T85 for bulk specific gravity.
Coarse aggregate submitted for SuperPave Trial Mix designs shall be tested in accordance with the following:
- If 10.0% or less passes the #4, test the plus #4 material using AASHTO T 85 and discard the minus #4 material. Report the results.
- If more than 10.0% passes the #4 and more than 10.0% passes the #8, test the plus #4 using AASHTO T 85 and the minus #4 using AASHTO T 84. Use the AASHTO T 85 method for combining and averaging the results. Report the average.
- If more than 10.0% passes #4 and 10.0% or less passes the #8, test the plus #8 material using AASHTO T 85 and discard the minus #8 material. Report the result.
Fine aggregate submitted for Superpave (Trial Mix) shall be tested by AASHTO T84 for bulk specific gravity.
Mineral filler and hydrated lime shall be tested in accordance with MoDOT Test Method T37.
1002.5.2.3 Absorption
Coarse aggregate shall be tested in accordance with AASHTO T 85 for Initial Samples, Source Samples and Trial Mix to be used in mixtures which are defined by Standard Specifications 401, 402, and 403.
Coarse aggregates submitted for SUPERPAVE Trial Mix designs shall be tested in accordance with AASHTO T85 for absorption.
Fine aggregate shall be tested in accordance with AASHTO T84.
1002.5.2.4 Los Angeles Abrasion
Coarse aggregate shall be tested in accordance with AASHTO T 96.
1002.5.2.5 Deleterious Content
The percentage of deleterious substances for coarse aggregate is to be determined according to MoDOT TM-71, Deleterious Content of Aggregate. Where field determinations show a total deleterious content of 2.5 percent or less, including not more than 0.5 percent shale, the deleterious content is to be inspected visually. The sample is to be tested if visual inspection indicates more than 2.5 percent deleterious material present in the sample. Source approval samples shall always be tested regardless of the content of deleterious material.
The percentage of lightweight particles in fine aggregate is to be determined according to AASHTO T113 using a solution of zinc chloride and water. The heavy liquid shall have a specific gravity of 2.00 ± 0.01 at the beginning of the test and shall be maintained within that range during the test.
The other deleterious substances, clay lumps, and shale in fine aggregate shall be visually determined and separated into the constituents required by the applicable specification when an examination of the sample prepared for sieve analysis indicates a need for exact determination of deleterious content. Percentages shall be calculated as follows:
- where:
- P=Percent of deleterious material
- W=Weight of test sample and
- c=Actual weight of deleterious material
1002.5.3 Sample Record
The sample record shall be completed in AASHTOWARE Project (AWP), as described in AWP MA Sample Record, General, and shall indicate acceptance, qualified acceptance, or rejection. Appropriate remarks, as described in EPG 106.20 Reporting, are to be included in the remarks to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate templates under the Tests tab.