Difference between revisions of "Category:705 Prestressed Concrete Members for Bridges"
m (article construction) |
m (→705.3.3 Sample Record: Per CM, replaced archaic "Automation Section" with AWP MA Sample Record, General) |
||
(8 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
==705.1 Construction Inspections for Sec 705== | ==705.1 Construction Inspections for Sec 705== | ||
+ | {|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right" | ||
+ | |- | ||
+ | |'''Bridge Repair and Strengthening, PC''' | ||
+ | |- | ||
+ | |[http://library.modot.mo.gov/RDT/reports/Ri03038/RDT04005.pdf Report 1999] | ||
+ | |- | ||
+ | |[http://library.modot.mo.gov/RDT/reports/Ri01016/RDT01017a.pdf Report 2001] | ||
+ | |- | ||
+ | |[http://library.modot.mo.gov/RDT/reports/Ri99041/RDT01013.pdf Report 2001] | ||
+ | |- | ||
+ | |'''Prestress Concrete, Compressive Strength''' | ||
+ | |- | ||
+ | |[http://library.modot.mo.gov/RDT/reports/Ri03038/RDT04005.pdf Report 2004] | ||
+ | |- | ||
+ | |[http://library.modot.mo.gov/RDT/reports/Ri03038/RDT04005.pdf Summary 2004] | ||
+ | |- | ||
+ | |'''Precast-Prestressed Bridge Deck Panels''' | ||
+ | |- | ||
+ | |[http://library.modot.mo.gov/RDT/reports/TRyy0912/or11005.pdf Spalling Solution Precast-Prestressed Bridge Deck Panels, 2010] | ||
+ | |- | ||
+ | |'''See also:''' [https://www.modot.org/research-publications Research Publications] | ||
+ | |} | ||
Prestressed girders are normally inspected at the fabricating plant. Inspection reports will be furnished by the Construction and Materials Division. Pre-stressed girders must be handled and stored in an upright position. Failure to observe pick-up points can cause serious damage to the girder. When pre-stressed girders arrive on the project, they should be checked for shipping or handling damage. Each unit should also be checked against the inspection report. Once girders have been erected forming of the deck and placement of concrete is similar to practices followed for steel structures. The units normally have appreciable camber until the deck is in place. | Prestressed girders are normally inspected at the fabricating plant. Inspection reports will be furnished by the Construction and Materials Division. Pre-stressed girders must be handled and stored in an upright position. Failure to observe pick-up points can cause serious damage to the girder. When pre-stressed girders arrive on the project, they should be checked for shipping or handling damage. Each unit should also be checked against the inspection report. Once girders have been erected forming of the deck and placement of concrete is similar to practices followed for steel structures. The units normally have appreciable camber until the deck is in place. | ||
Line 18: | Line 40: | ||
===705.3.3 Sample Record=== | ===705.3.3 Sample Record=== | ||
====705.3.3.1 Prestressing Strand==== | ====705.3.3.1 Prestressing Strand==== | ||
− | The sample record shall be completed in | + | The sample record shall be completed in AASHTOWARE Project (AWP), as described in [https://epg.modot.org/forms/CM/AWP_MA_Sample_Record_General.docx AWP MA Sample Record, General], and shall indicate acceptance, qualified acceptance, or rejection. Appropriate remarks, as described in [[106.20 Reporting|EPG 106.20 Reporting]], are to be included in the report to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate template under the Tests tab. |
====705.3.3.2 Concrete Cylinders==== | ====705.3.3.2 Concrete Cylinders==== | ||
− | Test results shall be reported through | + | Test results shall be reported through AWP with the notation, "Specimens submitted for compressive strength at the age indicated and the test results are for informational purposes only". |
Latest revision as of 08:01, 24 November 2021
Contents
705.1 Construction Inspections for Sec 705
Bridge Repair and Strengthening, PC |
Report 1999 |
Report 2001 |
Report 2001 |
Prestress Concrete, Compressive Strength |
Report 2004 |
Summary 2004 |
Precast-Prestressed Bridge Deck Panels |
Spalling Solution Precast-Prestressed Bridge Deck Panels, 2010 |
See also: Research Publications |
Prestressed girders are normally inspected at the fabricating plant. Inspection reports will be furnished by the Construction and Materials Division. Pre-stressed girders must be handled and stored in an upright position. Failure to observe pick-up points can cause serious damage to the girder. When pre-stressed girders arrive on the project, they should be checked for shipping or handling damage. Each unit should also be checked against the inspection report. Once girders have been erected forming of the deck and placement of concrete is similar to practices followed for steel structures. The units normally have appreciable camber until the deck is in place.
705.2 Materials Inspection for Sec 705
Please refer to Fabricating Prestressed Concrete Members for Bridges for inspection of Prestressed Concrete Members for Bridges.
705.3 Laboratory Testing for Sec 705
705.3.1 Scope
This guidance establishes procedures for Laboratory testing and reporting samples of prestressing steel strand and concrete cylinders representing material used in prestressed concrete members for bridges.
705.3.2 Procedure
705.3.2.1 Prestressing Strand
Tests for stress-relieved strand shall consist of examination for fabrication requirements and tension tests performed according to AASHTO M203 or AASHTO M204, as applicable.
705.3.2.2 Concrete Cylinders
Concrete cylinders shall be tested for compressive strength according to AASHTO T22.
705.3.3 Sample Record
705.3.3.1 Prestressing Strand
The sample record shall be completed in AASHTOWARE Project (AWP), as described in AWP MA Sample Record, General, and shall indicate acceptance, qualified acceptance, or rejection. Appropriate remarks, as described in EPG 106.20 Reporting, are to be included in the report to clarify conditions of acceptance or rejection. Test results shall be reported on the appropriate template under the Tests tab.
705.3.3.2 Concrete Cylinders
Test results shall be reported through AWP with the notation, "Specimens submitted for compressive strength at the age indicated and the test results are for informational purposes only".