Difference between revisions of "Category:619 Pavement Edge Treatment"
Jump to navigation
Jump to search
m (Per TS, minor clarification) |
m (updated broken link) |
||
Line 10: | Line 10: | ||
This safety treatment eliminates the vertical drop-off at the pavement edge, allowing drifting vehicles to return to the pavement safely. Vehicles may leave the roadway for various reasons and this sloped pavement edge treatment enhances drivers' opportunity to return to the roadway while maintaining control of their vehicle. | This safety treatment eliminates the vertical drop-off at the pavement edge, allowing drifting vehicles to return to the pavement safely. Vehicles may leave the roadway for various reasons and this sloped pavement edge treatment enhances drivers' opportunity to return to the roadway while maintaining control of their vehicle. | ||
− | Criteria for pavement edge treatment are shown on [https://www.modot.org/media/16895 Standard Plan 619.10] and are described in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=9 Sec 619] of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with [http:// | + | Criteria for pavement edge treatment are shown on [https://www.modot.org/media/16895 Standard Plan 619.10] and are described in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=9 Sec 619] of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with [http://sp/sites/cm/Pages/default.aspx Construction and Materials] is recommended. |
Latest revision as of 11:19, 17 February 2022
Additional Information |
Shoulder Edge Ruts and Settlement Maintenance |
This safety treatment eliminates the vertical drop-off at the pavement edge, allowing drifting vehicles to return to the pavement safely. Vehicles may leave the roadway for various reasons and this sloped pavement edge treatment enhances drivers' opportunity to return to the roadway while maintaining control of their vehicle.
Criteria for pavement edge treatment are shown on Standard Plan 619.10 and are described in Sec 619 of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with Construction and Materials is recommended.