Difference between revisions of "771.9 Temporary Bridge Deck Repair"

From Engineering_Policy_Guide
Jump to navigation Jump to search
(Added Links to Innovation Library.)
m (updated link)
 
(5 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
|}
 
|}
 
Temporary bridge deck repair is done to fill the holes in the deck to prevent the accumulation of dirt, debris and chlorides that will accelerate deck deterioration, to provide a smooth safe riding surface for the public and reduce the tire impact loading until permanent repairs can be made.
 
Temporary bridge deck repair is done to fill the holes in the deck to prevent the accumulation of dirt, debris and chlorides that will accelerate deck deterioration, to provide a smooth safe riding surface for the public and reduce the tire impact loading until permanent repairs can be made.
 +
{|style="padding: 0.3em; margin-left:5px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
 +
|-
 +
|'''Additional Information'''
 +
|-
 +
|[[:Category:948 Incident Response Plan and Emergency Response Management|EPG 948 Incident Response Plan and Emergency Response Management]]
 +
|}
 +
Holes in bridge decks should be safeguarded from traffic as soon as possible.  Repairs should be completed with  higher urgency than routing maintenance as weather permits. Consult the patching materials manufacturer’s guide for the weather limitations for use.
  
Holes in bridge decks should be filled as soon as possible as weather permits. Consult the patching materials manufacturer’s guide for the weather limitations for use.
+
==Materials==
 
 
 
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right"  
 
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right"  
 
|-
 
|-
 
|'''Bridge Deck, Repair'''
 
|'''Bridge Deck, Repair'''
 
|-
 
|-
|[http://library.modot.mo.gov/RDT/reports/Ri97025/RDT02002.pdf Report 2002]
+
|[https://spexternal.modot.mo.gov/sites/cm/CORDT/RDT02002.pdf Report 2002]
 
|-
 
|-
|'''See also:''' [http://www.modot.gov/services/OR/byDate.htm Innovation Library]
+
|'''See also:''' [https://www.modot.org/research-publications Research Publications]
 
|}
 
|}
 
==Materials==
 
 
Commercial patching materials have different abilities and characteristics. Examples are Instant Road Repair, UPM, Pavon and chips, etc. Hot mix asphalt can also be used when available.
 
Commercial patching materials have different abilities and characteristics. Examples are Instant Road Repair, UPM, Pavon and chips, etc. Hot mix asphalt can also be used when available.
  
 
'''General Note''': Consult the manufacturer’s guidelines about preparation and placement. In general, a cleaner and drier repair area prior to filling will provide a better result.
 
'''General Note''': Consult the manufacturer’s guidelines about preparation and placement. In general, a cleaner and drier repair area prior to filling will provide a better result.
  
[[Category:771 Bridge Preventative Maintenance Guidelines|771.09]]
+
[[Category:771 Bridge Preventive Maintenance Guidelines|771.09]]

Latest revision as of 11:16, 22 June 2022

Code: R323

Temporary bridge deck repair is done to fill the holes in the deck to prevent the accumulation of dirt, debris and chlorides that will accelerate deck deterioration, to provide a smooth safe riding surface for the public and reduce the tire impact loading until permanent repairs can be made.

Additional Information
EPG 948 Incident Response Plan and Emergency Response Management

Holes in bridge decks should be safeguarded from traffic as soon as possible. Repairs should be completed with higher urgency than routing maintenance as weather permits. Consult the patching materials manufacturer’s guide for the weather limitations for use.

Materials

Bridge Deck, Repair
Report 2002
See also: Research Publications

Commercial patching materials have different abilities and characteristics. Examples are Instant Road Repair, UPM, Pavon and chips, etc. Hot mix asphalt can also be used when available.

General Note: Consult the manufacturer’s guidelines about preparation and placement. In general, a cleaner and drier repair area prior to filling will provide a better result.