Difference between revisions of "103.2 Contract Bond for Sec 103.4"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per CM, additional guidance for Sec 103.4 in this new article)
 
(updated per RR3958)
 
(5 intermediate revisions by one other user not shown)
Line 1: Line 1:
[http://www.modot.mo.gov/business/standards_and_specs/Sec0103.pdf Sec. 103.4] provides information regarding the contract bond.
+
</br>
 
+
<div style="text-align: center; margin-top:0; margin-right:auto; margin-bottom:0; margin-left:auto; border:1px solid black; width:50%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">
The contractor may be reimbursed for contract bond if an invoice of the bond cost is provided.  The mobilization line item is reduced by the bond amount when the bond is reimbursed.  The reduction in mobilization is achieved by issuing a change order in the SM system.  If the change order is exclusively issued to pay bond, then the contractor’s signature on the change order may be waived.  Higher level change order approvals of a bond reimbursement change order are not required except for approval by FHWA on full oversight jobs.
+
</br>
 
+
<b>This article has been removed.  You can still view the history of this article by selecting the View history button.</b></br>
[[Category:103 Award and Execution of Contract]]
+
<b>See [https://www.modot.org/missouri-standard-specifications-highway-construction Missouri Standard Specifications for Highway Construction Sec 103.4 Contract Bond Required] for more information.</b>
 +
</br>
 +
</br>
 +
</div>

Latest revision as of 11:39, 19 November 2024



This article has been removed. You can still view the history of this article by selecting the View history button.
See Missouri Standard Specifications for Highway Construction Sec 103.4 Contract Bond Required for more information.