105.3. Conformity with Contract Documents (Sec 105.3): Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
created page 105.3 moved from 105
 
mNo edit summary
 
Line 2: Line 2:
Refer to [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 105.3] for instructions regarding the requirements that work be in compliance with the specifications and the action to take when work is unacceptable.
Refer to [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 105.3] for instructions regarding the requirements that work be in compliance with the specifications and the action to take when work is unacceptable.


[[Category:105 Control of Work]]
[[Category:105 Control of Work|105.03]]

Latest revision as of 12:03, 28 February 2025

Refer to Sec 105.3 for instructions regarding the requirements that work be in compliance with the specifications and the action to take when work is unacceptable.