105.3. Conformity with Contract Documents (Sec 105.3): Difference between revisions
Jump to navigation
Jump to search
created page 105.3 moved from 105 |
mNo edit summary |
||
Line 2: | Line 2: | ||
Refer to [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 105.3] for instructions regarding the requirements that work be in compliance with the specifications and the action to take when work is unacceptable. | Refer to [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 105.3] for instructions regarding the requirements that work be in compliance with the specifications and the action to take when work is unacceptable. | ||
[[Category:105 Control of Work]] | [[Category:105 Control of Work|105.03]] |
Latest revision as of 12:03, 28 February 2025
Refer to Sec 105.3 for instructions regarding the requirements that work be in compliance with the specifications and the action to take when work is unacceptable.