Category:106.3.2 Material Inspection Test Methods: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
No edit summary
moved category to a page so it will be in the correct order
Tag: New redirect
 
Line 1: Line 1:
#REDIRECT [[106.3.2_Material_Inspection_Test_Methods]]
<!--
[[image:106.3.2.jpg|right|375px|thumb|<center>'''M-TRAC certifies and helps develops training for MoDOT Test Methods'''</center>]]  
[[image:106.3.2.jpg|right|375px|thumb|<center>'''M-TRAC certifies and helps develops training for MoDOT Test Methods'''</center>]]  


Line 32: Line 35:


When a non-MoDOT specification is changed the newest version should be followed.  If the change made to a non-MoDOT specification negatively impacts the contractor, supplier or MoDOT, the case should be examined and the best course of action determined.  Central Office Construction and Materials should be notified when a change in ASTM or AASHTO impacts MoDOT business.
When a non-MoDOT specification is changed the newest version should be followed.  If the change made to a non-MoDOT specification negatively impacts the contractor, supplier or MoDOT, the case should be examined and the best course of action determined.  Central Office Construction and Materials should be notified when a change in ASTM or AASHTO impacts MoDOT business.
-->

Latest revision as of 14:15, 10 April 2025