Category:103 Award and Execution of Contract: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
m linked to cat 100
m updated formatting
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="300px" align="right"
<div style="float: right; margin: 5px; margin-bottom: 10px; padding: 10px; border: 1px solid black; border-radius:5px; box-shadow:5px 5px 5px #888888">
|-
<categorytree mode=all>103 Award and Execution of Contract</categorytree>
|'''[http://www.modot.org/bidding/ MoDOT Bidding and Contracting Opportunities]'''
</div>
|-
|This site is where you start to bid on a MoDOT project, supply request, building contract, training opportunity, property for sale, surplus offer or anything else.
|}
The goal of MoDOT’s bid opening and award process (also see [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec. 103] of the Missouri Standard Specifications for Highway Construction) is to achieve competitive bids by packaging projects in a manner that makes them as attractive as possible to potential bidders.  Methods of achieving this goal include, but are not limited to, establishing appropriate bid opening dates for the type of work, maintaining a stable bid opening schedule, and grouping or dividing projects to make them more appealing to bidders.


[[Category:100 General]]
<div style="float: right; margin-top: 5px; margin-left: 15px; width:320px; font-size: 95%; background-color: #f8f9fa; padding: 0.3em; border: 1px solid #a2a9b1; text-align:left;">
'''<u><center>[http://www.modot.org/bidding/ MoDOT Bidding and Contracting Opportunities]</center></u>'''
This site is where you start to bid on a MoDOT project, supply request, building contract, training opportunity, property for sale, surplus offer or anything else.
</div>
 
The goal of MoDOT’s bid opening and award process (also see [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 103] of the Missouri Standard Specifications for Highway Construction) is to achieve competitive bids by packaging projects in a manner that makes them as attractive as possible to potential bidders. Methods of achieving this goal include, but are not limited to, establishing appropriate bid opening dates for the type of work, maintaining a stable bid opening schedule, and grouping or dividing projects to make them more appealing to bidders.
 
 
[[Category:100_GENERAL]]

Latest revision as of 07:18, 30 April 2025

MoDOT Bidding and Contracting Opportunities

This site is where you start to bid on a MoDOT project, supply request, building contract, training opportunity, property for sale, surplus offer or anything else.

The goal of MoDOT’s bid opening and award process (also see Sec 103 of the Missouri Standard Specifications for Highway Construction) is to achieve competitive bids by packaging projects in a manner that makes them as attractive as possible to potential bidders. Methods of achieving this goal include, but are not limited to, establishing appropriate bid opening dates for the type of work, maintaining a stable bid opening schedule, and grouping or dividing projects to make them more appealing to bidders.

Articles in "103 Award and Execution of Contract"

This category contains only the following page.