Talk:903.15 Typical Signing Applications: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
2-lane vs. 4-lane TA's
 
m Hoskir moved page Talk:903.16 Typical Signing Applications to Talk:903.15 Typical Signing Applications: renumbered due to MUTCD Update (See Special Ballot)
 
(2 intermediate revisions by one other user not shown)
(No difference)

Latest revision as of 10:34, 31 December 2025

I'm looking at figure 903.13.3 and 903.13.4 that show 400' and 800' distances for sign locations on two lane roads. But figure 903.13.8 doesn't have any distances shown for the divided highway example. Should we use the same distances, or should they be based on the speed limit?