102.1 Construction Inspection Guidance for Sec 102: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
No edit summary
mNo edit summary
 
(8 intermediate revisions by 2 users not shown)
Line 1: Line 1:
Bidding requirements and conditions for contractors are addressed in [http://www.modot.mo.gov/business/standards_and_specs/Sec0102.pdf Sec 102] of the Missouri Standard Specifications for Highway Construction.
[[image:102.1.jpg|right|250px]]


[[Category:102 Bidding Requirements and Conditions]]
Bidding requirements and conditions for contractors are addressed in [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 102] of the Missouri Standard Specifications for Highway Construction.
 
The Commission accepts bids for projects under conditions established by [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 102] of the Missouri Standard Specifications for Highway Construction. Sec 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications. The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures.
 
[[Category:102 Bidding Requirements and Conditions|102.01]]

Latest revision as of 14:43, 23 January 2026

Bidding requirements and conditions for contractors are addressed in Sec 102 of the Missouri Standard Specifications for Highway Construction.

The Commission accepts bids for projects under conditions established by Sec 102 of the Missouri Standard Specifications for Highway Construction. Sec 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications. The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures.