Category:208 Interception Ditch: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
add new article
 
Smithk (talk | contribs)
m updated link
 
Line 1: Line 1:
==208.1 Construction Inspection Guidance for [http://www.modot.mo.gov/business/standards_and_specs/Sec0208.pdf Sec 208]==
==208.1 Construction Inspection Guidance for [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=5 Sec 208]==


On projects where erosion is expected to be a serious problem, interception ditches, or levees, or both may be shown on the plans.
On projects where erosion is expected to be a serious problem, interception ditches, or levees, or both may be shown on the plans.

Latest revision as of 14:23, 8 June 2016

208.1 Construction Inspection Guidance for Sec 208

On projects where erosion is expected to be a serious problem, interception ditches, or levees, or both may be shown on the plans.

Description (Sec 208.1)

As specified.

Construction Requirements (Sec 208.2)

As specified.

Method of Measurement (Sec 208.3)

Measurement of interception ditches is to be made along the flow line of the ditch and recorded in a bound field book.

Basis of Payment (Sec 208.4)

As specified.