102.1 Construction Inspection Guidance for Sec 102: Difference between revisions

From Engineering_Policy_Guide
Jump to navigation Jump to search
add new article
 
Smithk (talk | contribs)
m updated links
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
Bidding requirements and conditions for contractors are addressed in [http://www.modot.mo.gov/business/standards_and_specs/Sec0102.pdf Sec 102] of the Missouri Standard Specifications for Highway Construction.
[[image:102.1.jpg|right|250px]]
Bidding requirements and conditions for contractors are addressed in [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 102] of the Missouri Standard Specifications for Highway Construction.
 
The Commission accepts bids for projects under conditions established by [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec. 102] of the Missouri Standard Specifications for Highway Construction. Sec. 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications.  The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures.
 
 
 
[[Category:102 Bidding Requirements and Conditions]]

Latest revision as of 11:18, 8 June 2016

Bidding requirements and conditions for contractors are addressed in Sec 102 of the Missouri Standard Specifications for Highway Construction.

The Commission accepts bids for projects under conditions established by Sec. 102 of the Missouri Standard Specifications for Highway Construction. Sec. 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications. The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures.