Difference between revisions of "Category:735 Culvert Pipe Liner"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (updated link)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 
==Maintenance Planning Guideline==
 
==Maintenance Planning Guideline==
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"
+
See [[:Category:170 Maintenance Activity Planning Guidelines#R319 Pipe Culvert Repairs (LF)|Maintenance Planning Guide for Installing Pipe Liners]].
|- 
 
|'''Code:''' R319
 
|}
 
'''Definition'''
 
  
The time and expenses incurred from removing and replacing pipe culverts. Includes time and expenses incurred for installing a new lining in an existing culvert.
+
Index of all [[:Category:170 Maintenance Activity Planning Guidelines#Index of Printable Planning Guides|Maintenance Planning Guidelines]].
 
 
'''Purpose'''
 
 
 
To install new pipe liners in existing pipe culverts.
 
 
 
'''Scheduling'''
 
 
 
As needed year around.
 
 
 
'''Recommended Equipment'''
 
 
 
*Trucks
 
*Backhoe
 
*Loader
 
*Mudjack or Concrete Mixer
 
*Traffic Control Equipment (see [[616.23 Traffic Control for Field Operations|Traffic Control for Field Operations]])
 
 
 
'''Recommended Material'''
 
 
 
*Pipe Liner
 
*Slurry Mix
 
*Portland Cement
 
*Agricultural Lime
 
*Water
 
 
 
'''Recommended Procedure'''
 
 
 
1. Consult district Design on size and placement of pipe liner.
 
 
 
2. Call Dig Rite and MoDOT to check for utilities.
 
 
 
3. Place traffic control devices as needed.
 
 
 
4. Clean out ditch, if necessary, to make room for liner.
 
 
 
5. Insert liner.
 
 
 
6. Form upstream and downstream ends and mudjack between liner and existing pipe.
 
 
 
7. Grade and reshape shoulder, as necessary.
 
 
 
8. Seed and mulch, as necessary
 
 
 
9. Clean work area.
 
 
 
10. Remove traffic control devices.
 
 
 
'''Safety'''
 
 
 
Call before you dig to locate utilities '''(1-800-DIG-RITE)'''. Watch out for "pinch points." Wear all appropriate PPE. Reference the [http://lnapp1/RI/RIManual.NSF/SHToC?OpenView Safety Policies, Rules & Regulations-Employee Handbook.]
 
 
 
'''Other Considerations'''
 
 
 
Use appropriate size liner for application. Follow manufacture’s instructions on installation.
 
 
 
'''References'''
 
 
 
[http://modot.mo.gov/business/standards_and_specs/Sec0735.pdf Standard Specifications Sec 735]
 
 
 
{|
 
|[[Image:735 Pipe Liner1.jpg|400px]] || [[Image:735 Pipe Liner2.jpg|400px]]
 
|-
 
|text align="center"|'''Rusted Out Pipe Invert''' || text align="center"|'''Pipe Liner Installation'''
 
|-
 
|[[Image:735 Pipe Liner3.jpg|400px]] || [[Image:735 Pipe Liner4.jpg|400px]]
 
|-
 
|text align="center"|'''Pipe Liner Installation''' || text align="center"|'''Pipe Liner Installation'''
 
|-
 
|[[Image:735 Pipe Liner5.jpg|400px]] || [[Image:735 Pipe Liner6.jpg|400px]]
 
|-
 
|text align="center"|'''Pipe Liner Installation''' || text align="center"|'''Pipe Liner Installation '''
 
|-
 
|[[Image:735 Pipe Liner7.jpg|400px]] || [[Image:735 Pipe Liner8.jpg|400px]]
 
|-
 
|text align="center"|'''Pipe Liner Installation''' || text align="center"|'''Pipe Liner Installation'''
 
|-
 
|[[Image:735 Pipe Liner9.jpg|400px]] || [[Image:735 Pipe Liner10.jpg|400px]]
 
|-
 
|text align="center"|'''Pipe Liner Installation''' || text align="center"|'''Grouting Pipe Liner to Culvert End'''
 
|-
 
|[[Image:735 Pipe Liner11.jpg|400px]] || [[Image:735 Pipe Liner12.jpg|400px]]
 
|-
 
|text align="center"|'''Grouted Pipe Liner''' || text align="center"|'''Finished Product'''
 
|}
 

Latest revision as of 10:02, 22 July 2016