Difference between revisions of "Federal-Aid Acceptance Sampling and Testing"
Jump to navigation
Jump to search
m (Per Physical Lab, guidance provided for this chart) |
m (Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing approach on "On-system" work.) |
||
Line 1: | Line 1: | ||
− | + | {|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="340px" align="center" | |
− | |||
− | |||
− | |||
− | {| | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | + | |'''This article's information has moved''' | |
|- | |- | ||
− | | | + | |The "Stabilized Permeable Base" information from Federal-Aid Acceptance Sampling and Testing has moved to [http://epg.modot.org/index.php?title=Category:302_Stabilized_Permeable_Base#302.2.1.1_Production_Testing EPG 302.2.1.1]. The "Modified Subgrade" information was moved to [http://epg.modot.org/index.php?title=Category:205_Modified_Subgrade#205.2.2.3.7_Production_Testing EPG 205.2.2.3.7]. |
− | |||
− | |||
|} | |} |
Latest revision as of 11:38, 18 October 2012
This article's information has moved |
The "Stabilized Permeable Base" information from Federal-Aid Acceptance Sampling and Testing has moved to EPG 302.2.1.1. The "Modified Subgrade" information was moved to EPG 205.2.2.3.7. |