106.8 Material Furnished by the Commission: Difference between revisions
Jump to navigation
Jump to search
m Per CM, for greater clarity,old EPG 106.8 (1047 hits) was moved to EPG 106.19 to align with Sec 106. |
m updated formatting |
||
| (One intermediate revision by one other user not shown) | |||
| Line 1: | Line 1: | ||
[ | [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 106.8] provides information regarding material furnished by the Commission. The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project. | ||
[[category: 106 Control of Material|106.08]] | [[category: 106 Control of Material|106.08]] | ||
Latest revision as of 11:39, 15 April 2025
Sec 106.8 provides information regarding material furnished by the Commission. The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project.