106.8 Material Furnished by the Commission: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m Per CM, for greater clarity,old EPG 106.8 (1047 hits) was moved to EPG 106.19 to align with Sec 106.
 
m updated formatting
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
[http://www.modot.mo.gov/business/standards_and_specs/Sec0106.pdf Sec 106.8] provides information regarding material furnished by the Commission.  The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project.  
[https://www.modot.org/missouri-standard-specifications-highway-construction Sec 106.8] provides information regarding material furnished by the Commission.  The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project.  




[[category: 106 Control of Material|106.08]]
[[category: 106 Control of Material|106.08]]

Latest revision as of 11:39, 15 April 2025

Sec 106.8 provides information regarding material furnished by the Commission. The Resident Engineer needs to monitor and facilitate this process so that Commission provided materials are provided in a timely manner and do not delay the progress of the project.