106.14 Proprietary Items: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
m Per CM, for greater clarity,old EPG 106.14 (9228 hits - no appreciable history) was moved to EPG 106.11. New EPG 106.14 is aligned with Sec 106
 
m updated formatting
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
[http://www.modot.mo.gov/business/standards_and_specs/Sec0106.pdf Sec 106.14] describes actions to be taken when a [[131.2 Proprietary Items and Public Interest Findings|proprietary item]] becomes unavailable during the term of a contract.
[https://www.modot.org/missouri-standard-specifications-highway-construction Sec 106.14] describes actions to be taken when a [[131.2 Proprietary Items and Public Interest Findings|proprietary item]] becomes unavailable during the term of a contract.
 


[[category: 106 Control of Material|106.14]]
[[category: 106 Control of Material|106.14]]

Latest revision as of 12:21, 15 April 2025

Sec 106.14 describes actions to be taken when a proprietary item becomes unavailable during the term of a contract.